DC3 is the third of Greenhouse Datacenters' three data centers in Naaldwijk. It stands behind the DC2 building and uses the same modular layout as DC2, so colocation customers can add capacity as their IT grows instead of reserving it all up front. The infrastructure follows Tier III design rules without formal certification. The UPS plant is 2N+1: two UPS systems that can each carry the full IT load, plus a compact extra module. Double cooling ring mains add redundancy on the cooling side. Greenhouse designed the building in-house with Eaton, Zwart Techniek, Zwarts Bouwbedrijf and Stulz, and reports a water usage effectiveness of 0.38 litres per kWh on Dutch wind power. An in-house DCIM system models the halls, aisles and racks as a digital twin.
Greenhouse chose to expand in Westland because the local grid has no congestion, unlike Amsterdam, and the site has under 1 ms of latency to the Amsterdam exchanges. That headroom has drawn other data center requests, and in December 2025 the municipality published a draft rule that would ban new data centers and the expansion of existing ones across Westland.
Site History
- December 2025: Westland published a draft zoning rule that would bar new data centers and expansions in the municipality.
- February 2025: Greenhouse put DC3 into service, its third site in the Rotterdam and The Hague area.
- June 2024: Freshstream took a majority stake in Worldstream, Greenhouse's sister company, and backs the group's expansion.
- May 2020: Greenhouse said it was planning DC3 near its two existing Naaldwijk sites.