The data center is sandwiched between Tierpoint and Cisco Systems data centers
Energy Labs Hybrid Systems utilize a perimeter base frame constructed of Structural Steel to insure minimum deflection
The data center was acquired in April 2016
The buildings and next to each other
From Left to Right: Laramie Dorris, VP Design & Construction, Kellie Teal-Guess, CPO (Chief People Officer), Gary Caplinger, Allen Mayor Pro Tem Baine Brooks, Allen City Council Member John Hatem, EVP, Operations, Design & Construction, Allen Mayor Stephen Terrell, Robert Jackson, General Counsel, Peter Vargas, City Manager Dan Bowman, Executive Director/CEO, AEDC Danny Cowser, Director, Construction & Design
The building features 30,000 square feet of customer office space, a modern cafeteria, a gym area with workout machines, and unique recreation space featuring a climbing wall, circular slide and a putting green.