Year Planned: 2028
Lot Size: 3 acres

Real estate firm Goodman is planning a significant redevelopment project on Sydney's North Shore, with a $1.4 billion investment to transform the former ABC television studios into a data center. The company is currently preparing an Environmental Impact Statement for the New South Wales Department of Planning and Environment, proposing a seven-story facility.

  • The site, located at 2-8 Lanceley Place & 14 Campbell Street in Artarmon, was acquired by Goodman from the Australian Broadcasting Corporation (ABC) for AU$90.5 million (US$58.99) in 2022. A lease-back arrangement with the ABC reportedly concluded approximately 12 months ago.
  • Known as Studio 26, the production site first opened in 1956 and had been operational for about 60 years. Spanning more than 42,000 sqm (452,085 sq ft) across multiple buildings, it housed the company's main broadcast tower and played a crucial role in ABC's television history.

Map and Nearby Locations

6 Lanceley Pl
Goodman Group Sites
Nearby Facilities

Goodman: Artarmon Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Goodman: Artarmon

Distance Site About
0.08 miles Keppel DC Sydney 1
KDC SYD 1 is located adjacent to Gore Hill Data Centre and NEXTDC.KDC SYD 1 features approximately 57,000 sq ft of Gross Floor Area built to Tier III equivalent specifications.
0.08 miles NextDC: S6 Sydney
In 2024, Australian operator NextDC acquired a data center (S6) in Sydney. The S6 site is located in Artarmon, in close proximity to the company's S3 data center.
0.11 miles Keppel Sydney Gore Hill
0.11 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.12 miles StationInterested in this information?Contact us
0.12 miles NextDC: S3 Sydney
Located in Artarmon, less than 10 km from the Sydney CBD, S3 Sydney is a Tier IV certified data centre engineered for high-density compute, sovereign control and rapid digital growth.
0.28 miles Telstra St Lenards
0.32 miles 5G Networks: North Sydney
Telecommunications carrier 5G Networks (ASX: 5GN) acquired the North Sydney Data Center (NSDC), located in St Leonards, from Servers Australia for $2 million in 2020.
0.37 miles Interactive Sydney
2.15 miles Goodman: Project Mars
Goodman Group is planning to build a new AU$1.2 billion (US$725 million) data center campus, dubbed "Project Mars," in Lane Cove West, Sydney.
2.50 miles AirTrunk Sydney SYD2
SYD2 is AirTrunk’s third data center in Australia and join SYD1 in Sydney and MEL1 in Melbourne, which have both been operational since 2017.
2.83 miles ISPT: Sydney
A massive AU$1.8 billion (US$1.15bn) Julius Avenue Data Centre project is underway, with Australian real estate firm ISPT filing a State Significant Development application with the New South Wales Government.
3.73 miles OVH Sydney SYD-1
3.76 miles 5G Networks: Sydney
In 2019, 5G Networks acquired Sydney's Australian Pacific Data Centres (APDC) for $3.5 million in cash.
3.82 miles Digital Realty: North Ryde, Sydney
Digital Realty is planning a redevelopment of the site located at 23-25 Waterloo Road in Macquarie Park, Sydney.
3.83 miles Fujitsu: North Ryde, Sydney
Digital Realty is planning a redevelopment of the site located at 23-25 Waterloo Road in Macquarie Park, Sydney.
3.86 miles Viridis: Sydney, Australia
A highly secure, zero-water-consumption green edge data center located within 15 kilometers of the Sydney CBD, engineered to support defense-grade, high-density government and enterprise workloads.
3.90 miles NEXTDC: S1 Sydney
Delivering 16 MW of critical power to Melbourne customers, M1’s prime location sees it located less than 3km from Melbourne’s CBD and is the largest independent data centre in the city with 6,000m2 of high-density technical space.
3.91 miles Metro PointInterested in this information?Contact us
3.99 miles DigiCo: SYD1 West
Situated in the Ultimo area, this massive facility consists of two adjacent conjoined buildings, known as East and West. The campus occupies an impressive 72,575 square meters of space.
4.00 miles DigiCo: SYD1 East
Situated in the Ultimo area, this massive facility consists of two adjacent conjoined buildings, known as East and West. The campus occupies an impressive 72,575 square meters of space.
4.01 miles Point AlphaInterested in this information?Contact us
4.01 miles NextDC: S5 Sydney
NEXTDC has announced plans for its fifth data center in Sydney, known as S5 Sydney. The facility will be located in the Macquarie Park availability zone.
4.02 miles LEDC: DigiCo SYD1
LEDC has the ability to deploy workloads within Digico’s available 1MW capacity and can bring additional capacity online quickly within their existing Colo environment.
4.07 miles Goodman: Project Apollo
Goodman is set to invest AU$1 billion ($690m) into a new data center development in Macquarie Park, Sydney, dubbed "Project Apollo."
4.20 miles NextDC: S2 Sydney
Located in Macquarie Park, S2 Sydney is certified to Uptime Institute Tier IV for both design and construction, delivering fully fault-tolerant resilience for business-critical and regulated workloads.
4.27 miles Macquarie: IC3 East
4.28 miles Macquarie IC2
4.29 miles Macquarie: IC3 Super West
IC3 Super West will deliver critical AI infrastructure to Sydney’s north zone starting in September 2026.
4.35 miles EdgeConneX: SYD1 (MPark)
EdgeConneX's debut in Australia - a 76.4 MW hyperscale data centre in Sydney's Macquarie Park, developed and operated through a 50:50 joint venture with Stockland and branded SYD1.
4.41 miles Stockland: Macquarie Park Stage 1
Australian real estate firm Stockland is constructing a five-story data center in Macquarie Park, Sydney. The facility, valued at AU$264 million (US$204.3 million), will be leased to a 'major cloud computing provider,' believed to be AWS.
4.44 miles Macquarie: IC6
Macquarie intends to construct its IC6 data center in Sydney's North Zone.
4.44 miles Macquarie IC1
4.97 miles Macquarie: IC7
Macquarie intends to construct its IC7 data center in Sydney's North Zone.
5.82 miles Unisys Rhodes
6.26 miles Markham: Sydney
Markham Real Estate Partners has submitted plans to the New South Wales government for a new data center in Alexandria, Sydney.
6.46 miles Equinix Sydney SY3
6.46 miles Ridge ProInterested in this information?Contact us
6.69 miles Vocus Sydney
6.74 miles DXN-SYD01
6.90 miles Equinix Sydney SY5
6.91 miles Equinix Sydney SY4
6.94 miles East RidgeInterested in this information?Contact us
6.94 miles Fujitsu Sydney Olympic Park (Homebush)
7.04 miles Goodman: Project Duke
Real estate firm Goodman is planning to develop a new data center in the Mascot area of Sydney, Australia.
7.05 miles Vocus: SYD04
Vocus SYD04 is a colocation data center in Rosebery, south of Sydney's CBD, that opened as Metronode Sydney 1 and ran as Equinix SY8 before Vocus took it over in 2022.
7.12 miles INAP Sydney
7.12 miles Equinix Sydney SY1 and SY2
7.75 miles Equinix SY6
The facility currently offers 5,554 sq m (approximately 60,000 sq ft) of white space and 1,035 sq m (11,000 sq ft) of separate rentable space, and only hosts enterprise customers.
8.72 miles Equinix SY9X
SY9x, Equinix's first xScale data center in Sydney, is located in Rosehill, near the Western Sydney CBD of Parramatta.
8.78 miles Equinix: SY10x
SY10x, Equinix's second xScale data center in Sydney, will be located in Rosehill, near the Western Sydney CBD of Parramatta.
8.96 miles Macquarie Park Campus 2
Macquarie Technology Group, an Australian tech company, plans to acquire more land in Sydney for a new data center campus.
13.44 miles Goodman: Project Pluto
The site for this development is located at 132 McCredie Road, which was previously Castrol's headquarters.
13.75 miles Vocus: SYD02
13.85 miles GreenSquareDC: SYD1 Bldg2
GreenSquareDC aims to develop a new three-story data center on its Sydney Campus, spanning 10,705 sqm (115,227 sq ft).
13.92 miles GreenSquareDC: SYD1 Bldg1
GreenSquareDC, an Australian data center firm, is expanding its Brookhollow Avenue campus in Sydney.
13.94 miles East RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.97 miles Edge CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
14.69 miles Woolworths
15.08 miles Global CampusInterested in this information?Contact us
15.08 miles Fujitsu Western Sydney Data Centre
16.01 miles EdgeConneX: Wetherill 2
This facility is a part of Davis Road Campus in Wetherill Park, NSW.
16.09 miles Stockland: Wetherill Park NSW
Stockland, in a 50:50 joint venture with global hyperscale operator EdgeConneX, is developing the Davis Road Data Centre in Wetherill Park, NSW.
16.12 miles EdgeConneX: Wetherill 1
Stockland, in a 50:50 joint venture with global hyperscale operator EdgeConneX, is developing the Davis Road Data Centre in Wetherill Park, NSW.
17.22 miles DCI Sydney Eastern Creek
Located at Eastern Creek, in the heart of Sydney's Western Region growth corridor, our SYD01 data centre has 11MW of power.
17.26 miles DCI: SYD02
DCI Data Centers has received State Significant Development (SSD) approval for its SYD02/SYD03 data center. This facility will be constructed next to the existing SYD01 site in Huntingwood.
17.54 miles Datacom: AirTrunk SYD1
Datacom operates dedicated and secure data halls within AirTrunk’s hyperscale SYD1 data center
17.56 miles AirTrunk Sydney
17.90 miles AirTrunk SYD3 Sydney West
18.21 miles Huntingwood & Brabham
18.27 miles Park ThreeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
19.89 miles CDC Eastern Creek 2
19.90 miles CDC Eastern Creek 1
19.95 miles Center PrimeInterested in this information?Contact us
19.97 miles MetroInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
20.00 miles CDC Eastern Creek 3
EC3 is the third data center building of CDC Eastern Creek Campus. Eastern Creek 3 became operational in 2021.

