Sabey: SDC Umatilla

Latest Podcast 31266 Wanapa Rd
Under ConstructionPlanned
Multi-phase construction project
Operated by:

Sabey: SDC Umatilla

Short Code: UMA-A
Site planned for 2028 and has expansions through 2031
PUE: 1.2
Utility Provider: UEC (Umatilla Electric Cooperative)

Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. Sabey broke ground on this $520 million development near the Columbia River, with initial capacity expected to come online in 2028.

Map and Nearby Locations

31266 Wanapa Rd
Sabey Data Centers Sites
Nearby Facilities

Sabey: SDC Umatilla Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Sabey: SDC Umatilla

Distance Site About
0.40 miles OneInterested in this information?Contact us
0.58 miles CampusInterested in this information?Contact us
The site started construction in 2012.
0.59 miles Center ThreeInterested in this information?Contact us
0.60 miles ThreeInterested in this information?Contact us
0.75 miles CoreInterested in this information?Contact us
0.77 miles SouthInterested in this information?Contact us
1.23 miles BetaInterested in this information?Contact us
1.32 miles East TowerInterested in this information?Contact us
1.38 miles Center MaxInterested in this information?Contact us
1.47 miles Prime ValleyInterested in this information?Contact us
3.25 miles Tower PrimeInterested in this information?Contact us
3.29 miles Park PrimeInterested in this information?Contact us
3.32 miles EdgeInterested in this information?Contact us
3.35 miles Point MaxInterested in this information?Contact us
4.82 miles PrimeInterested in this information?Contact us
4.89 miles PlazaInterested in this information?Contact us
4.93 miles Hub BetaInterested in this information?Contact us
5.01 miles Center ThreeInterested in this information?Contact us
7.65 miles NorthInterested in this information?Contact us
7.72 miles Hyperscale Data CenterInterested in this information?Contact us
7.72 miles MetroInterested in this information?Contact us
7.73 miles Hyperscale Data CenterInterested in this information?Contact us
7.79 miles Campus PrimeInterested in this information?Contact us
7.89 miles West CampusInterested in this information?Contact us
7.93 miles Hyperscale Data CenterInterested in this information?Contact us
7.95 miles Hyperscale Data CenterInterested in this information?Contact us
9.87 miles South CenterInterested in this information?Contact us
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
9.94 miles West RidgeInterested in this information?Contact us
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
10.00 miles PointInterested in this information?Contact us
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
10.07 miles Tower ProInterested in this information?Contact us
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
17.43 miles Campus BetaInterested in this information?Contact us
17.44 miles Station PrimeInterested in this information?Contact us
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
17.45 miles OneInterested in this information?Contact us
17.46 miles UltraInterested in this information?Contact us
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
17.47 miles Point UltraInterested in this information?Contact us
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
17.55 miles PrimeInterested in this information?Contact us
17.59 miles Station UltraInterested in this information?Contact us
17.72 miles Ridge BetaInterested in this information?Contact us
17.95 miles Ridge UltraInterested in this information?Contact us
17.97 miles West CenterInterested in this information?Contact us
18.03 miles Hyperscale Data CenterInterested in this information?Contact us
18.05 miles Hyperscale Data CenterInterested in this information?Contact us
18.07 miles Hyperscale Data CenterInterested in this information?Contact us
18.10 miles AlphaInterested in this information?Contact us
18.12 miles Hyperscale Data CenterInterested in this information?Contact us
18.51 miles PrimeInterested in this information?Contact us
18.54 miles Park TwoInterested in this information?Contact us
18.63 miles EdgeInterested in this information?Contact us
19.36 miles CenterInterested in this information?Contact us
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
19.39 miles North CampusInterested in this information?Contact us
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
19.59 miles Valley BetaInterested in this information?Contact us
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
19.62 miles MaxInterested in this information?Contact us
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
19.77 miles West RidgeInterested in this information?Contact us
19.90 miles Valley PlusInterested in this information?Contact us
19.94 miles Ridge PlusInterested in this information?Contact us

Sabey: SDC Umatilla Data Center Photos See all

Large Content Company Data Centers in Rural Oregon
Source: Dan Aguayo - The Oregonian

Operating Company

Operated by:

Sabey Data Centers is one of the largest privately owned multi-tenant data center owner/developer/operators in the world. Being privately-owned may mean that ours is never a household name, but to us, it means a complete focus on building value by serving one customer at a time.

Sabey Data Centers grew out of Sabey Corporation’s forty plus year history as a designer, builder and operator for leading innovators of the day: Boeing Electronics’ clean rooms, McCaw Cellular’s first cell phone switches, and Exodus Communications, provider of the world’s first internet colocation services — all were breaking new ground in industries of world-wide importance.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Oregon Pauses State Land Sales For Data Center Projects Through July 2027
Oregon Governor Tina Kotek has ordered state agencies to pause land transactions for new data center projects. The freeze covers unapproved easements, leases, land-use permits, property sales, and ...

Oregon Pauses State Land Sales For Data Center Projects Through July 2027

September 11, 2026 Oregon

Oregon Governor Tina Kotek has ordered state agencies to pause land transactions for new data center projects. The freeze covers unapproved easements, leases, land-use permits, property sales, and other state land agreements for data centers. It will remain in place through July 1, 2027, unless...

Read more
Read Oregon Governor Halts Data Center Project And Blocks Land Sale Approval.
Oregon Governor Blocks Data Center Development Near Portland. Governor Tina Kotek has halted plans for a data center project outside Portland by directing the state to cancel its land sale agreemen...

Oregon Governor Halts Data Center Project And Blocks Land Sale Approval.

August 04, 2026 Oregon

Oregon Governor Blocks Data Center Development Near Portland. Governor Tina Kotek has halted plans for a data center project outside Portland by directing the state to cancel its land sale agreement with developer Verrus. The state had planned to sell about 32 acres at Salem’s Mill Creek...

Read more
Read Sabey Breaks Ground on 120MW Data Center Campus in Oregon
Sabey is starting vertical construction of a new data center in Oregon. Sabey Data Centers this week announced that the company was “going vertical” at its SDC Umatilla campus.

“Watching the fir...

Sabey Breaks Ground on 120MW Data Center Campus in Oregon

July 23, 2026 Oregon

Sabey is starting vertical construction of a new data center in Oregon. Sabey Data Centers this week announced that the company was “going vertical” at its SDC Umatilla campus. “Watching the first steel go up is always a significant moment because it turns years of planning, engineering and hard...

Read more
Read Sabey DC Acquires Land for Data Center in Butte, Montana
Sabey DC Acquires Land for Data Center in Butte, Montana

Sabey DC Acquires Land for Data Center in Butte, Montana

October 24, 2025 Sabey Data Centers

A data center could be coming to Butte, Montana and Sabey Data Centers, a US-based data center developer, is the company behind the acquisition of a 600-acre parcel of land in the city. The acquisition was made for an estimated $1.2 million and is located in the county’s Montana Connections...

Read more
Read Sabey Data Centers names Tim Mirick as president
Sabey Data Centers names Tim Mirick as president

Sabey Data Centers names Tim Mirick as president

January 20, 2025 Sabey Data Centers

Sabey has appointed a new president for its data centers business, naming Tim Mirick as a replacement for the outgoing presodent Rob Rockwood, who stepped down from his role at the end of December. Mirick, who has served as chief revenue officer since 2012, joined Sabey in 2012. He previously...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?