Scranton (Northeast Pennsylvania) Data Center Market

Latest Podcast
Northeast Pennsylvania around Scranton and Wilkes-Barre has become one of the busiest data-center filing grounds in PJM. Developers come for reclaimed coal land, PPL transmission, nuclear and gas power, and access to the New York market. Township approvals, court appeals and grid upgrades decide which campuses get built. Read More

Market Facts

Scranton (Northeast Pennsylvania) Data Center Map

Scranton (Northeast Pennsylvania) Power Growth Over Time

+8500% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Largest Providers in Scranton (Northeast Pennsylvania)

Amazon AWS
Site
Power
Operational
1
50.0
Construction
1
Planned
2
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
2
View Provider
Nebius
Site
Power
Operational
0
0.0
Construction
1
Planned
1
Prospective Expansion
1
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
1
View Provider
Soltier LLC
Site
Power
Operational
1
2.0
Construction
0
Planned
0
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
1
Decommissioned
0
Totals
1
View Provider
Corscale
Site
Power
Operational
0
0.0
Construction
0
Planned
1
Prospective Expansion
0
Land Bank
0
In Doubt
0
Withdrawn
0
Decommissioned
0
Totals
0
View Provider

Largest Data Centers in Scranton (Northeast Pennsylvania)

Location About Total SqFt Power (MW)
Metro CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us NN Request Dataset
Solteir: Towanda, PA
Soltier LLC's small crypto mining site on Sullivan Street in Wysox Township, Bradford County, who...
NN Request Dataset
Keel Infrastructure: Panther Creek Mining
Keel Infrastructure's former Bitcoin mining operation at the Panther Creek waste-coal power plant...
Talen: Nautilus Cryptomine
A former bitcoin mining facility on the Susquehanna nuclear campus near Berwick that Talen Energy...
Project Hazelnut
NorthPoint Development's planned 15-building data center campus in Hazle Township's Humboldt Nort...

About Scranton (Northeast Pennsylvania)

Overview

Baxtel's Scranton (Northeast Pennsylvania) region covers the anthracite coal region and the Poconos. It includes Lackawanna, Luzerne, Schuylkill, Carbon, Monroe and Wayne counties, plus the northern tier. The region sits inside the Pennsylvania market and has almost no older colocation. Its story is gigawatt campuses on former mine land and beside power plants.

History

Anthracite mining shaped the region's land and its power grid for more than a century. The mines left large reclaimed tracts near transmission lines. Waste-coal plants still burn the old culm banks. Stronghold Digital mined bitcoin at its Panther Creek waste-coal plant in Carbon County from 2022.

The large-campus era began at the Susquehanna nuclear plant. Talen Energy opened its Cumulus data center beside the plant in early 2023. In March 2024 Talen sold the campus to Amazon Web Services (AWS) for $650 million. Amazon later won land-development approval for a second campus in Kline Township, Schuylkill County.

Developers then filed for campuses across the Lackawanna Valley. Archbald alone drew six campuses from five developers by late 2026. Bitfarms bought Stronghold in March 2025. The company, now Keel Infrastructure, ended mining in June 2026 to pursue AI hosting.

The Market Today

The Lackawanna Valley northeast of Scranton holds the densest cluster. Corscale owns the land for Project Gravity in Archbald. Provident, DBT Data, Catalyst and others have filed nearby. Archbald's council denied two campuses in 2026, and the first denial is under appeal.

To the south, Amazon is building out the Susquehanna nuclear campus. Nebius has started the first phase of its Highridge AI campus in Schuylkill County. NorthPoint's Project Hazelnut near Hazleton sits in Commonwealth Court after the township denied its plan. Keel plans an AI campus at its Panther Creek site.

The Poconos carry fewer, larger tracts. Developers proposed campuses near Gouldsboro and in Smithfield Township.

Advantages

  • Reclaimed land. Former mine and quarry tracts offer hundreds of acres near transmission lines.
  • Nuclear and gas power. The Susquehanna nuclear plant and Marcellus Shale gas fields sit inside the region.
  • Location. Scranton sits about 120 miles from New York City, on Interstates 81 and 84.
  • Tax treatment. Qualifying data-center equipment is exempt from state sales and use tax.

Challenges

  • Local approvals. Townships denied campuses in Archbald and Hazle Township, and residents sued over Archbald's data-center overlay ordinance.
  • Grid access. PPL Electric Utilities reported 31.8 GW of advanced-stage data-center requests in August 2026. That total far exceeds what its system can serve soon.
  • Large-load tariff. The Pennsylvania Public Utility Commission (PUC) set a model tariff in May 2026 for loads above 50 MW. It guides utilities to require collateral, minimum bills and upfront payment for grid upgrades.
  • Mine subsidence. Old anthracite workings lie under parts of the valley, which adds study cost for heavy buildings.

Trends

  • Gigawatt filings. Developers file for far more power than PPL can deliver soon, and several sites changed hands before groundbreaking.
  • Crypto to AI. Waste-coal miners such as Keel shifted from bitcoin to AI hosting in 2026.
  • Nuclear-adjacent campuses. Amazon's Susquehanna campus set the pattern of building beside a nuclear plant.
  • Courts as the gate. Approvals now turn on appeals as much as on power.

