The eight-storey, 155,000-square foot standalone facility, strategically located in Paya Lebar, was built to Tier III criteria and received certification of the design documents by Uptime Institute on 4 December 2013.
The eight-storey, 155,000-square foot standalone facility, strategically located in Paya Lebar, was built to Tier III criteria and received certification of the design documents by Uptime Institute on 4 December 2013.
The CGK3A colocation data center is located in the TB Simatupang area of South Jakarta, spanning 14,127 sqm (152,000 sq ft), with a total investment value of $150 million.
The CGK4 campus is Indonesia’s first renewable-powered AI data center park.