Centuria: Clayton 1
CIP acquired the Telstra data centre campus in Clayton, Melbourne, in 2020 through a sale leaseback for about A$417 million.
CIP acquired the Telstra data centre campus in Clayton, Melbourne, in 2020 through a sale leaseback for about A$417 million.
Centuria Industrial REIT acquired the Fujitsu-occupied data centre at 16 Mulgul Road, Malaga, Perth, in July 2024 for A$39 million.
Centuria Industrial REIT acquired the warehouse site at 1 Hardie Road and 2-8 Cawley Road, Yarraville, in late 2025 for A$30.2 million.
Thomastown and Keon Park is CIP’s largest data centre conversion site, a 10.6 hectare industrial holding about 17 km north of Melbourne’s CBD and less than 100 metres from the Thomastown terminal station.
Hazelmere is an existing CIP industrial holding in Perth’s east, a six hectare manufacturing site leased until late 2027. CIP has submitted a power application and the land sits about two kilometres from Guildford Terminal Station.
Centuria Industrial REIT is planning to build a high-capacity, AI-ready facility at its industrial campus in Melbourne's southeast.
CIP acquired the Wellcamp Data Centre in Toowoomba in January 2026 for A$30 million from Pulse Properties.