Power and Policy

PJM Interconnection runs the grid. PPL Electric Utilities serves most of the region, and UGI Utilities serves parts of Luzerne County. FirstEnergy Pennsylvania serves Monroe County and parts of the northern tier. The PUC regulates these utilities, and its May 2026 large-load order guides their tariffs for big loads. The Department of Environmental Protection (DEP) issues air permits for backup generators.

Get Quotes

Related News See all

Read Arrests Follow Threats To Olyphant Council Over $101M Data Center Deal
Police in Olyphant, Pennsylvania, have arrested suspects over threats to borough council members after the council approved a $101 million data center settlement. Olyphant police say council member...

Arrests Follow Threats To Olyphant Council Over $101M Data Center Deal

November 26, 2026 Scranton (Northeast Pennsylvania)

Police in Olyphant, Pennsylvania, have arrested suspects over threats to borough council members after the council approved a $101 million data center settlement. Olyphant police say council members were threatened in person and on social media. The threats followed the council's 5-2 vote on...

Read more
Read Blue Owl Digital Infrastructure Trust Buys 54MW Gainesville Data Center
Blue Owl Digital Infrastructure Trust closed the purchase of a 54MW data center in Gainesville, Virginia, for $779.5 million, [an SEC filing](https://www.sec.gov/Archives/edgar/data/2069692/0002069...

Blue Owl Digital Infrastructure Trust Buys 54MW Gainesville Data Center

November 23, 2026 Corscale

Blue Owl Digital Infrastructure Trust closed the purchase of a 54MW data center in Gainesville, Virginia, for $779.5 million, an SEC filing shows. The trust's subsidiary NVA11C LLC bought the membership interests in GCDC Purchaser Phase 3 LLC, which holds title to the building, from US GCDC...

Read more
Read Nebius Expands Israel Data Center Lease With Mega Or by 134MW
[Nebius](https://baxtel.com/data-centers/nebius) will lease another 134MW of IT capacity in [Israel](https://baxtel.com/regions/israel) from Mega Or's Mega DC subsidiary, the third capacity agreeme...

Nebius Expands Israel Data Center Lease With Mega Or by 134MW

November 20, 2026 Nebius

Nebius will lease another 134MW of IT capacity in Israel from Mega Or's Mega DC subsidiary, the third capacity agreement between the two companies. Mega Or announced the deal on Nov. 19, as CTech reported. Both facilities are due for completion by the end of the second quarter of 2028. Mega...

Read more
Read AMD Named Tenant for 5C's 160MW Project Phoenix Data Center
AMD is the intended end user of a proposed data center in Mount Carmel Township, [Pennsylvania](https://baxtel.com/regions/pennsylvania), under an executed lease agreement. The conditional use appl...

AMD Named Tenant for 5C's 160MW Project Phoenix Data Center

November 20, 2026 5C Data Centers

AMD is the intended end user of a proposed data center in Mount Carmel Township, Pennsylvania, under an executed lease agreement. The conditional use application on file with the township lists AMD as the tenant of the first building, The News-Item reported. The project, called Project Phoenix,...

Read more
Read Blackstone Digital Infrastructure Trust Buys 75% of AWS Joint Ventures for $5B
[Blackstone Digital Infrastructure Trust](https://www.sec.gov/Archives/edgar/data/2100161/000119312526461954/d115778dex991.htm) has agreed to buy a majority stake in two Amazon Web Services data ce...

Blackstone Digital Infrastructure Trust Buys 75% of AWS Joint Ventures for $5B

November 17, 2026 Amazon AWS

Blackstone Digital Infrastructure Trust has agreed to buy a majority stake in two Amazon Web Services data center joint ventures for about $5 billion. The trust takes a 75% interest in the ventures, which own 13 newly constructed powered shells, and Amazon Web Services keeps the remaining 25%....

Read more
Read AWS Breaks Ground on $7 Billion Project Rise Campus in Indiana
Amazon Web Services has begun construction on its $7 billion Project Rise data center campus in Wheatfield, Indiana ([Times of Northwest Indiana](https://nwitimes.com/news/local/collection_3ea669e7...

AWS Breaks Ground on $7 Billion Project Rise Campus in Indiana

November 16, 2026 Amazon AWS

Amazon Web Services has begun construction on its $7 billion Project Rise data center campus in Wheatfield, Indiana (Times of Northwest Indiana). Jasper County planners cleared the project in June (Rensselaer Republican). Amazon Web Services is spending a combined $33 billion on Indiana data...

Read more

Related Podcasts See all

E11: Building India’s Digital Backbone with Sharad Agarwal

Executive Summary In this episode recorded live at PTC 26, Eric Bell speaks with Sharad Agarwal, ...

E10 - AI Cooling And Data Centers With Cliff Federspiel

In this episode, we sit down with Cliff Federspiel, President and CTO of Vigilent, to explore how...

E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins

In this Baxtel Podcast episode, Eric Bell sits down with Wes Cummins, CEO of Applied Digital, to ...

E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load

In this episode, Eric Bell sits down with Russell Fletcher to unpack what it really means to oper...

E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse

Nick Kruse is a chemical engineer turned energy entrepreneur who sits at the nexus of power and c...

E5: Mark Jobson on Data Center Strategy, Marketing, and IPOs

In this episode of Baxtel’s Meet Me Room podcast, we sit down with global marketing executive Mar...
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.