|
0.06 miles
|
Valley UltraInterested in this information?Contact us
|
|
|
0.15 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.22 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.30 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.45 miles
|
MaxInterested in this information?Contact us
|
|
|
0.53 miles
|
StationInterested in this information?Contact us
|
|
|
0.55 miles
|
Ridge TwoInterested in this information?Contact us
|
|
|
0.60 miles
|
Edge StationInterested in this information?Contact us
|
|
|
0.66 miles
|
Prime RidgeInterested in this information?Contact us
|
|
|
0.75 miles
|
Campus AlphaInterested in this information?Contact us
|
|
|
0.79 miles
|
PrimeInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
0.82 miles
|
Point PlusInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
0.83 miles
|
Center PlusInterested in this information?Contact us
|
|
|
0.84 miles
|
Core CampusInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
0.93 miles
|
Station BetaInterested in this information?Contact us
|
|
|
1.66 miles
|
Metro StationInterested in this information?Contact us
|
|
|
1.79 miles
|
Hub MaxInterested in this information?Contact us
|
|
|
1.84 miles
|
Valley PrimeInterested in this information?Contact us
|
|
|
1.94 miles
|
Center BetaInterested in this information?Contact us
|
Construction started in 2012.
|
|
2.21 miles
|
Plaza GammaInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
2.29 miles
|
Plaza UltraInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.30 miles
|
Station MaxInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.36 miles
|
Ridge MaxInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
3.42 miles
|
Valley AlphaInterested in this information?Contact us
|
|
|
3.53 miles
|
CentralInterested in this information?Contact us
|
|
|
3.69 miles
|
Valley ThreeInterested in this information?Contact us
|
|
|
3.75 miles
|
CoreInterested in this information?Contact us
|
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
|
|
9.09 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.15 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.24 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.32 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon is developing a new campus for Morrow County, Oregon, located just southwest of the Tri-Cities.
|
|
11.84 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
11.93 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.04 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.14 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.69 miles
|
Edge TowerInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.73 miles
|
North ValleyInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.85 miles
|
Hub PrimeInterested in this information?Contact us
|
Amazon’s development in Morrow County, Oregon, encompasses a 1,300-acre site designated for large-scale digital infrastructure.
|
|
12.92 miles
|
East PointInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.99 miles
|
West PlazaInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
13.53 miles
|
West ParkInterested in this information?Contact us
|
|
|
13.56 miles
|
Central ParkInterested in this information?Contact us
|
|
|
13.63 miles
|
Central StationInterested in this information?Contact us
|
|
|
13.64 miles
|
RidgeInterested in this information?Contact us
|
|
|
13.89 miles
|
Rowan Percheron
|
Rowan plans to develop a 1.125 million sq ft (104,515 sqm) data center complex totaling four buildings. Construction is slated to begin in 2024
|
|
14.82 miles
|
Hub PrimeInterested in this information?Contact us
|
|
|
14.84 miles
|
Global CenterInterested in this information?Contact us
|
|
|
14.86 miles
|
WestInterested in this information?Contact us
|
|
|
14.89 miles
|
BetaInterested in this information?Contact us
|
|
|
16.68 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.72 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.77 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.79 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.12 miles
|
SouthInterested in this information?Contact us
|
|
|
17.13 miles
|
Plaza PrimeInterested in this information?Contact us
|
|
|
17.15 miles
|
Point PlusInterested in this information?Contact us
|
|
|
17.17 miles
|
West StationInterested in this information?Contact us
|
|
|
17.49 miles
|
Metro TowerInterested in this information?Contact us
|
|
|
17.49 miles
|
North StationInterested in this information?Contact us
|
|
|
17.55 miles
|
Park UltraInterested in this information?Contact us
|
|
|
17.55 miles
|
Station UltraInterested in this information?Contact us
|
|
|
17.62 miles
|
AlphaInterested in this information?Contact us
|
The site started construction in 2012.
|
|
17.73 miles
|
Campus MaxInterested in this information?Contact us
|
|
|
18.12 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
19.28 miles
|
Edge PointInterested in this information?Contact us
|
|
|
19.37 miles
|
EdgeInterested in this information?Contact us
|
|
|
19.42 miles
|
Core CenterInterested in this information?Contact us
|
|
|
19.51 miles
|
Point GammaInterested in this information?Contact us
|
|