Stellium: Cobalt Park Campus

Stellium's data centre campus at Cobalt Park in Wallsend, North Tyneside, beside National Grid's Tynemouth 275 kV substation and home to the UK landing station for the North Sea Connect and NO-UK subsea cables. First built in 2010, with hall fit-outs planned through 2027.

OperationalPlannedProspective Expansion
Fully operational facility with future phases planned and prospective expansion planned
Developed by:

Campus at a Glance

3 data centers on this campus
First built in 2016 with expansions through 2027
Total building size: ░░░░░░ Request Dataset SqFt
Coordinates: 55.01708, -1.50383
░░░ Request Dataset MW
Operational
░░░ Request Dataset MW
Under Construction
░░░ Request Dataset MW
Planned

Location. Cobalt Park, Wallsend, North Tyneside. The campus sits on the A19 corridor about 7 miles northeast of Newcastle city centre, on former Tyne Riverside Enterprise Zone land.

History. Highbridge developed three data centre shells: DC1 (shell and core 2010), DC3 (December 2012) and DC2 (January 2013). Investor LLPs funded DC2 and DC3 to claim enterprise zone allowances; the Supreme Court denied those allowances in 2024. Stellium Datacenters launched in 2016 and opened DC1 in December 2016. In 2021, Digital 9 Infrastructure bought DC1's long lease (SeaEdge UK1) for £15m, with Stellium as occupational tenant. Stellium bought the 125-year leasehold back in June 2025. Tiger Infrastructure Partners backs Stellium. DC2 and DC3 have never been let; Highbridge markets them as shells.

Shared infrastructure. Four 20 MVA 11 kV feeds run from the adjacent National Grid Tynemouth 275 kV substation to two dedicated switch rooms. Power is distributed to each building on a 2N basis. DC1 has FG Wilson 1,500 kVA standby generators, a 2.3 MWh containerised battery and rooftop solar (2023).

Connectivity. DC1 holds the sole UK cable landing stations for Aqua Comms' North Sea Connect and the NO-UK cable to Norway (both live March 2022). It also hosts the NCL-IX internet exchange and Stellium's 40 km metro dark-fibre ring.

Milestones. DC1 became OCP Ready in 2023 and opened the UK's first OCP Experience Centre (immersion cooling with Submer) in January 2025. North Tyneside permitted 15 modular plant units for the remaining DC1 halls in May 2025 (24/01678/FULM). The government named Cobalt Park part of the North East AI Growth Zone in September 2025. OpenAI's Stargate UK named the park as a site, then paused in April 2026.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
Stellium: Newcastle DC1 Stellium Datacenters
OperationalPlanned
░░░ Request Dataset MW ░░░░░░ Request Dataset SqFt 2016
Stellium: Newcastle DC2 Stellium Datacenters
Prospective Expansion
— — —
Stellium: Newcastle DC3 Stellium Datacenters
Prospective Expansion
— — —

Map and Nearby Locations

Stellium: Cobalt Park Campus Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

UK based data center provider based in Newcastle

0
Facilities
0
Markets
0MW
Megawatts

Ready to Level up Your
Data Center Strategy?