Go to Podcast| Distance | Site | About |
|---|---|---|
| 0.00 miles | Equinix Calgary CL3 |
The site was formerly known as "Q9 Calgary 3" which was acquired by Equinix in 2020 from Bell Canada.
|
| 1.14 miles | eStruxture Calgary CAL-1 |
eStruxture's first Calgary data centre, in an industrial building in southeast Calgary. Shaw Communications built it in 2015, and eStruxture bought it in 2019 and has expanded it in phases.
|
| 5.47 miles | Equinix Calgary CL2 |
The site was formerly known as "Q9 Calgary 2" which was acquired by Equinix in 2020 from Bell Canada.
|
| 5.68 miles | Rogers Calgary DC1 |
The CGY1 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
| 5.75 miles | Qu DC: Calgary 1 |
Qu Data Centres' CGY1 is a colocation data centre in the Franklin Atrium building in northeast Calgary. It was one of nine Rogers data centres sold to InfraRed Capital Partners in 2025.
|
| 6.74 miles | Rigstar Industrial Telecom |
Rigstar, now RSG Telecom, ran a small data centre on the top floor of Hanover Place in downtown Calgary. The tower was vacated and is being converted to apartments.
|
| 6.78 miles | Beacon Chestermere AI Hub |
Beacon AI Centers is planning to build a new data center campus known as the Chestermere Artificial Intelligence Hub.
|
| 6.83 miles | Equinix Calgary CL1 |
Located in Bankers Hall in Calgary's financial district, Equinix CL1 has about 12,900 sq ft of colocation space.
|
| 6.91 miles | Beacon Langdon AI Hub |
Beacon Data Centers plans the Indus Data Centre Hub, a 946-acre AI data centre campus near Indus, just east of Calgary, with its own gas-fired power plant.
|
| 6.99 miles | TNW Watermark Tower |
TNW Networks (téliPhone) ran a small colocation room in Watermark Tower, a 27-storey office building in downtown Calgary. The room opened in 1999 and has since closed.
|
| 7.00 miles | Hosted in Canada - Calgary Watermark | |
| 7.03 miles | Nucleus Calgary |
Nucleus Information Service, Calgary's first internet provider, ran a small server room at its downtown Calgary office. Fibernetics bought Nucleus in 2014, and the Calgary office has since closed.
|
| 7.21 miles | DataHiveTwo |
DataHive's second downtown Calgary data centre, DataHiveTwo, opened in 2024 on the fourth floor of the Nexen Building at 801 Seventh. The facility spans roughly 9,000 sq ft (836 sqm).
|
| 7.26 miles | Cologix: Calgary CGY1 |
US data center firm Cologix acquired this data center from local operator DataHive in 2025. The data center sits within a 21-storey office building built in 1979.
|
| 7.31 miles | Rogers: Calgary NIDC |
Rogers runs a network data centre, formerly Shaw's NIDC, in an industrial building in northeast Calgary.
|
| 7.50 miles | Rogers Calgary DC2 |
The CGY2 facility (along with eight other data centers across Canada) was acquired from Rogers Communications by InfraRed Capital Partners.
|
| 7.52 miles | Qu DC: CGY2 |
Qu Data Centres' CGY2 is a downtown-edge colocation data centre in Calgary's Beltline. It was one of nine Rogers data centres sold to InfraRed Capital Partners in 2025.
|
| 7.64 miles | TELUS: Calgary IDC |
TELUS's Calgary Internet Data Centre occupies a four-storey building in the Sunalta district, just west of downtown Calgary. TELUS opened it in 2001 and has upgraded its power and cooling several times since.
|
| 7.72 miles | Rogers: Calgary Shaw Data Centre |
Rogers runs an internal network data centre on the former Shaw campus in northeast Calgary. Shaw built the purpose-built data centre building between 2011 and 2015, and it passed to Rogers with the 2023 Shaw merger.
|
| 7.86 miles | Arrow: Calgary DC2 |
Arrow Datacenters' DC2 is a carrier-neutral colocation data centre in northeast Calgary and the city's busiest peering point. It links to Arrow's downtown interconnection suite in the 840 7th Avenue SW carrier hotel.
|
| 9.08 miles | Real Estate Data CenterInterested in this information?Contact us |
Proposed data centre park on the east edge of Chestermere, just east of Calgary.
|
| 10.81 miles | Campus OneInterested in this information?Contact us |
Plexus Technology runs a container bitcoin mining site powered by natural gas generators near Langdon in Rocky View County, Alberta.
|
| 11.01 miles | Wild Rose Power Hub |
The Wild Rose Power Hub is a large-scale, $10 billion "gigawatt-scale" data center and power generation project located in Rocky View County.
|
| 15.60 miles | eStruxture CAL-2 |
In 2021, eStruxture announced plans for a second data center in Calgary, Canada that came online in 2023. The new Cal-2 facility spans 93,000 sq ft (8,640 sqm) and has been built to Tier III standards.
|
| 16.29 miles | eStruxture: CAL-3 |
Canadian data center operator eStruxture plans to invest more than CA$750 million (US$540.2m) to build CAL-3, a new data center in Calgary, Alberta.
|
| 16.29 miles | CoreWeave: Calgary CAL-3 |
CoreWeave is the anchor tenant of the first phase of eStruxture's CAL-3 data centre in Rocky View County, just north of Calgary.
|
| 18.14 miles | Rocky View Technology Park |
The proposed Rocky View Technology Park, a large data center and power plant campus near Calgary, was rejected by Rocky View County councillors in September 2025.
|
| 18.88 miles | Goldfinch Technology Park |
A 575-acre data center campus called the Goldfinch Technology Park is being proposed near Calgary, Alberta, by developer Diode Ventures.
|
| 19.70 miles | ValleyInterested in this information?Contact us |
Atland Tech Solution plans a gas-powered bitcoin mining and data centre site northwest of Strathmore in Wheatland County, Alberta, next to an existing gas compressor.
|
Mar 12, 2026 Eric Bell World
Go to Podcast
Jan 15, 2026 Eric Bell Applied Digital
Go to Podcast
Jan 05, 2026 Eric Bell Dallas
Go to Podcast
Sep 04, 2025 Eric Bell Texas
Go to Podcast