Lumen BCN1

Latest Podcast Carrer de José Agustín Goytisolo
Operational
Fully operational facility
Operated by:

Lumen BCN1

Short Code: BCN1
░░░ Request Dataset MW
Total Power

Map and Nearby Locations

Carrer de José Agustín Goytisolo
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen BCN1

Distance Site About
0.32 miles Templus: Barcelona
The former bitNAP facility was acquired by Templus in early 2025.
0.70 miles Equinix Barcelona BA1
0.70 miles CoreWeave: Barcelona
In 2025, Merlin Edged launched the data center in Barcelona, Spain, which is hosting NeoCloud CoreWeave. The first phase features a deployment of 10,224 Nvidia H200 GPUs with InfiniBand.
0.70 miles Hyperscale Data Center Request Dataset
In 2024, Meta leased this data center from Spanish real estate company Merlin Properties, which was developed in collaboration with U.S.-based Edged Energy.
0.70 miles Edged Energy: Bercelona
Edged Energy has launched its "Merlin Edged Barcelona" data center in Spain. The facility, completed in the Fall 2023, offers 24,350 sqm of space and runs on 100% renewable energy. I
0.78 miles AtlasEdge Barcelona
AtlasEdge Barcelona Data Centre is located just 6km away from the nearest airport.
1.11 miles Renta Corporation: Barcelona
In Hospitalet de Llobregat, Barcelona, Renta Corporación has acquired a 16,500 sqm site for a new development.
1.28 miles Equinix Barcelona BA2
3.41 miles Submer: Barcelona
Liquid cooling specialist Submer plans its first data center in Barcelona, Spain.
4.65 miles Adam Barcelona BCN
5.05 miles Edgeconnex Barcelona
7.19 miles Ark DC: Barcelona
Ark Data Centres has entered the Spanish market with a new data center development in Barcelona’s La Maquinista area, securing industrial land for a major urban infrastructure project backed by regional and local authorities.
7.61 miles AtlasEdge: Barcelona 2
AtlasEdge has acquired an 18,000 square-meter (193,750 sq ft) plot, located 6km from its existing Barcelona data center.
7.63 miles Barcelona CLS
7.80 miles Digital Realty: Barcelona BCN1
Digital Realty has opened BCN1 in Sant Adrià de Besòs, marking its first Barcelona data center and expanding its Iberian platform beyond Madrid.
9.19 miles T Systems: Cerdanyola
9.22 miles GTR: Barcelona
KKR-backed Global Technical Realty (GTR) is expanding into Spain, having secured its first data center development site.
9.23 miles ITNow CD2
9.26 miles Panattoni: Barcelona Campus
Panattoni Development, a California-based real estate company, has secured a building permit for a data center project in Barcelona, Spain.
9.26 miles Panattoni: Barcelona 2
This facility will be part of Panattoni's Barcelona Campus located in the Parc de l’Alba in Cerdanyola del Vallès.
9.55 miles hscale: Barcelona
BCN1 is hscale's first campus in Spain, situated in Parc de l’Alba, North Barcelona. It lies between the towns of Cerdanyola del Vallés and Sant Cugat del Vallés.
9.57 miles Adam: Cerdanyola 2
Recently acquired by the CVC DIF fund, Adam is developing a second Data Center in Cerdanyola del Vallès, close to its current operational facility. This new center is slated to be operational by 2026.
9.58 miles Adam Parc Tecnològic del Vallès (PTV)
9.63 miles ITnow: CD1
9.84 miles Kyndryl: Barcelona
15.20 miles Mediterra: Barcelona
Mediterra DataCenters has entered the Spanish market with plans to develop a data center campus in the Barcelona area, scheduled for commissioning in the second half of 2027.
16.33 miles Nabiax: Terrassa
The Terrassa Data Center is located near the Barcelona Metropolitan Area in Spain. The facility comprises 1,200 square meters divided into 7 IT rooms.

Lumen BCN1 Data Center Photos See all

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
261
Facilities
115
Markets
279MW
Megawatts

News See all

Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read Qilimanjaro Opens Quantum Data Center in Barcelona
Baxtel

Qilimanjaro Opens Quantum Data Center in Barcelona

November 06, 2025 Barcelona

Quantum computing firm Qilimanjaro last week announced the inauguration of Qilimanjaro Quantum Tech's quantum data center in the city's innovation district. The facility has the capacity to host up to ten quantum computers, available in both analog and digital modes, and connected with classical...

Read more
Read FC Barcelona and Hewlett Packard Enterprise sign new cloud offering agreement
FC Barcelona and Hewlett Packard Enterprise sign new cloud offering agreement

FC Barcelona and Hewlett Packard Enterprise sign new cloud offering agreement

June 12, 2024 Barcelona

FC Barcelona and Hewlett Packard Enterprise (HPE) have signed an agreement for the football club to deploy HPE GreenLake and Aruba Networks at its new facilities. Following this agreement, HPE will be the new Espai Barça Official Edge-to-Cloud Partner for the next four seasons, until 30 June...

Read more
Read Lumen secures new contract from GAO
Lumen secures new contract from GAO

Lumen secures new contract from GAO

April 15, 2024 Lumen Technologies

Lumen Technologies has secured a contract worth about $73.6 million from the US Government Accountability Office (GAO) under the General Services Administration's Enterprise Infrastructure Solutions (EIS) program. This multi-million dollar contract will see Lumen modernize network, data, voice,...

Read more
Read Edged Energy starts operations at Barcelona facility
Edged Energy starts operations at Barcelona facility

Edged Energy starts operations at Barcelona facility

January 12, 2024 Barcelona

Edged Energy has commenced operations at its facility in Barcelona, Spain, named ‘Merlin.” The company completed the construction of this facility with a critical load capacity of 16MW and uses 100 percent renewable energy in the fall of 2023. Bryant Farland, CEO of Edged Energy said, “We are...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all