euNetworks to Shut Down Amsterdam Data Center
July 25, 2025
Amsterdam
The campus will consist of three 12-story data center towers with each containing 370,000 sqft and 30 MW's of power.
| Distance | Site | About |
|---|---|---|
| 1.38 miles | Equinix Amsterdam AM8 | |
| 1.38 miles | Capitaland: Gyroscoopweg |
Gyroscoopweg is a triple net powered shell data centre comprising two separate three-storey buildings of brick construction with metal cladding on the upper floors.
|
| 1.59 miles | PCextreme Gyro Center | |
| 1.59 miles | nLighten: AMS1 |
nLighten, the new regional edge data center firm from I Squared Capital, has entered the Netherlands market by acquiring a data center in Amsterdam.
|
| 1.83 miles | NorthC: Amsterdam |
|
| 1.90 miles | Databarn Amsterdam | |
| 2.73 miles | Capgemini Amsterdam | |
| 2.75 miles | ServerFarm: Amsterdam AMS1 |
In 2019, Serverfarm extended its portfolio with a strategic data center acquisition in Amsterdam.
|
| 3.70 miles | Global Switch: Amsterdam East |
Located adjacent to Global Switch's existing Amsterdam West data center, Amsterdam East expands the campus by offering 32,000 sq m of space with technical suites to accommodate high-performance computing needs.
|
| 3.70 miles | Global Switch: Amsterdam West |
Global Switch Amsterdam is located in the Slotevaart/Overtoomseveld district, adjacent to the main Dutch cable infrastructure. The site is 2km from the financial district and city center.
|
| 3.70 miles | Lumen Amsterdam (Johan Huizingalaan) |
|
| 3.85 miles | Cogent Halfweg | |
| 3.97 miles | AtlasEdge: Amsterdam | |
| 4.14 miles | House of Data: Amsterdam |
New Dutch operator House of Data plans to build a data center in Amsterdam.
|
| 4.36 miles | Goodman: Amsterdam |
The Goodman Group intends to develop a two-building data center campus in Amsterdam.
|
| 4.43 miles | Goodman: AMS1 Bldg-B |
This planned facility is part of Goodman Group's Amsterdam data center campus.
|
| 4.52 miles | CyrusOne: AMS1 Bldg 2 |
CyrusOne's AMS1 offers 29,720 sqm (320,000 sq ft) of technical space across a campus of two separate buildings. The campus is located on SADC’s PolanenPark campus, around 15 kilometers west of central Amsterdam.
|
| 4.59 miles | CyrusOne Amsterdam I |
CyrusOne's AMS1 offers 29,720 sqm (320,000 sq ft) of technical space across a campus of two separate buildings. The campus is located on SADC’s PolanenPark campus, around 15 kilometers west of central Amsterdam.
|
| 5.06 miles | CapitaLand: Cateringweg |
CapitaLand acquired the former NAP of Amsterdam in 2021. It was a former Terremark site.
|
| 5.32 miles | Cellnex: Amsterdam |
|
| 5.78 miles | Cellnex: Haarlem |
The telecom & data tower in the Waarderpolder has been in use since 1972.
|
| 5.80 miles | KPN Haarlem | |
| 5.80 miles | Penta Infra: Haarlem |
The facility, previously owned by KPN for its hosting and data center services, was acquired by European firm Penta Infra in 2023.
|
| 5.94 miles | Iron Mountain Amsterdam AMS-1 |
Originally built by EvoSwitch, Iron Mountain's AMS-1 campus is one of the largest carbon-neutral multitenant data centers in the Netherlands. Purpose-built from concrete and steel, the site has containerized modular suites to support a PUE of 1.2.
|
| 5.94 miles | PhoenixNAP Amsterdam | |
| 6.40 miles | CapitaLand: Paul van Vlissingenstraat |
CapitaLand Ascendas REIT acquired this site in 2021.
|
| 6.43 miles | euNetworks Amsterdam | |
| 6.54 miles | Switch Datacenters: Amsterdam 7 |
Switch Datacenters AMS7, along with AMS5 and AMS7, forms a triangle of new, power-dense developments. It is uniquely located in the Schiphol area.
|
| 6.68 miles | NIKHEF Science Park 105 | |
| 6.70 miles | Digital Realty: AMS18 (Amstel Business Park) |
Digiltal Realty's Amstel Business Park data centre in Amsterdam provides 2,700m² of floor space.
|
| 6.71 miles | Digital Realty: AMS17 |
The 11 story, 72m-tall building has 5,000 sq m (54,000 sq ft) of data space on 13 floors, and 9MW of power. The building uses outside air and groundwater for cooling, and also stores warm water underground.
|
| 6.74 miles | Digital Realty: AMS9 |
In February 2017, the site was acquired from Vancis Holding BV. Source: Interxion Press Release
|
| 6.77 miles | Iron Mountain: AMS-2 |
Iron Mountain has been associated with a new data center project in North Holland, Netherlands, constructed by the Dutch company Heijmans.
|
| 6.77 miles | Lumen Amsterdam (Joop Geesinkweg) |
|
| 6.78 miles | Equinix Amsterdam AM6 | |
| 6.88 miles | DataOne: Amsterdam 1 |
The DataOne data center, located at Bruynvisweg 11, Wormer, Amsterdam, Netherlands, was established in 2011 and is operated by DataOne BV.
|
| 6.89 miles | AtlasEdge: Amsterdam Van der Madeweg |
AtlasEdge Amsterdam South East Data Centre is a carrier neutral data centre that offers 742 sqm of colocation capacity.
|
| 6.95 miles | IPTP Networks Matrix 4 - Science Park 404 | |
| 6.98 miles | NorthC: Oude Meer |
The site was formerly operated by KPN
|
| 7.08 miles | Cellnex: Wormer |
Acquired by Cellnex in 2007, this telecom and data tower was among the first five radio masts to be upgraded with a datacenter,
|
| 7.10 miles | Lightedge: Amsterdam |
LightEdge’s "Amsterdam Data Center" is essentially a white-label or resold solution physically located within an Equinix facility.
|
| 7.11 miles | Equinix Amsterdam AM3 Science Park |
Equinix's Amsterdam AM3 data center was opened in October 2012.
|
| 7.11 miles | Contegix Amsterdam | |
| 7.14 miles | Equinix Amsterdam AM4 |
In 2017, Equinix opened AM4, an eight story datacenter constructed next to AM3 in Science Park.
|
| 7.80 miles | Digital Realty: AMS6 | |
| 7.84 miles | EdgeConnex: AMS09 |
EdgeConnex is Building another data center in it's Schiphol-Rijk campus in Amsterdam.
|
| 7.85 miles | Digital Realty: AMS11 |
Digital realty is building another data center at Schiphol-Rijk Campus. The data center will be built in two phases.
|
| 7.85 miles | Digital Realty: AMS3 |
|
| 7.85 miles | Internap AMS Cessnalaan 1-33 | |
| 7.86 miles | EdgeConnex: AMS05 |
|
| 7.89 miles | EdgeConnex: AMS07 |
In August 2022, EdgeConneX acquired an additional plot of land in Schiphol and planned to build the AMS07 facility.
|
| 7.90 miles | EdgeConnex Amsterdam |
EdgeConneX's Amsterdam Campus is located in Schiphol-Rijk. The campus features both multi-tenant colocation and single-tenant facilities with over 34,000 sqm of total space.
|
| 7.92 miles | EdgeConnex: AMS02 |
|
| 7.95 miles | EdgeConnex: AMS03 |
|
| 7.96 miles | GTT Amsterdam (Schiphol Rijk) |
|
| 7.96 miles | maincubes AMS01 |
Total IT area 4,400 sqm over rooms of various sizes (170sqm to 1,100 sqm)
|
| 8.06 miles | Switch Datacenters: AMS3 |
Switch's AMS3 site, located in the Amsterdam South East business district, was a logistics building converted into a data center in 2017.
|
| 8.08 miles | Datacenter.com AMS1 | |
| 8.09 miles | EdgeConnex: AMS04 |
|
| 8.09 miles | Digital Realty: AMS7 |
|
| 8.13 miles | NTT Amsterdam 1 |
The facility near the Schiphol airport will be built in four phases, each delivering 4,000 square meters (43,055 sq ft) of technical space. It will offer both wholesale and retail colocation services.
