Data center Planned at Coal Store in East Lothian, Scotland
October 21, 2025
Scotland
| Distance | Site | About |
|---|---|---|
| 0.22 miles | ILI Group: Aurelius Campus |
Renewable energy firm ILI Group is planning a new, state-of-the-art AI-focused data center campus, the Aurelius facility, in Newarthill, North Lanarkshire.
|
| 1.49 miles | DataVita: Lanarkshire DV1 |
DV1, opened in 2016, stands as Scotland's premier, Uptime Institute-certified purpose-built co-location data centre, strategically located in the heart of the country.
|
| 3.64 miles | Apatura: Wishaw, Motherwell |
Apatura plans a significant £3.9 billion ($5.34bn) investment to develop a data center campus and battery energy storage system (BESS) at the former Ravenscraig Steelworks in Motherwell, North Lanarkshire.
|
| 8.22 miles | Asanti: Hamilton |
Located in the Hamilton International Technology Park, this facility provides 5,000 sq ft of raised floor white space for regional colocation and disaster recovery.
|
| 12.03 miles | Energy Data Center Request Dataset |
The Westerhill AI Energy Campus is an ambitious development combining a state-of-the-art AI data center campus with an integrated, large-scale Battery Energy Storage System (BESS).
|
| 12.05 miles | Energy Data Center Request Dataset |
This facility is part of Apatura's Westerhill AI Energy Campus in Glasgow, Scotland.
|
| 12.09 miles | Energy Data Center Request Dataset |
This facility is part of Apatura's Westerhill AI Energy Campus in Glasgow, Scotland.
|
| 12.20 miles | Energy Data Center Request Dataset |
This facility is part of Apatura's Westerhill AI Energy Campus in Glasgow, Scotland.
|
| 13.72 miles | DataVita: Glasgow DV2 |
The purpose-built, Tier III-designed DV2 is located in the heart of Glasgow's business district, situated in the basement of a 14-story, 313,000 sq ft (29,000 m²) property billed as 'Glasgow's largest single office building.'
|
| 13.74 miles | Apatura: Larbert AI DC |
A new AI data center campus is planned for Plean, Scotland, by UK renewables developer Apatura. The project is expected to deliver more than £2 billion of investment and create over 2,000 jobs.
|
| 13.78 miles | Apatura: Larbert Expansion | |
| 14.24 miles | ATOS: Livingston |
The facility is owned and operated by Atos Group, but since 2022 (and extended in 2025), a significant portion of its capacity is leased and marketed by Asanti.
|
| 14.30 miles | Asanti: Livingston |
Located in Scotland’s central belt, the Asanti Livingston Data Centre is a premier Tier III-compliant facility designed for high-density colocation and maximum resilience.
|
| 14.36 miles | iomart DC1 Glasgow |
|
Intelligent Land Investments Group (ILI Group) works primarily in the Renewable energy and Energy Storage markets.
ILI Group has aligned itself with Government policy and plans to bring 2GW of Pumped Storage Hydro and over 1GW of utility scale battery storage to the market.
October 21, 2025
Scotland
June 21, 2025
Scotland
April 25, 2024
Scotland
December 06, 2023
Scotland
June 16, 2023
Scotland
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas