COP26 and OpenUK's 'Patchwork Kilt' Edge data center blueprint
November 12, 2021
Glasgow
Located in the Hamilton International Technology Park, this facility provides 5,000 sq ft of raised floor white space for regional colocation and disaster recovery. The site features 2N+1 electrical redundancy and N+1 cooling, ensuring high resiliency for critical IT infrastructure. It is a carrier-neutral hub powered by 100% certified green energy and is backed by a 100% power uptime SLA.
The Asanti Hamilton data centre was acquired from Daisy Group in November 2022.
| Distance | Site | About |
|---|---|---|
| 5.37 miles | Apatura: Wishaw, Motherwell |
Apatura plans a significant £3.9 billion ($5.34bn) investment to develop a data center campus and battery energy storage system (BESS) at the former Ravenscraig Steelworks in Motherwell, North Lanarkshire.
|
| 6.84 miles | DataVita: Lanarkshire DV1 |
DV1, opened in 2016, stands as Scotland's premier, Uptime Institute-certified purpose-built co-location data centre, strategically located in the heart of the country.
|
| 8.01 miles | ILI Group: Aurelius Campus |
Renewable energy firm ILI Group is planning a new, state-of-the-art AI-focused data center campus, the Aurelius facility, in Newarthill, North Lanarkshire.
|
| 8.22 miles | ILI Group: Aurelius Expansion | |
| 8.51 miles | DataVita: Glasgow DV2 |
The purpose-built, Tier III-designed DV2 is located in the heart of Glasgow's business district, situated in the basement of a 14-story, 313,000 sq ft (29,000 m²) property billed as 'Glasgow's largest single office building.'
|
| 8.62 miles | iomart DC1 Glasgow |
|
| 10.03 miles | Energy Data Center Request Dataset |
The Westerhill AI Energy Campus is an ambitious development combining a state-of-the-art AI data center campus with an integrated, large-scale Battery Energy Storage System (BESS).
|
| 10.12 miles | Energy Data Center Request Dataset |
This facility is part of Apatura's Westerhill AI Energy Campus in Glasgow, Scotland.
|
| 10.19 miles | Energy Data Center Request Dataset |
This facility is part of Apatura's Westerhill AI Energy Campus in Glasgow, Scotland.
|
| 10.36 miles | Energy Data Center Request Dataset |
This facility is part of Apatura's Westerhill AI Energy Campus in Glasgow, Scotland.
|
| 18.33 miles | ILI Group: Rufus Expansion | |
| 18.57 miles | ILI Group: Rufus Campus |
Renewable energy firm ILI Group is planning the Rufus data center campus in Hulford, East Ayrshire.
|
| 19.97 miles | Apatura: Larbert AI DC |
A new AI data center campus is planned for Plean, Scotland, by UK renewables developer Apatura. The project is expected to deliver more than £2 billion of investment and create over 2,000 jobs.
|
Asanti is a specialized colocation data centre provider led by a leadership team with extensive experience in the design, deployment, and management of mission-critical infrastructure. The company operates six strategically located data centres across the UK, selected for their superior network coverage and high power availability. By utilizing paired locations, Asanti provides robust business-live and disaster recovery options for critical IT workloads, all backed by a 99.99% uptime SLA and powered by 100% certified green energy.
November 12, 2021
Glasgow
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas