Hut 8: Winnipeg

Latest Podcast 167 Lombard Ave
Operational
Fully operational facility
Operated by:

Hut 8: Winnipeg

Ownership: Hut 8 Corp does not own the building.
░░░ Request Dataset MW
Total Power

Hut 8 acquired the facility as part of its purchase of TeraGo's data center business. The acquisition was announced in January 2022 and closed in the first quarter of 2022.

  • Up to 300 kW total available power, on redundant 1.2 MW grids
  • 300 kW diesel and generator back-up
  • Clean power supplied by redundant UPS, each having redundant battery banks
  • A/B power available

Map and Nearby Locations

167 Lombard Ave
Hut 8 Corp Sites
Nearby Facilities

Sites within 15 miles of Hut 8: Winnipeg

Distance Site About
0.00 miles Exchange Group - Global Server Center
0.33 miles Les.net YWG2
0.50 miles Manitoba Hydro Telecom Data Centre
5.25 miles Equinix Winnipeg WI1
The site was formerly known as "Q9 Winnipeg" which was acquired by Equinix from Bell Canada in 2020.
6.35 miles Bell Canada: Winnipeg
Bell Canada is converting the former Merit Functional Foods facility at 400 Goldenrod Drive in Rosser, Manitoba, into an AI data center as part of its Bell AI Fabric network.
13.16 miles Jet.AI: Winnipeg Campus
Jet.AI Inc. is pivoting from aviation software into the digital infrastructure space through a partnership with Consensus Core Technologies. The firms are developing a 350-acre data center campus 10 miles south of Winnipeg, Manitoba.

Hut 8: Winnipeg Data Center Photos See all

Operating Company

Operated by:

Hut 8 is one of North America's oldest, largest and most innovative digital asset miners in the world. Hut has one of the highest installed capacity rates in the industry and is the largest holder of self-mined Bitcoin of publicly traded companies globally.

20
Facilities
9
Markets

News See all

Read Hut 8 Announces Four Data Center Projects across US
Hut 8 Announces Four Data Center Projects across US

Hut 8 Announces Four Data Center Projects across US

August 28, 2025 Hut 8 Corp

HPC and cryptomine data center developer Hut 8 this week announced plans to develop four new sites across the United States, totaling 1.53GW of capacity under development. The expansion sites range in scale from 50MW to 1GW of utility capacity across Louisiana, Texas, and Illinois. Hut 8 said it...

Read more
Read Hut 8 Awarded Five-Year Capacity Contract for 310MW of Natural Gas Power in Ontario
Hut 8 Awarded Five-Year Capacity Contract for 310MW of Natural Gas Power in Ontario

Hut 8 Awarded Five-Year Capacity Contract for 310MW of Natural Gas Power in Ontario

July 03, 2025 Hut 8 Corp

Cryptomining and HPC firm Hut 8 has been awarded a five-year capacity contract with the Ontario Independent Electricity System Operator (IESO) for 310MW of natural gas generation assets. The portfolio is owned and operated by Far North Power Corp, a partnership between Hut 8 and Macquarie...

Read more
Read Hut 8 Launches Cryptomine Data Center in Texas
Hut 8 Launches Cryptomine Data Center in Texas

Hut 8 Launches Cryptomine Data Center in Texas

July 02, 2025 Hut 8 Corp

Cryptomining and HPC data center firm Hut 8 Corp. has launched a Bitcoin mining data center in Texas which spans 162,000 sq ft (15,050 sqm) and will offer 205MW of capacity at full energization. Vega features a proprietary, rack-based, direct-to-chip liquid cooling system designed in-house by Hut...

Read more
Read Hut 8 Announces Closing of the Acquisition of TeraGo's Data Center Business
Hut 8 Announces Closing of the Acquisition of TeraGo's Data Center Business

Hut 8 Announces Closing of the Acquisition of TeraGo's Data Center Business

January 31, 2022 Hut 8 Corp

TORONTO, Jan. 31, 2022 /PRNewswire/ - Hut 8 Mining Corp. (Nasdaq: HUT) (TSX: HUT) ("Hut 8" or "the Company"), one of North America's largest, innovation-focused digital asset mining pioneers, supporting open and decentralized systems since 2018, is pleased to announce the closing of its...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?