0.24 miles
|
Google Red Oak TX
|
|
0.41 miles
|
Compass Red Oak Campus
|
Located in south of the Metro, Compass’ second metro campus can expand to more than 155 acres and 262 MW of power.
|
0.45 miles
|
Compass: Red Oak I
|
|
3.29 miles
|
Skybox: PowerCampus Dallas
|
The Skybox PowerCampus is Located at Oncor’s deregulated power territory, Lancaster, TX. PowerCampus™ Dallas will strategically address emerging high-density compute needs in the Dallas area providing up to 300 MWs of power
|
4.85 miles
|
Stack: DFW02 Building 6
|
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
4.89 miles
|
Stack: DFW02 Building 5
|
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
4.94 miles
|
Stack: DFW02 Building 3
|
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
4.95 miles
|
Stack: DFW02 Building 4
|
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
4.99 miles
|
Stack: DFW02 Building 2
|
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
5.08 miles
|
Stack: DFW02 Campus
|
Stack Infrastructure is developing a new data center campus outside Dallas, Texas. The campus, known as DFW2, spans over 102 acres and is set to accommodate both shell and turnkey deployments.
|
15.91 miles
|
Google Midlothian TX
|
Google purchased 375 acres in the Railport Business Park in May 2017 and in July 2018 received Ellis County approval on a 10 year tax abatement agreement between the county and Google. The land was acquired under the entity Sharka LLC.
|
16.13 miles
|
Aligned: DFW-03
|
Aligned Data Centers plans to construct a large data center building on 44 acres on the west side of North Star Road. The two-story building will total more than 450,000 square feet. A new electrical substation is also planned on the site.
|
16.56 miles
|
Google: Midlothian 4
|
Google has filed to construct a new data center building at its campus at the RailPort Business Park in Midlothian outside Dallas, Texas. The $100 million project is due to see a 170,600 sq ft single-story data center.
|
16.72 miles
|
Datacenter.com DAL1
|
|
16.83 miles
|
Cogent: 400 S Akard
|
|
16.83 miles
|
Sprocket DAL2
|
|
16.83 miles
|
Lumen Dallas 4
|
|
16.83 miles
|
DataBank Downtown Dallas DFW1
|
DataBank's 400 South Akard is a seven-story property built in 1921 to house the U.S. Federal Reserve Bank of Dallas. In 2000 the building was renovated as a datacenter, taking advantage of security features from its use as a banking facility.
|
16.83 miles
|
Opus Interactive Dallas
|
|
16.83 miles
|
400 S Akard - Digital Realty
|
The building is a eight story (7 stories with a basement) multi-tenant data center.
An original five-story building which was constructed in 1921 for the Dallas Federal Reserve Bank, and was enlarged by two floors and a mechanical penthouse in 1939. In 1959, the building was expanded to the east with a new adjoining five-story building, and received additional major renovations in 1998 and 2007.
Digital Realty Trust is the building owner, but there are many other data center operators in the building, including:
DataBank DFW-1
Level3
Sprocket DAL2
Cogent
Opus Interactive
|
16.98 miles
|
Lumen Dallas 3
|
|
17.07 miles
|
Opus3
|
|
17.21 miles
|
Sprocket DAL1
|
|
17.21 miles
|
Provision Data Services
|
The building's utility provider is Oncor, which provides redundant access to electrical substations. The data center can provide 2N power redundancy.
|
17.38 miles
|
Hosting.com Dallas
|
|
17.45 miles
|
LOGIX Dallas (2323 Bryan)
|
In 2018 LOGIX Communications acquired Alpheus Communications and this site.
|
17.45 miles
|
CyrusOne Downtown Dallas
|
|
17.45 miles
|
2323 Bryan - Digital Realty
|
Digital Realty's 2323 Bryan Street is an internet gateway and carrier facility in Dallas. Located in the Central Business District (CBD), the building consists of 26 floors and approximately 477,000 SF of datacenter, PBB and office space.
Telx (acquired by DRT) operated the building's Meet-Me Room (MMR). The 35,036 sqft MMR is in suite 2440.
|
17.45 miles
|
Equinix Dallas DA4
|
|
17.45 miles
|
Earthlink Dallas
|
|
17.45 miles
|
Atlantic Metro Dallas DFW2
|
|
18.21 miles
|
4101 Bryan Street
|
The 4101 Bryan data center has changed hands many times. First owned by Switch and Data. It was acquired in 2010 by Equinix. Equinix then sold the data center to 365 Data Centers. In June 2015, 365 Data Centers sold the facility to an unknown buyer.
|
18.40 miles
|
Atlantic Metro Dallas DFW1
|
|
18.40 miles
|
Infomart Dallas - Equinix Dallas - 1950 N Stemmons Fwy
|
The Infomart is the center of network Interconnection and Peering in Dallas. In fact, the Infomart is the nexus of the Interconnection marketplace for the entire South Central United States. The only other building with reasonable network density is Digital Realty's 2323 Bryant Street.
|
18.40 miles
|
Cologix DAL1, DAL2, DAL3
|
Cologix DAL1 (28,000 SF) & DAL2 (12,000 SF) are both located in the carrier dense Infomart.
|
18.40 miles
|
DataBank DFW5
|
|
18.40 miles
|
Lumen Dallas 2
|
|
18.40 miles
|
Flexential Dallas Infomart I-V
|
|
18.40 miles
|
Verizon Dallas (Infomart)
|
|
18.42 miles
|
XO: Infomart
|
|
18.47 miles
|
Equinix Dallas DA11
|
|
19.18 miles
|
HostPapa DFW1
|
|
19.18 miles
|
TierPoint Dallas (Colo4)
|
The site was formerly operated by Colo4 before being acquired by TierPoint in 2010
|
19.20 miles
|
QuadraNet Dallas
|
|
19.20 miles
|
Contegix Dallas
|
|
19.29 miles
|
CenturyLink Dallas (3180 Irving)
|
|