Greenhouse Datacenters: DC3

Latest Podcast Industriestraat 53B
Operational
Fully operational facility
Operated by:

Greenhouse Datacenters: DC3

Year Built: 2025
PUE: 1.15
Utility Provider: Westland Infra
░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power

DC3 is the third of Greenhouse Datacenters' three data centers in Naaldwijk. It stands behind the DC2 building and uses the same modular layout as DC2, so colocation customers can add capacity as their IT grows instead of reserving it all up front. The infrastructure follows Tier III design rules without formal certification. The UPS plant is 2N+1: two UPS systems that can each carry the full IT load, plus a compact extra module. Double cooling ring mains add redundancy on the cooling side. Greenhouse designed the building in-house with Eaton, Zwart Techniek, Zwarts Bouwbedrijf and Stulz, and reports a water usage effectiveness of 0.38 litres per kWh on Dutch wind power. An in-house DCIM system models the halls, aisles and racks as a digital twin.

Greenhouse chose to expand in Westland because the local grid has no congestion, unlike Amsterdam, and the site has under 1 ms of latency to the Amsterdam exchanges. That headroom has drawn other data center requests, and in December 2025 the municipality published a draft rule that would ban new data centers and the expansion of existing ones across Westland.

Site History

  • December 2025: Westland published a draft zoning rule that would bar new data centers and expansions in the municipality.
  • February 2025: Greenhouse put DC3 into service, its third site in the Rotterdam and The Hague area.
  • June 2024: Freshstream took a majority stake in Worldstream, Greenhouse's sister company, and backs the group's expansion.
  • May 2020: Greenhouse said it was planning DC3 near its two existing Naaldwijk sites.

Map and Nearby Locations

Industriestraat 53B
Greenhouse Datacenters BV Sites
Nearby Facilities

Greenhouse Datacenters: DC3 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Greenhouse Datacenters: DC3

Distance Site About
0.03 miles Greenhouse DC2
0.07 miles Greenhouse Datacenters DC1
0.07 miles Worldstream: Naaldwijk
2.90 miles Switch Datacenters: AMS8
Switch Datacenters AMS8 is situated in Maasdijk, within the Rotterdam region. Construction is slated to begin in 2026.
5.75 miles VOLT: Rotterdam AI Gigafactory
Dutch AI data center company Volt has announced plans to develop a massive "AI Gigafactory" at the Port of Rotterdam, spearheading a national bid to host one of the European Union's flagship 300MW supercomputing clusters.
7.41 miles NorthC: Delft
7.66 miles UniQloud: The Hague PB400
PB400 is UniQloud's data center at Prinses Beatrixlaan 400 in The Hague, a brownfield conversion of a six-floor, 32,000-square-meter building. UniQloud markets sovereign, Dutch- and EU-governed cloud and colocation from the facility, with two direct-liquid-cooled floors and one air-cooled floor designed for NVIDIA NVL72 and Vera Rubin systems. The site has 11 carriers on site and sits about 40 km from the Amsterdam Internet Exchange.
7.69 miles Cellnex: The Hague
8.72 miles Data Facilities: The Hague
In 2014, Data Facilities acquired a former Vodafone Libertel site in The Hague, now known as THG1.
8.72 miles ColoHouse The Hague
10.01 miles Digital Residence Rotterdam Spanish Cube
10.01 miles Eurofiber: Rotterdam 2
10.68 miles NorthC: Rotterdam Zestienhoven 2
Zestienhoven 2 is NorthC's modular building at Hatostraat 58, built by Kuijpers in 2021 against the original Zestienhoven 1, with 3,000 m² of data floor fitted out as demand grows.
10.69 miles NorthC: Rotterdam Zestienhoven 1
Zestienhoven 1 is the original NorthC building on the Rotterdam Zestienhoven campus: a 3,000 m² data center at Tempelhof 5 with 1,600 m² of data floor, 2N generators and direct-air cooling.
10.69 miles BT Netherlands: Rotterdam
BT Netherlands operates a facility in Rotterdam.
10.80 miles Data Facilities Spijkenisse DF1
Established in 2012 as an offshoot of the hosting provider Netrouting, Data Facilities began operations following the acquisition of a former EDS HP data center located in Spijkenisse.
10.90 miles SmartDC Rotterdam
12.41 miles Digital Residence Colo Centre Zoetermeer
12.41 miles ColoCenter Zoetermeer
12.60 miles Luna Rotterdam Puntegale
12.83 miles Caveo Internet
13.09 miles House of Data: Rotterdam
New Dutch operator House of Data plans to build a data center in Rotterdam.
13.38 miles Cellnex: Rotterdam
13.39 miles NorthC: Rotterdam Waalhaven
The site is located on the TU Delft campus
15.68 miles Databarn Rotterdam Rivium
16.32 miles Caveo Internet Capelle

Operating Company

Operated by:

Greenhouse Datacenters BV is a sister company of the Dutch infrastructure-as-a-service provider Worldstream, and in June 2024 the private equity firm Freshstream took a majority stake in the group. The company was registered in January 2013, opened its first data center that year, and has its head office on Industriestraat in Naaldwijk. It runs colocation from three data center sites in Naaldwijk, from a few racks to full cages, plus connectivity and bespoke infrastructure services. Customers include IT service providers, MSPs, hosting providers, system integrators, and organizations in healthcare, finance, and the public sector.

More than 10 connectivity providers serve the sites, along with internet exchanges including AMS-IX, NL-IX, DE-CIX, and SpeedIX, and an AMS-IX point of presence on site. The IOEMA project selected Greenhouse as a landing station for its planned subsea cable linking the Netherlands, Germany, the United Kingdom, Denmark, and Norway. The sites run on 100 percent green electricity and hold ISO/IEC 27001, ISO 9001, ISO 14001, NEN 7510, PCI DSS, and ISAE 3402 certifications.

Greenhouse Datacenters BV History:

  • In February 2025, Greenhouse put its third data center, DC3, into use in Naaldwijk.
  • In June 2024, Freshstream took a majority stake in Worldstream, a deal that included sister company Greenhouse Datacenters.
  • In May 2020, Greenhouse doubled its data center capacity.
  • Founded in 2013 in Naaldwijk.
0
Facilities
0
Markets

News See all

Read Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory
[VOLT](https://baxtel.com/data-centers/volt-data-centers) has lined up [Nebius](https://baxtel.com/data-centers/nebius) as the first off-taker at its [Rotterdam AI Gigafactory](https://fromvolt.com...

Nebius Signs LOI to Anchor VOLT's 600MW Rotterdam AI Gigafactory

October 13, 2026 Nebius

VOLT has lined up Nebius as the first off-taker at its Rotterdam AI Gigafactory, the anchor customer the Dutch developer needs before it can take a 600 MW campus at the Port of Rotterdam to lenders. The letter of intent, announced Monday, covers a long-term lease, with a first phase of two...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.