Archbald I LLC: Campus 1

Latest Podcast
Overlook Trail
Planned
Future facility in planning stage
Operated by: Archbald I LLC

Archbald I LLC: Campus 1

Lot Size: 410 acres

Sites on this Campus:

Archbald I LLC filed two zoning permit applications in October 2025 for the construction of two data center campuses. The larger campus (Campus 1) is planned for approximately 410 acres of land north of Staback Park on Eynon Jermyn Road and is proposed to contain 18 data center buildings. The smaller campus (Campus 2) would total around 66 acres. Across both campuses, a total of 22 buildings are planned, each measuring approximately 150,000 sq ft (13,935 sqm) of floorspace, for a combined total of 3.3 million sq ft (306,580 sqm). The identity of the company operating behind Archbald I LLC remains unclear.

Map and Nearby Locations:

Overlook Trail
Archbald I LLC Sites
Nearby Facilities

Sites within 15 miles of Archbald I LLC: Campus 1

Distance Site About
0.27 miles Archbald I LLC: Campus 1 Expansion
0.63 miles PDC Realty: Project Boson
Project Boson, formerly the Archbald Data & Energy Center, is set to transform the site of the former Highway Auto Parts auto salvage yard into a nearly 620,000-square-foot data center.
0.81 miles Project Gravity (Archbald)
Archbald 25 Developer LLC is the applicant for 'Project Gravity', a proposed data center campus in Archbald, northeast Pennsylvania, spanning just over 186 acres.
1.14 miles Wildcat Ridge Expansion
1.15 miles Archbald I LLC: Campus 2
Archbald I LLC filed two zoning permit applications in October 2025 for the construction of two data center campuses.
1.30 miles Wildcat Ridge AI DC Campus
The Wildcat Ridge AI Data Center Campus will be built on a 400-acre site along Business Route 6 and Wildcat Road, land that was previously designated for a major housing development.
2.17 miles Real Estate Data Center Request Dataset
The developers ultimately withdrew their application for a zoning change after being denied a chance to present revised plans publicly.
18.30 miles Gouldsboro Campus
1778 Rich Pike LLC plans to build up to 35 data center buildings over the next decade. Each building could be as large as 379,500 square feet, potentially bringing the total campus size to over 9 million square feet.
19.37 miles Gouldsboro Expansion

Archbald I LLC: Campus 1 Data Center Photos (See all)

Operating Company

Operated by: Archbald I LLC
3
Facilities
0
Markets

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?