Edged Energy has launched its "Merlin Edged Barcelona" data center in Spain. The facility, completed in the Fall 2023, offers 24,350 sqm of space and runs on 100% renewable energy. It features waterless cooling and achieves a PUE of 1.15. Connected to the Barcelona Cable Landing Station, it provides access to major subsea cables like 2Africa and Medusa. This collaboration between Merlin Properties and Edged combines high performance with sustainable design, marking a significant advancement in efficient and environmentally conscious data infrastructure.
POWER
- Utility Provider: Endesa
- Utility Power: Radial
- Utility Voltage: 25 kV
- Power Delivery: Revenue-grade, transparent, real-time metering
- UPS: Battery backup supporting all electrical and mechanical systems; N+1 redundancy
- Generators: 25.6 MW of backup power in a redundant configuration
- Configuration: N+1