Goodman: Artarmon Data Center Photos See all

Goodman plans to redevelop ABC Studio site in Sydney
Source: Google Maps

Operating Company

Operated by:

Goodman is a global property group who own, develop and manage quality, sustainable properties close to consumers, and we’re dedicated to working together to make the world a better place for our customers, our people and the communities we operate in.

0
Facilities
0
Markets

News See all

Read CDC Refiles Kemps Creek Plan, Lifting Sydney Campus to 1.4GW
[CDC](https://baxtel.com/data-centers/canberra-data-centres-cdc) has refiled its Kemps Creek data center plan, expanding a single 144MW building into a six-building campus rated at 1.4GW. The [New ...

CDC Refiles Kemps Creek Plan, Lifting Sydney Campus to 1.4GW

November 12, 2026 Canberra Data Centres (CDC)

CDC has refiled its Kemps Creek data center plan, expanding a single 144MW building into a six-building campus rated at 1.4GW. The New South Wales Department of Planning lists the revised State Significant Development application, SSD-133677993, at a total power consumption of 1.4GW. Baxtel...

Read more
Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read AirTrunk Secures A$4.25B Green Loan for SYD3 Sydney Campus
AirTrunk has secured an [A$4.25 billion green loan](https://airtrunk.com/airtrunk-secures-a4-25b-green-loan-for-syd3-western-sydney-expansion-supporting-australias-digital-economy) to fund continue...

AirTrunk Secures A$4.25B Green Loan for SYD3 Sydney Campus

October 28, 2026 AirTrunk

AirTrunk has secured an A$4.25 billion green loan to fund continued development of its SYD3 campus in Western Sydney. Reuters put the facility at about US$2.98 billion. Thirty-two local and international financial institutions backed the debt, which 14 lead banks underwrote. AirTrunk develops and...

Read more
Read Princeton Digital Group Linked to A$1B, 100MW Sydney Data Centre
Planning documents filed with the [New South Wales](https://baxtel.com/regions/new-south-wales) government identify [Princeton Digital Group](https://baxtel.com/data-centers/princeton-digital-group...

Princeton Digital Group Linked to A$1B, 100MW Sydney Data Centre

October 26, 2026 Princeton Digital Group

Planning documents filed with the New South Wales government identify Princeton Digital Group as the client behind a 100-megawatt data centre in Sydney's southwest. The scoping report, first reported by Mingtiandi on Oct. 24, describes capital investment above A$1 billion (US$701 million). If...

Read more
Read Goodman Withdraws Plans for 90MW Data Center Campus in Sydney, Australia
Australian real estate firm Goodman Group has withdrawn plans for Project Mars, a 90MW data center campus in Sydney’s Lane Cove area. The company said the application was withdrawn following signif...

Goodman Withdraws Plans for 90MW Data Center Campus in Sydney, Australia

September 28, 2026 Goodman Group

Australian real estate firm Goodman Group has withdrawn plans for Project Mars, a 90MW data center campus in Sydney’s Lane Cove area. The company said the application was withdrawn following significant changes to the policy and regulatory environment for large-scale data center development since...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.