0.09 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.16 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.24 miles
|
Valley MaxInterested in this information?Contact us
|
|
|
0.30 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.49 miles
|
ParkInterested in this information?Contact us
|
|
|
0.51 miles
|
Metro PlazaInterested in this information?Contact us
|
|
|
0.58 miles
|
GammaInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
0.61 miles
|
South ValleyInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
0.61 miles
|
Tower OneInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
0.62 miles
|
Core RidgeInterested in this information?Contact us
|
|
|
0.69 miles
|
CloudInterested in this information?Contact us
|
|
|
0.80 miles
|
Prime HubInterested in this information?Contact us
|
|
|
0.81 miles
|
South PointInterested in this information?Contact us
|
|
|
0.91 miles
|
Plaza GammaInterested in this information?Contact us
|
|
|
0.96 miles
|
Core RidgeInterested in this information?Contact us
|
|
|
1.82 miles
|
PlazaInterested in this information?Contact us
|
|
|
1.93 miles
|
AlphaInterested in this information?Contact us
|
|
|
1.99 miles
|
Valley ThreeInterested in this information?Contact us
|
|
|
2.06 miles
|
PrimeInterested in this information?Contact us
|
Construction started in 2012.
|
|
2.50 miles
|
Core PlazaInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
2.57 miles
|
Cloud PointInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.59 miles
|
Hub UltraInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
2.65 miles
|
West CenterInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
3.52 miles
|
ParkInterested in this information?Contact us
|
|
|
3.63 miles
|
CoreInterested in this information?Contact us
|
|
|
3.79 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
3.85 miles
|
Central HubInterested in this information?Contact us
|
Amazon's Olson Rd Campus is located at 79386 Olson Rd. The site was built on 75 acres with a dedicated substation for 5 acres . The campus consists of four buildings measuring 206,000 sq ft each.
|
|
9.20 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.26 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.34 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
This facility is part of Amazon's Tower Road East Campus in Boardman, Oregon.
|
|
9.43 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
Amazon is developing a new campus for Morrow County, Oregon, located just southwest of the Tri-Cities.
|
|
11.93 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.02 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.13 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.22 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
12.77 miles
|
Cloud ValleyInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.81 miles
|
AlphaInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
12.92 miles
|
Ridge ProInterested in this information?Contact us
|
Amazon’s development in Morrow County, Oregon, encompasses a 1,300-acre site designated for large-scale digital infrastructure.
|
|
12.99 miles
|
GammaInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
13.07 miles
|
Station ThreeInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
13.48 miles
|
Center PrimeInterested in this information?Contact us
|
|
|
13.51 miles
|
Valley PrimeInterested in this information?Contact us
|
|
|
13.58 miles
|
Edge CampusInterested in this information?Contact us
|
|
|
13.59 miles
|
Tower PrimeInterested in this information?Contact us
|
|
|
14.11 miles
|
Rowan Percheron
|
Rowan plans to develop a 1.125 million sq ft (104,515 sqm) data center complex totaling four buildings. Construction is slated to begin in 2024
|
|
14.75 miles
|
EastInterested in this information?Contact us
|
|
|
14.76 miles
|
Plaza PrimeInterested in this information?Contact us
|
|
|
14.78 miles
|
Campus PlusInterested in this information?Contact us
|
|
|
14.80 miles
|
Cloud CampusInterested in this information?Contact us
|
|
|
16.72 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.77 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.81 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.84 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.17 miles
|
Point AlphaInterested in this information?Contact us
|
|
|
17.18 miles
|
Valley PrimeInterested in this information?Contact us
|
|
|
17.19 miles
|
Prime RidgeInterested in this information?Contact us
|
|
|
17.21 miles
|
WestInterested in this information?Contact us
|
|
|
17.41 miles
|
BetaInterested in this information?Contact us
|
|
|
17.41 miles
|
Hub ProInterested in this information?Contact us
|
|
|
17.46 miles
|
PointInterested in this information?Contact us
|
|
|
17.47 miles
|
ValleyInterested in this information?Contact us
|
|
|
17.53 miles
|
Ridge OneInterested in this information?Contact us
|
The site started construction in 2012.
|
|
17.64 miles
|
TwoInterested in this information?Contact us
|
|
|
18.03 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
19.20 miles
|
Station MaxInterested in this information?Contact us
|
|
|
19.28 miles
|
Plaza GammaInterested in this information?Contact us
|
|
|
19.33 miles
|
Edge ValleyInterested in this information?Contact us
|
|
|
19.43 miles
|
Edge PointInterested in this information?Contact us
|
|