ParkInterested in this information?Contact us

Latest Podcast Street AddressInterested in this information?Contact us, Kansas City, MO 64161, USA
Operational
Fully operational facility
Operated by:

Google: Project Shale

Year Built: 2025
Utility Provider: Evergy
Lot Size: 315 acres

Sites on this Campus:

  • Plaza GammaInterested in this information?Contact us
  • NorthInterested in this information?Contact us
  • Center OneInterested in this information?Contact us
░░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power

Tech giant Google is developing a billion-dollar data center campus in Kansas City. The new Google data center is located in the Hunt Midwest Business Center on NE Parvin Road.

  • It will be developed over four phases and feature several ancillary buildings for a total of 1.435 million sq ft (133,316 sqm) of floor space.
  • Google is working with Evergy to power the site and Ranger Power and D. E. Shaw Renewable Investments (DESRI) to bring 400 megawatts of new carbon-free energy to the grid as part of the company’s ambitious goal to run on 24/7 carbon-free energy.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

North StationInterested in this information?Contact us Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Cloud TowerInterested in this information?Contact us

Distance Site About
0.39 miles Campus OneInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
0.51 miles Campus ThreeInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
0.64 miles EdgeInterested in this information?Contact us
This data center is a part of Google's Kansas City Campus in Missouri.
1.09 miles LightEdge Kansas City
The underground, solid limestone structure is 6X stronger than concrete, and allows for contiguous expansion in the form of private rack/cage space and hard wall suite environments.
1.28 miles Edged Energy: Kansas City, MO
The facility known as Edged Kansas City is located in Kansas City, Missouri.
2.16 miles Metrobloks: Kansas City MCI-A1
Metrobloks is developing an AI-ready, scalable, and sustainable data center in Liberty, Missouri (Kansas City metro), with initial live capacity scheduled for Q3 2027.
2.30 miles Metrobloks: MCI-A2
This facility is part of the Metrobloks Kansas City campus in Missouri.
2.31 miles Metrobloks: MCI-A3
This facility is part of the Metrobloks Kansas City campus in Missouri.
6.73 miles Nocix 2 (1530 Swift)
6.77 miles NOCIX
7.80 miles Joe's Datacenter Kansas City
Joe's Data Center moved to this location in October of 2013 because they were outgrowing their space in the Oak Tower. This new location is well suited for datacenter use as it is located near fiber lines, has plenty of outdoor space for mechanical equipment, reliable power provided by KCP&L, and room for the business to grow for years to come.
8.08 miles IP Pathways: Kansas City
The facility was acquired from Netsolus in 2023.
8.17 miles Lumen Kansas City 3
8.20 miles 1102 Grand St (Netrality) Kansas City Carrier Hotel
1102 Grand, a carrier hotel owned and operated by Netrality, is the most network-rich, core interconnection environment in Kansas. The data center provides infrastructure for carriers, enterprises, and service providers to interconnect reliably and cost-effectively.
8.20 miles Lumen Kansas City 4
8.21 miles Contegix 1102 Grand
The site in 1102 Grand was acquired in late 2016 when Contegix acquired Admo.
8.26 miles Lumen Kansas City 1
8.40 miles Nebius: Kansas City
Nebius is proceeding with a second deployment phase at its existing Kansas City data center, with the additional capacity anticipated to be operational by the end of Q2 2025.
8.41 miles Patmos: Kansas City
US data center and hosting firm Patmos is expanding at its newest data center in Kansas City, Missouri.
8.60 miles Contegix Mainmark
The site was acquired in late 2016 when Contegix acquired Admo.
9.40 miles Nebius: Independence 2
This facility is part of Nebius' Independence Campus in Kansas City.
9.48 miles Nebius: Independence 4
This facility is part of Nebius' Independence Campus in Kansas City.
9.52 miles Nebius: Independence Campus
European cloud firm Nebius is spearheading a massive AI data center campus in Independence, Missouri, positioned just outside Kansas City.
9.62 miles Nebius: Independence 3
This facility is part of Nebius' Independence Campus in Kansas City.
10.13 miles Patmos: Independence, Missouri
Patmos plans to convert a recently completed industrial warehouse in Independence into a high-density data center. The project entered the city’s permitting process before Independence adopted a temporary moratorium, allowing its application to continue through review.
11.23 miles Core PlazaInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
11.37 miles Cloud ValleyInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
11.51 miles Edge ParkInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
11.63 miles Iron Mountain Kansas Underground
Iron Mountain’s Kansas City data center (KCM-1) is a resilient, compliant and highly secure underground colocation complex located south of downtown Kansas City, Missouri. The underground data center is part of a 22-acre campus located 110 feet below the earth’s surface.
11.78 miles Metro TowerInterested in this information?Contact us
This facility is located at the Rocky Branch Creek Technology Park site in Northland, Kansas City, Missouri, as part of Google's Project Mica.
11.81 miles West CenterInterested in this information?Contact us
Google has submitted final plans for its Rocky Branch Creek Technology Park data center in Northland, Kansas City, Missouri.
12.44 miles North ParkInterested in this information?Contact us
This facility is part of Meta's Kansas City Campus in Missouri.
12.49 miles Central ValleyInterested in this information?Contact us
This facility is part of Meta's Kansas City Campus in Missouri.
12.54 miles RidgeInterested in this information?Contact us
In 2025, Meta Platforms (formerly known as Facebook) launched a data center campus in Kansas City, Missouri, located at 801 NW 128th Street.
13.93 miles Rackspace Kansas City MC1
Raised Flooring: 15,256 sq ft 2.5 MW Total Utility Power Manned 24x7x365
14.07 miles Lincoln Rackhouse KC (Airworld)
The campus is a former Bank of America facility in Kansas City’s northland.
14.37 miles TierPoint Kansas City
Outside of 500-year flood plain 6kW per cabinet capacity Newly upgraded 2MVA utility power feed 1MW diesel generator for all critical loads 2N UPS with redundant battery strings
17.25 miles Prime HubInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
17.57 miles PlusInterested in this information?Contact us
Project Kestrel, a major new data center development, is officially taking flight in Kansas City, Missouri, following the acquisition of 430 acres of land near the Kansas City International Airport by Google affiliate Shenandoah Computing LLC.
17.59 miles PlusInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
17.87 miles West HubInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
17.87 miles CampusInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
18.17 miles Park ThreeInterested in this information?Contact us
This facility is part of Google's Project Kestrel in Kansas City, Missouri.
18.72 miles Netrality: Kansas City 7801 Nieman
19.14 miles DataBank Pine Ridge KC2
DataBank’s Pine Ridge data center is located in the technology-rich South Kansas City suburb of Overland Park. The site houses DataBank’s primary Network Operations Center (NOC) and operational support teams. With more than 12,000 sqft of raised-floor data center space, the facility houses three independent data halls and direct connectivity to multiple top-tier carriers.

Ridge ThreeInterested in this information?Contact us Data Center Photos See all

The highlighted area is the former AK Steel Corp, a site now owned by Port KC where Google is considering building a data center
Source: Baxtel

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

237
Facilities
75
Markets

News See all

Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres
Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said...

Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres

July 27, 2026 Google

Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said Verizon expects to announce additional deals later this year that could generate "multiple billions...

Read more
Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?