Digital Residence Colo Centre Zoetermeer

Latest Podcast Heliumstraat 200
Operational
Fully operational facility

Digital Residence Colo Centre Zoetermeer

Map and Nearby Locations

Heliumstraat 200
Digital Residence BV Sites
Nearby Facilities

Sites within 15 miles of Digital Residence Colo Centre Zoetermeer

Distance Site About
0.00 miles Colo Center Rotterdam
5.14 miles Data Facilities: The Hague
In 2014, Data Facilities acquired a former Vodafone Libertel site in The Hague, now known as THG1.
5.14 miles ColoHouse The Hague
5.76 miles NorthC: Delft
5.92 miles NorthC: Rotterdam Zestienhoven 1
Zestienhoven 1 is the original NorthC building on the Rotterdam Zestienhoven campus: a 3,000 m² data center at Tempelhof 5 with 1,600 m² of data floor, 2N generators and direct-air cooling.
5.93 miles BT Netherlands: Rotterdam
BT Netherlands operates a facility in Rotterdam.
5.95 miles NorthC: Rotterdam Zestienhoven 2
Zestienhoven 2 is NorthC's modular building at Hatostraat 58, built by Kuijpers in 2021 against the original Zestienhoven 1, with 3,000 m² of data floor fitted out as demand grows.
6.65 miles Caveo Internet Capelle
7.57 miles Cellnex: The Hague
7.58 miles UniQloud: The Hague PB400
PB400 is UniQloud's data center at Prinses Beatrixlaan 400 in The Hague, a brownfield conversion of an existing building. UniQloud markets sovereign, Dutch- and EU-governed cloud and colocation from the facility, with one floor designed for liquid-to-chip cooling and one for immersion cooling.
7.78 miles House of Data: Rotterdam
New Dutch operator House of Data plans to build a data center in Rotterdam.
7.92 miles Bytesnet Rotterdam
7.92 miles Digital Residence Rotterdam Spanish Cube
7.92 miles TCN Spaanse Kubus (Spanish Cube)
8.05 miles SmartDC Rotterdam
8.75 miles Databarn Rotterdam Rivium
8.83 miles Luna Rotterdam Puntegale
9.60 miles Cellnex: Alphen aan den Rijn
11.07 miles Cellnex: Rotterdam
11.12 miles NorthC: Rotterdam Waalhaven
The site is located on the TU Delft campus
12.35 miles WorldStream Naaldwijk
12.35 miles Greenhouse Datacenters DC1
12.41 miles Greenhouse DC2
12.60 miles Caveo Internet
13.04 miles Switch Datacenters: AMS8
Switch Datacenters AMS8 is situated in Maasdijk, within the Rotterdam region. Construction is slated to begin in 2026.
14.82 miles Data Facilities Spijkenisse DF1
Established in 2012 as an offshoot of the hosting provider Netrouting, Data Facilities began operations following the acquisition of a former EDS HP data center located in Spijkenisse.
17.17 miles Switch Datacenters AMS2 (Woerden)
Switch Datacenters Amsterdam 2 (AMS2) is a premium colocation datacenter located in the municipality of Woerden.
17.93 miles VOLT: Rotterdam AI Gigafactory
Dutch AI data center company Volt has announced plans to develop a massive "AI Gigafactory" at the Port of Rotterdam, spearheading a national bid to host one of the European Union's flagship 300MW supercomputing clusters.
19.12 miles Switch Datacenters: AMS6
The AMS6 site is currently being retrofitted from a logistics hall into a high-end, AI/HPC-ready data center.
19.35 miles Digital Realty: AMS16
19.37 miles Digital Realty: Amsterdam AMS15
19.56 miles NorthC: Aalsmeer
The Aalsmeer data center is part of a unique project for the exchange of residual heat.
19.75 miles Digital Realty: AMS8
19.88 miles Schuberg Philis

Operating Company

Digital Residence was founded in 2006

0
Facilities
0
Markets

News See all

Read Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory
[VOLT](https://baxtel.com/data-centers/volt-data-centers) has lined up [Nebius](https://baxtel.com/data-centers/nebius) as the first off-taker at its [Rotterdam AI Gigafactory](https://fromvolt.com...

Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory

October 13, 2026 Nebius

VOLT has lined up Nebius as the first off-taker at its Rotterdam AI Gigafactory, the anchor customer the Dutch developer needs before it can take a 600 MW campus at the Port of Rotterdam to lenders. The letter of intent, announced Monday, covers a long-term lease, with a first phase of two...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?