Latest Podcast Street AddressInterested in this information?Contact us, Roseland, Virginia, USA
Planned
Future facility in planning stage
Operated by:

Google: Project Loch

Short Code: Building 1
Year Planned: 2028
Lot Size: 221 acres

Sites on this Campus:

  • Point PlusInterested in this information?Contact us

Project Loch is Google’s planned hyperscale data center campus located on a 221-acre site in Midlothian (Chesterfield County), Virginia. As a core piece of Google's multi-billion-dollar digital infrastructure expansion in the state, the campus is designed to feature three massive data center buildings, each supported by its own dedicated on-site power substation to handle high-density cloud and AI workloads.

While local zoning and fast-track tax incentives have already been approved, the project is currently clearing federal environmental reviews regarding its localized wetlands impact, positioning it to break ground following Google's nearby Meadowville development.

Map and Nearby Locations

This Facility
Google Sites
Nearby Facilities

Hub ThreeInterested in this information?Contact us Power Growth Over Time

Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of GlobalInterested in this information?Contact us

Distance Site About
NN milesInterested in this information?Contact us ProInterested in this information?Contact us
This facility is part of Google's Project Loch in Richmond, Virginia.
NN milesInterested in this information?Contact us Core ParkInterested in this information?Contact us
This facility is part of Google's Project Loch in Richmond, Virginia.
NN milesInterested in this information?Contact us Watkins Centre
In May 2025, the Chesterfield Board of Supervisors approved the rezoning of nearly 350 acres at 750 Watkins Centre Parkway, clearing the way for data center construction in western Chesterfield.
NN milesInterested in this information?Contact us Province: Powhatan 3
This facility is a part of Province Groups' Powhatan County Campus outside Richmond.
NN milesInterested in this information?Contact us Province: Powhatan 2
This facility is a part of Province Groups' Powhatan County Campus outside Richmond.
NN milesInterested in this information?Contact us Province Group: Powhatan
California-based Province Group has received approval to develop a $3 billion data center campus outside Richmond in Powhatan County, Virginia.
NN milesInterested in this information?Contact us MaxInterested in this information?Contact us
In May 2025, the Chesterfield Board of Supervisors approved the rezoning of nearly 979 acres at the planned Upper Magnolia Green West technology village.
NN milesInterested in this information?Contact us Tract: Tuckahoe Technology Park
Tract is expanding its presence in Virginia with plans for the Tuckahoe Technology Park, a master-planned data center campus in Goochland County, just outside Richmond.

Data Center Photos

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Facility photo

Campus exterior and data hall photography for this operator.

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

0
Facilities
0
Markets

News See all

Read DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals
DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Sali...

DTE Data Centre Pipeline Tops 8GW Following Oracle and Google Deals

July 29, 2026 Google

DTE Energy’s data centre pipeline has grown beyond 8GW, supported by major deals with Google and Oracle. The utility has secured 2.4GW of agreements, including a 1.4GW Oracle-backed project in Saline Township expected to ramp up in 2027–2028. DTE’s 1GW Google deal is awaiting approval from the...

Read more
Read Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres
Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said...

Verizon Signs $1bn Fibre Deal With Google to Connect Data Centres

July 27, 2026 Google

Verizon has signed a $1 billion dark fibre agreement with Google to connect the hyperscaler's data centres, CEO Dan Schulman confirmed. Speaking during the company's Q2 earnings call, Schulman said Verizon expects to announce additional deals later this year that could generate "multiple billions...

Read more
Read Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia
Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an ann...

Google Named End User of 8 Million sq ft Data Centre in Columbia, Georgia

July 24, 2026 Google

Google has been named the sole end user and operator of the 8 million sq ft (743,224 sqm) Columbia County Data Center development in Georgia. The company was confirmed as the customer during an announcement by the county’s Economic Development Authority on 23 July. Located northwest of White Oak...

Read more
Read Power and Cooling Failure Causes Google Cloud Outage in Netherlands
Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours,...

Power and Cooling Failure Causes Google Cloud Outage in Netherlands

July 21, 2026 Google

Google Cloud suffered an outage in the Netherlands after a data center experienced a loss of utility power and cooling capacity. The Europe-West4 availability zone was affected for nearly 15 hours, impacting services including Google Cloud VMware Engine, Bare Metal Solution, and Google Cloud...

Read more
Read Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming
Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Pa...

Google Revealed As Customer Behind 2.7GW Data Center Campus Near Cheyenne, Wyoming

July 14, 2026 Google

Google has been identified as the company behind the 2.7GW Project Tembo data center campus, formerly known as Project Jade, near Cheyenne, Wyoming. The 716-acre campus in Switchgrass Industrial Park will include four data halls, along with office, logistics, and network buildings. Construction...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?