Eurofiber: Rotterdam 2

Latest Podcast Schuttevaerweg 48
Operational
Fully operational facility
Operated by:

Eurofiber: Rotterdam 2

Map and Nearby Locations

Schuttevaerweg 48
Eurofiber Sites
Nearby Facilities

Sites within 15 miles of Eurofiber: Rotterdam 2

Distance Site About
0.00 miles Digital Residence Rotterdam Spanish Cube
0.89 miles SmartDC Rotterdam
2.09 miles NorthC: Rotterdam Zestienhoven 2
Zestienhoven 2 is NorthC's modular building at Hatostraat 58, built by Kuijpers in 2021 against the original Zestienhoven 1, with 3,000 m² of data floor fitted out as demand grows.
2.11 miles BT Netherlands: Rotterdam
BT Netherlands operates a facility in Rotterdam.
2.12 miles NorthC: Rotterdam Zestienhoven 1
Zestienhoven 1 is the original NorthC building on the Rotterdam Zestienhoven campus: a 3,000 m² data center at Tempelhof 5 with 1,600 m² of data floor, 2N generators and direct-air cooling.
2.61 miles Luna Rotterdam Puntegale
3.19 miles House of Data: Rotterdam
New Dutch operator House of Data plans to build a data center in Rotterdam.
4.04 miles Cellnex: Rotterdam
4.08 miles NorthC: Rotterdam Waalhaven
The site is located on the TU Delft campus
4.23 miles NorthC: Delft
4.89 miles Caveo Internet
5.81 miles Databarn Rotterdam Rivium
7.06 miles Data Facilities Spijkenisse DF1
Established in 2012 as an offshoot of the hosting provider Netrouting, Data Facilities began operations following the acquisition of a former EDS HP data center located in Spijkenisse.
7.45 miles Caveo Internet Capelle
7.92 miles ColoCenter Zoetermeer
7.92 miles Digital Residence Colo Centre Zoetermeer
8.75 miles Switch Datacenters: AMS8
Switch Datacenters AMS8 is situated in Maasdijk, within the Rotterdam region. Construction is slated to begin in 2026.
9.34 miles Data Facilities: The Hague
In 2014, Data Facilities acquired a former Vodafone Libertel site in The Hague, now known as THG1.
9.34 miles ColoHouse The Hague
9.95 miles Greenhouse Datacenters DC1
9.95 miles Worldstream: Naaldwijk
10.01 miles Greenhouse Datacenters: DC3
DC3 is the third Greenhouse Datacenters colocation facility in Naaldwijk, in the Westland region between Rotterdam and The Hague, built behind the company's DC2 building.
10.02 miles Greenhouse DC2
10.90 miles UniQloud: The Hague PB400
PB400 is UniQloud's data center at Prinses Beatrixlaan 400 in The Hague, a brownfield conversion of a six-floor, 32,000-square-meter building. UniQloud markets sovereign, Dutch- and EU-governed cloud and colocation from the facility, with two direct-liquid-cooled floors and one air-cooled floor designed for NVIDIA NVL72 and Vera Rubin systems. The site has 11 carriers on site and sits about 40 km from the Amsterdam Internet Exchange.
10.91 miles Cellnex: The Hague
13.85 miles VOLT: Rotterdam AI Gigafactory
Dutch AI data center company Volt has announced plans to develop a massive "AI Gigafactory" at the Port of Rotterdam, spearheading a national bid to host one of the European Union's flagship 300MW supercomputing clusters.
17.36 miles Cellnex: Alphen aan den Rijn

Operating Company

Operated by:

Eurofiber is part of the Eurofiber Group and was established in 2000. Since then it has grown into an organisation with more than 280 employees, with offices in Maarsen and Brussels (Belgium) and has become a recognised player in the market for fibre-optic connections. In June 2015 infrastructure Antin Infrastructure Fund has acquired all shares in Eurofiber. Although we are definitely no longer a start-up, we still enjoy challenging the established order with our unique market approach.

0
Facilities
0
Markets

News See all

Read Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory
[VOLT](https://baxtel.com/data-centers/volt-data-centers) has lined up [Nebius](https://baxtel.com/data-centers/nebius) as the first off-taker at its [Rotterdam AI Gigafactory](https://fromvolt.com...

Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory

October 13, 2026 Nebius

VOLT has lined up Nebius as the first off-taker at its Rotterdam AI Gigafactory, the anchor customer the Dutch developer needs before it can take a 600 MW campus at the Port of Rotterdam to lenders. The letter of intent, announced Monday, covers a long-term lease, with a first phase of two...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.