|
0.17 miles
|
Panattoni: Detroit, Michigan
|
Panattoni’s "Project Cannoli" in Van Buren Township is a massive data center development planned for 282 acres between Haggerty and Hannan roads.
|
|
0.34 miles
|
Hub OneInterested in this information?Contact us
|
Google's 1 GW hyperscale campus developed by Panattoni on 282 acres in Van Buren Township, Michigan. Powered by DTE Energy under a 20-year agreement, with service starting December 2027 and full load by late 2028.
|
|
0.85 miles
|
US Signal: MI03 Bldg-3
|
US Signal is planning a 27,500-square-foot Phase IV, bringing the total MI03 Campus footprint to 87,500 square feet.
|
|
0.87 miles
|
US Signal: MI03 Bldg-2
|
US Signal is planning a 35,000-square-foot addition for Phases II and III of MI03 data center campus in Van Buren.
|
|
0.87 miles
|
US Signal: MI03 Detroit Metro
|
US Signal currently operates a 25,000-square-foot facility on a 7.91-acre site in Van Buren.
|
|
6.30 miles
|
Education Data CenterInterested in this information?Contact us
|
The planned University of Michigan–Los Alamos “Michigan-SPARC” supercomputing campus, remains officially on the books but its future is increasingly uncertain.
|
|
7.37 miles
|
Online Tech Westland
|
|
|
11.95 miles
|
Solstice Data: Allen Park, MI
|
The proposed Solstice Data center in Allen Park is an "edge" facility designed to support low-latency AI applications for local industries like healthcare and automotive manufacturing.
|
|
14.55 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
A $1 billion data center is proposed for over 800 acres in Augusta Township, Michigan, near Milan, by Thor Equities.
|
|
15.47 miles
|
123NET: DC5
|
|
|
15.70 miles
|
Online Tech Ann Arbor
|
|
|
15.94 miles
|
Online Tech Ann Arbor 2
|
|
|
17.78 miles
|
Nexcess Southfield
|
|
|
17.81 miles
|
EdgeConneX Detroit
|
Capable of 600+ watts per sq ft
Real-time branch circuit monitoring
|
|
17.85 miles
|
US Signal: MI04 Southfield
|
Located near M-10, M-39, and M-24, the Southfield, Michigan data center provides easy access for businesses located in the Greater Detroit area
|
|
17.88 miles
|
Verizon: 21455 Melrose
|
|
|
19.13 miles
|
365 Detroit (DT1)
|
DT1 Detroit is a 12,000 sq ft carrier-neutral colocation facility in Michigan's Business Center, 25 minutes from downtown Detroit and 20 miles from Detroit Metropolitan Wayne County Airport. Former Switch & Data and Equinix facility acquired by 365 Data Centers in November 2012.
|
|
19.17 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Metrobloks is developing an AI-ready, scalable, and sustainable data center in the Detroit metropolitan area, with live capacity scheduled for Q4 2027.
|
|
19.59 miles
|
123NET: DC3
|
|
|
19.59 miles
|
ManagedWay Southfield
|
|
|
19.59 miles
|
123NET: DC2
|
|
|
19.78 miles
|
ManagedWay Southfield SFJ1
|
|
|
19.78 miles
|
123.net DC1
|
Michigan-based Internet Service Provider (ISP) 123Net has completed a major expansion of its Detroit data center, the Southfield DC1.
|
|
19.81 miles
|
Mapletree: 19675 W Ten Mile
|
|
|
19.90 miles
|
Lumen Detroit 3
|
|
|
19.93 miles
|
Quicken Loans
|
|
|
19.96 miles
|
Telesystem DC-2 Monroe
|
|