Withdrawn
Project cancelled before construction
Operated by:

Google: Northlake 1

Short Code: Project Beast
Ownership: Google does not own the building.

Sites on this Campus:

Google has officially backed out of its plans for the Northlake Logistics Park in Denton County, marking a strategic shift away from the previously leased 1-million-square-foot facility. Although the project was originally registered as Project Beast (Buildings 1 and 2) with an estimated $20.2 million investment and an expected completion date in 2026, the lease has since been terminated.

This decision allows Google to pivot its infrastructure focus toward expanding its primary, purpose-built campuses in Midlothian and Red Oak, as well as its newly announced "AI-ready" data center hubs in West Texas and the Panhandle.

Map and Nearby Locations:

This Facility
Google Sites
Nearby Facilities

Sites within 15 miles of Hub Two

Distance Site About
0.10 miles Hyperscale Data Center Request Dataset
Google has officially backed out of its plans for the Northlake Logistics Park in Denton County, marking a strategic shift away from the previously leased 1-million-square-foot facility.
2.99 miles Citigroup Fort Worth
4.11 miles QTS Dallas Fort Worth
QTS's Forth Worth site is the company's second data center in Dallas Market.
4.19 miles QTS: FTW1-DC2
QTS Data Centers is building a second data center adjacent to its first one near the Alliance Texas development. The two-story building is set to span 471,875 sq ft (43,840 sqm) and see $220 million invested in the project.
4.40 miles Hyperscale Data Center Request Dataset
When completed, the Fort Worth site will be Facebook’s largest data center to date, four buildings connected to form two “H” shapes, plus one standalone center, for a total of 20 data hall
4.68 miles STACK Fort Worth Alliance
STACK's expansion Alliance campus in Fort Worth
4.75 miles Tierpoint Fort Worth
The property came to market in 2023 and was acquired by Tierpoint.
11.93 miles Crypto Mining Data Center Request Dataset
Core Scientific plans to spend as much as $6.1 billion to refurbish its data center in Denton, Texas, turning it from a crypto facility into an AI site.
11.97 miles QumulusAI: Denton, TX
Located on four acres near Western Boulevard and Jim Christal Road, the facility will house eight prefabricated "pods" designed for AI and cryptomining.
12.15 miles Rackspace Grapevine DFW1
12.38 miles ACS: Fort Worth Expansion
12.50 miles ACS: Fort Worth, Texas
The proposed development, located on a 107-acre site near Hicks Field Road, will feature five buildings and an associated substation.
12.77 miles CyrusOne: DFW7
Dubbed DFW7, the project will encompass 1.9 million square feet and feature multiple buildings.
15.09 miles Digital Realty: Project Gold Lewisville
Digital Realty's Project Gold is located on Edmonds Lane in Lewisville. The project consists of a single-story shell data center with space for three data halls on a 182,969 sq ft (17,000 sqm) site.
15.43 miles Digital Realty: DFW26
In 2012, Digital Realty Trust acquired the Convergence Business Park, an 831,400 square-foot data center and office campus in the Dallas suburb of Lewisville, Texas.
15.58 miles CyrusOne: Lewisville DFW2
Two independent power grids Onsite substation fed by 3 separate substations (Argyle, Carrollton, and Lewisville)
15.65 miles Lightedge: Dallas (Lewisville)
LightEdge leases space from CyrusOne Lewisville DFW2.
19.12 miles QTS Irving
In 2013 QTS acquired the former Maxim semiconductor plant. It was QTS's first data center in the Dallas market
19.24 miles QTS: Irving DC6
QTS Irving DC6 is located in the Irving area of Dallas, Texas.
19.28 miles QTS Irving DC3
The QTS Irving 1 DC3 facility will provide our customers with an on-site substation and diverse campus fiber entrances with a redundant campus conduit system.
19.29 miles QTS: Irving DC5
QTS Irving DC5 is located in the Irving area of Dallas, Texas.
19.35 miles QTS: Irving DC4
QTS Data Centers is building the Irving DC4 facility at 3 Longhorn Drive, Irving, TX.
19.40 miles DataCanopy: Carrollton, TX
46+ cabinet positions and a 16-cabinet private cage suite. Multiple private cage options available to be segmented.
19.45 miles CyrusOne Carrollton
60,000 SqFt of Office Space Power Density: 150–200+ watts/SqFt
19.56 miles Centersquare: Fort Worth DFW1
Centrally located in the Dallas-Fort Worth area, the campus has single-story purpose-built data centers and a two-story attached administrative building on a fiber-linked campus. The data center campus is located just 6 miles from Dallas/Ft. Worth International Airport (DFW) and 14 miles from Dallas Love Field Airport.

Two Data Center Photos (See all)

Operating Company

Operated by:

In 2017, Google announced a commitment to power the company and its data centers entirely on renewable energy. In 2018, Google reached the 100% of their goal.

215
Facilities
3
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?