|
0.02 miles
|
NorthC Almere
|
|
|
3.82 miles
|
UNET Almere
|
|
|
9.49 miles
|
Cellnex: Media Gateway Hilversum
|
In 2021, Cellnex acquired Red Bee Media’s Media Gateway data center in Hilversum in the Netherlands.
|
|
9.50 miles
|
Cellnex: Hilversum
|
The first radio mast for television (Nederland 1) was erected in Hilversum in 1951. This was later replaced in 1973 by a new mast on the Witte Kruislaan.
|
|
9.68 miles
|
TCN Hilversum
|
|
|
11.21 miles
|
Point TwoInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
12.65 miles
|
VOLT: AMS4
|
Volt launched its operations by utilizing capacity from Switch Datacenters' existing AMS4 facility.
|
|
12.65 miles
|
Switch Datacenters: AMS4
|
Dutch colo provider Switch Datacenters has launched its fourth Amsterdam data center. The AMS4 facility was built on a former logistics site at the Amsterdam Science Park in the Oost district of the city.
|
|
12.97 miles
|
Equinix: Amsterdam AM4
|
AM4 is Equinix's 12-storey, roughly 72 m data center tower beside AM3 at Amsterdam Science Park, with eight data hall floors and aquifer thermal energy storage cooling.
|
|
12.99 miles
|
Equinix: Amsterdam AM3
|
AM3 is Equinix's five-storey data center at Science Park 610 in Amsterdam, cooled with aquifer thermal energy storage and offering the Equinix Internet Exchange plus AMS-IX and NL-ix access.
|
|
12.99 miles
|
Contegix Amsterdam
|
|
|
13.01 miles
|
Lightedge: Amsterdam
|
LightEdge’s "Amsterdam Data Center" is essentially a white-label or resold solution physically located within an Equinix facility.
|
|
13.10 miles
|
IPTP Networks Matrix 4 - Science Park 404
|
|
|
13.26 miles
|
Cellnex: Lelystad
|
Constructed in 1975, this prominent structure was acquired by Cellnex in 2007, along with 23 other towers, from KPN.
|
|
13.34 miles
|
Digital Realty: AMS9
|
In February 2017, the site was acquired from Vancis Holding BV. Source: Interxion Press Release
|
|
13.37 miles
|
Digital Realty: AMS17
|
The 11 story, 72m-tall building has 5,000 sq m (54,000 sq ft) of data space on 13 floors, and 9MW of power. The building uses outside air and groundwater for cooling, and also stores warm water underground.
|
|
13.41 miles
|
NIKHEF Science Park 105
|
|
|
13.95 miles
|
KPN Amsterdam
|
|
|
14.20 miles
|
Equinix Amsterdam AM6
|
|
|
14.29 miles
|
NorthC: Amsterdam 2
|
The NorthC Amsterdam 2 data center was added to the NorthC portfolio following its acquisition from Colt Technology Services in late 2025.
|
|
14.33 miles
|
Digital Realty: AMS18 (Amstel Business Park)
|
Digiltal Realty's Amstel Business Park data centre in Amsterdam provides 2,700m² of floor space.
|
|
14.34 miles
|
Equinix: Amsterdam AM10
|
Equinix plans AM10 as the later component of its new Amsterdam-Zuidoost development, with construction dependent on future expansion of the city's constrained electricity grid.
|
|
14.35 miles
|
Lumen Amsterdam (Joop Geesinkweg)
|
|
|
14.38 miles
|
Equinix: Amsterdam AM9
|
Equinix plans to develop AM9 as the first phase of a new four-tower data center development in Amsterdam's Amstel III district, with the initial High Tower building moving through permitting.
|
|
14.43 miles
|
Equinix AM1
|
|
|
14.44 miles
|
QuadraNet Amsterdam
|
|
|
14.44 miles
|
INAP AMS Luttenbergweg 4
|
|
|
14.44 miles
|
Equinix AM2
|
|
|
14.45 miles
|
Rackspace: Amsterdam AMS2
|
|
|
14.49 miles
|
Equinix Amsterdam AM5
|
The site was previously known as "Telecity AMS 5"
|
|
14.51 miles
|
Equinix AM11
|
AM11 was acquired from Switch Datacenters in April 2019.
|
|
14.55 miles
|
Datacenter.com AMS1
|
|
|
14.56 miles
|
Switch Datacenters: AMS3
|
Switch's AMS3 site, located in the Amsterdam South East business district, was a logistics building converted into a data center in 2017.
|
|
14.58 miles
|
Equinix Amsterdam AM7
|
|
|
14.67 miles
|
AtlasEdge: Amsterdam Van der Madeweg
|
AtlasEdge Amsterdam South East Data Centre is a carrier neutral data centre that offers 742 sqm of colocation capacity.
|
|
14.88 miles
|
euNetworks Amsterdam
|
|
|
14.90 miles
|
CapitaLand: Paul van Vlissingenstraat
|
CapitaLand Ascendas REIT acquired this site in 2021.
|
|
15.56 miles
|
House of Data: Amsterdam
|
New Dutch operator House of Data plans to build a data center in Amsterdam.
|
|
16.22 miles
|
Cellnex: Amsterdam
|
|
|
16.88 miles
|
ServerFarm: Amsterdam AMS1
|
In 2019, Serverfarm extended its portfolio with a strategic data center acquisition in Amsterdam.
|
|
16.90 miles
|
Capgemini Amsterdam
|
|
|
17.52 miles
|
Eurofiber Utrecht
|
|
|
17.73 miles
|
Databarn Amsterdam
|
|
|
17.78 miles
|
NorthC: Amsterdam
|
|
|
17.93 miles
|
AtlasEdge: Amsterdam
|
|
|
18.11 miles
|
PCextreme Gyro Center
|
|
|
18.11 miles
|
nLighten: AMS1
|
nLighten, the new regional edge data center firm from I Squared Capital, has entered the Netherlands market by acquiring a data center in Amsterdam.
|
|
18.25 miles
|
Capitaland: Gyroscoopweg
|
Gyroscoopweg is a triple net powered shell data centre comprising two separate three-storey buildings of brick construction with metal cladding on the upper floors.
|
|
18.26 miles
|
Equinix Amsterdam AM8
|
|
|
18.28 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.41 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.42 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Data center facility details are available on request.Interested in this information?Contact us
|
|
18.44 miles
|
Pure DC: AMS02
|
This facility is part of Pure DC's Westpoort Campus in Amsterdam.
|
|
18.44 miles
|
Pure DC: AMS01
|
Pure DC's Amsterdam Westpoort (AMS01) campus is a flagship, high-density development designed specifically to support hyperscale cloud infrastructure under strict municipal constraints.
|
|
18.44 miles
|
Pure DC: AMS03
|
This facility is part of Pure DC's Westpoort Campus in Amsterdam.
|
|
18.45 miles
|
Global Switch: Amsterdam East
|
Located adjacent to Global Switch's existing Amsterdam West data center, Amsterdam East expands the campus by offering 32,000 sq m of space with technical suites to accommodate high-performance computing needs.
|
|
18.61 miles
|
Global Switch: Amsterdam West
|
Global Switch Amsterdam is located in the Slotevaart/Overtoomseveld district, adjacent to the main Dutch cable infrastructure. The site is 2km from the financial district and city center.
|
|
18.61 miles
|
Lumen Amsterdam (Johan Huizingalaan)
|
|
|
19.61 miles
|
SilverFalcon Westpoort
|
|
|
19.89 miles
|
CapitaLand: Cateringweg
|
CapitaLand acquired the former NAP of Amsterdam in 2021. It was a former Terremark site.
|