Lumen Appoints Jim Fowler as CTO
December 11, 2025
Lumen Technologies
| Distance | Site | About |
|---|---|---|
| 0.32 miles | Templus: Barcelona |
The former bitNAP facility was acquired by Templus in early 2025.
|
| 0.69 miles | Merlin Barcelona |
In 2025, Merlin Edged launched the data center in Barcelona, Spain, which is hosting NeoCloud CoreWeave.
|
| 0.70 miles | Equinix Barcelona BA1 |
|
| 0.70 miles | Hyperscale Data Center Request Dataset |
In 2025, Merlin Edged launched the data center in Barcelona, Spain, which is hosting NeoCloud CoreWeave. The first phase features a deployment of 10,224 Nvidia H200 GPUs with InfiniBand.
|
| 0.70 miles | Hyperscale Data Center Request Dataset |
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
|
| 0.70 miles | Edged Energy: Bercelona |
Edged Energy has launched its "Merlin Edged Barcelona" data center in Spain. The facility, completed in the Fall 2023, offers 24,350 sqm of space and runs on 100% renewable energy. I
|
| 0.78 miles | AtlasEdge Barcelona |
AtlasEdge Barcelona Data Centre is located just 6km away from the nearest airport.
|
| 1.11 miles | Renta Corporation: Barcelona |
In Hospitalet de Llobregat, Barcelona, Renta Corporación has acquired a 16,500 sqm site for a new development.
|
| 1.28 miles | Equinix Barcelona BA2 | |
| 3.41 miles | Submer: Barcelona |
Liquid cooling specialist Submer plans its first data center in Barcelona, Spain.
|
| 4.65 miles | Adam Barcelona BCN | |
| 5.05 miles | Edgeconnex Barcelona | |
| 7.61 miles | AtlasEdge: Barcelona 2 |
AtlasEdge has acquired an 18,000 square-meter (193,750 sq ft) plot, located 6km from its existing Barcelona data center.
|
| 7.63 miles | Barcelona CLS |
|
| 7.80 miles | Digital Realty: Barcelona BCN1 |
Digital Realty is developing a 200,000 square foot data center within the Sant Adrià de Besòs municipality, near Barcelona, Spain.
|
| 9.19 miles | T Systems: Cerdanyola | |
| 9.22 miles | GTR: Barcelona |
KKR-backed Global Technical Realty (GTR) is expanding into Spain, having secured its first data center development site.
|
| 9.23 miles | ITNow CD2 | |
| 9.26 miles | Panattoni: Barcelona Campus |
Panattoni Development, a California-based real estate company, has secured a building permit for a data center project in Barcelona, Spain.
|
| 9.26 miles | Panattoni: Barcelona 2 |
This facility will be part of Panattoni's Barcelona Campus located in the Parc de l’Alba in Cerdanyola del Vallès.
|
| 9.55 miles | hscale: Barcelona |
BCN1 is hscale's first campus in Spain, situated in Parc de l’Alba, North Barcelona. It lies between the towns of Cerdanyola del Vallés and Sant Cugat del Vallés.
|
| 9.57 miles | Adam: Cerdanyola 2 |
Recently acquired by the CVC DIF fund, Adam is developing a second Data Center in Cerdanyola del Vallès, close to its current operational facility. This new center is slated to be operational by 2026.
|
| 9.58 miles | Adam Parc Tecnològic del Vallès (PTV) | |
| 9.63 miles | ITnow: CD1 | |
| 16.33 miles | Nabiax: Terrassa |
The Terrassa Data Center is located near the Barcelona Metropolitan Area in Spain. The facility comprises 1,200 square meters divided into 7 IT rooms.
|
The combined company of CenturyLink and Level(3) has one of the largest networks in the world.
The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).
December 11, 2025
Lumen Technologies
November 06, 2025
Barcelona
June 12, 2024
Barcelona
April 15, 2024
Lumen Technologies
January 12, 2024
Barcelona
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas