Stellium: Newcastle DC1

Latest Podcast 9 Cobalt Park Way
OperationalPlanned
Operational with future phases planned
Operated by:

Stellium: Newcastle DC1

Short Code: DC1
Site was first built in 2016 and has expansions through 2027
PUE: 1.24
Utility Provider: Northern Powergrid
Floors: 2
Lot Size: 6 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Stellium Data Centre 1 is a two-storey, Tier 3+ designed building at 9 Cobalt Park Way, Wallsend, with four 1,066 m² data halls. It houses the UK landing station for the North Sea Connect and NO-UK subsea cables.

Stellium Data Centre 1


• Tier 3+ design, ISO 27001 certified
• 4,264 m² of IT space in four 1,066 m² data halls, traditional water-cooled
• North Atlantic Loop cable landing station
• 2 x Meet-Me rooms
• PUE rating at 1.24
• Support from low to high density racks (including HPC)
• BREEAM Excellent

Networks


• BT
• euNetworks
• Virgin Media
• Colt Telecom
• Zayo
• BSO Networks (IX Reach)
• SSE
• Commsworld
• Centurylink
• Stellium Networks - Dark Fibre
• Aspire TS
• Alti-Box
• ITPS
• PCCW
• Barn
• Cogent
• Vodafone

Map and Nearby Locations

9 Cobalt Park Way
Stellium Datacenters Sites
Nearby Facilities

Stellium: Newcastle DC1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Stellium: Newcastle DC1

Distance Site About
0.08 miles Stellium: Newcastle DC2
DC2 (Cobalt Data Centre 2) is a four-hall data centre shell that Highbridge completed in 2013 on Stellium's Cobalt Park campus in Wallsend. Highbridge markets it for lease, and it has not been fitted out.
0.08 miles Stellium: Newcastle DC3
DC3 (Cobalt Data Centre 3) is a four-hall, BREEAM Outstanding data centre shell that Highbridge completed in 2012 on Stellium's Cobalt Park campus in Wallsend. Highbridge markets it for lease, and it has not been fitted out.
0.38 miles Pulsant: Newcastle NE-2
4.87 miles Partnership House
4.90 miles Aspire: Heworth Hall, Gateshead
4.98 miles Pulsant: Newcastle NE-1
A purpose-built single-storey facility of 6,000 square feet in the heart of Newcastle with a single secure data hall supporting a total of 218 racks. Colocation, managed services and on-site cloud are available to all customers.
5.59 miles Secure Newcastle Datacentre
5.61 miles Level3 Newcastle
6.38 miles Wildcard: Reliance House
Located in Newcastle upon Tyne, Reliance House is a purpose-built, carrier-neutral data center operated by Wildcard Networks.
9.17 miles QTS: Cambois DC1
QTS is developing a ten-building data center campus in the north of England. The development is expected to be completed by 2035
9.23 miles QTS: Cambois DC2
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
9.32 miles QTS: Cambois DC3
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
9.33 miles QTS: Cambois DC10
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
9.34 miles QTS: Cambois DC8
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
9.38 miles QTS: Cambois DC4
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
9.45 miles QTS: Cambois DC5
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
9.49 miles QTS: Cambois DC9
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
9.50 miles QTS: Cambois DC6
Located in Blyth, Northumberland, this facility is situated on the QTS Data Centers' Cambois campus.
9.51 miles QTS: Cambois DC7
Located in Blyth, Northumberland, this facility is situated on the QTS data centers' Cambois campus.
9.92 miles TBC Partners: Cambois, Blyth
TBC Partners has submitted an early-stage screening request for a data centre campus on about 12 hectares of industrial land at Factory Road, Cambois.
10.09 miles Wansbeck Regeneration: West Sleekburn Campus
Wansbeck Regeneration has submitted a planning application for a £3.84bn data centre campus in West Sleekburn, located within Northumberland's AI Growth Zone.
10.34 miles Angel House

Stellium: Newcastle DC1 Data Center Photos See all

New Stellium data centre at Cobalt Business Park
Exterior of Cobalt Data Centres
Source: Baxtel

New Stellium data centre at Cobalt Business Park

Cobalt Data Centre 3 is the latest addition to Cobalt Data Centre Campus. The new building provides more than 2,400m2 of technical floor space and continues the sustainability ethos that developer,...
Exterior of Cobalt Data Centre 3
Source: Breeam

Cobalt Data Centre 3 is the latest addition to Cobalt Data Centre Campus. The new building provides more than 2,400m2 of technical floor space and continues the sustainability ethos that developer, Highbridge North Tyneside has adopted for the campus.

Stellium DC1 Exterior View
Source: Highbridge Properties
Exterior View
Source: Baxtel
Rendering of Entire Campus
Source: Cundall

Operating Company

Operated by:

UK based data center provider based in Newcastle

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Stellium Datacenters to use solar panels and battery storage at its Newcastle facility
Stellium Datacenters to use solar panels and battery storage at its Newcastle facility

Stellium Datacenters to use solar panels and battery storage at its Newcastle facility

April 28, 2023 Stellium Datacenters

In Newcastle, UK, Stellium Datacenters is planning to deploy a battery storage and solar solution at its facility to reduce its carbon footprint. The company teamed up with Total Data Centre Solutions (TDCS) for the project, which will deploy a containerized 2.3MWh battery storage solution and...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?