|
| 8.14 miles | NTT: AMS1 (C&D) |
NTT's Amsterdam 1 Data Center is expanding, with Buildings C and D adding an additional 9,720m² of IT space.
|
| 8.24 miles | EdgeConnex: AMS06 |
EdgeConneX EDCAMS06 data center is located in Schiphol-Rijk, Amsterdam. In August 2022, EdgeConneX began construction on its 6th data center in Schiphol, and in 2024 it came online.
|
| 8.25 miles | CloudHQ: Amsterdam AMS |
Situated just south of Amsterdam’s Schiphol airport in the Schiphol-Rijk area, next to another hyperscale data center, CloudHQ’s AMS campus will consist of a single multi-story data center.
|
| 8.27 miles | Digital Realty: AMS5 |
Redundant 20 MVA 100% green supply, enabling high-density power confi gurations up to 25 kW/rack
|
| 8.27 miles | INAP AMS Tupolevlaan 101 | |
| 8.28 miles | Keppel Amsterdam | |
| 8.30 miles | nLighten: Amsterdam |
|
| 8.32 miles | Switch Datacenters: AMS4 |
Dutch colo provider Switch Datacenters has launched its fourth Amsterdam data center. The AMS4 facility was built on a former logistics site at the Amsterdam Science Park in the Oost district of the city.
|
| 8.48 miles | Equinix AM11 |
AM11 was acquired from Switch Datacenters in April 2019.
|
| 8.48 miles | Equinix Amsterdam AM7 | |
| 8.66 miles | Schuberg Philis |
|
| 8.70 miles | Digital Realty: AMS8 |
|
| 8.74 miles | Rackspace: Amsterdam AMS2 |
|
| 8.74 miles | Equinix AM2 | |
| 8.78 miles | Equinix AM1 | |
| 8.79 miles | INAP AMS Luttenbergweg 4 | |
| 8.79 miles | QuadraNet Amsterdam |
|
| 9.07 miles | Digital Realty: AMS16 |
|
| 9.07 miles | Digital Realty: Amsterdam AMS15 |
|
| 9.11 miles | KPN Amsterdam | |
| 9.12 miles | NorthC: Amsterdam 2 |
The NorthC Amsterdam 2 data center was added to the NorthC portfolio following its acquisition from Colt Technology Services in late 2025.
|
| 9.18 miles | Equinix Amsterdam AM5 |
The site was previously known as "Telecity AMS 5"
|
| 9.21 miles | Switch Datacenters: AMS6 |
The AMS6 site is currently being retrofitted from a logistics hall into a high-end, AI/HPC-ready data center.
|
| 9.50 miles | NorthC: Aalsmeer |
The Aalsmeer data center is part of a unique project for the exchange of residual heat.
|
| 15.96 miles | Datacenter Noord-Holland |
Datacenter Noord-Holland is located in Alkmaar and operates according to the TIER-3 standard.
|
| 16.24 miles | UNET Almere | |
| 18.46 miles | Cellnex: Hilversum |
The first radio mast for television (Nederland 1) was erected in Hilversum in 1951. This was later replaced in 1973 by a new mast on the Witte Kruislaan.
|
| 18.68 miles | Cellnex: Media Gateway Hilversum |
In 2021, Cellnex acquired Red Bee Media’s Media Gateway data center in Hilversum in the Netherlands.
|
| 18.97 miles | TCN Hilversum |
|
| 19.10 miles | Cellnex: Alphen aan den Rijn |
|
| 19.61 miles | Keppel Almere Netherlands |
Almere Data Centre is a three-storey facility built in 2008. NorthC is located in the building.
|
| 19.63 miles | NorthC Almere |
|
SilverFalcon is an innovative provider of data center solutions. SilverFalcon is building a state-of-the-art data center campus in Amsterdam. The Westpoort campus has world class reliability, efficiency, and sustainability. The overall campus, consisting of three buildings, offers approximately 40 thousand square meters of flexible and robust IT space in addition to logistics areas, storage, and offices.
July 25, 2025
Amsterdam
June 12, 2024
Amsterdam
April 03, 2023
Amsterdam
April 08, 2022
Amsterdam
September 17, 2021
Amsterdam
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas