TierPoint Tulsa

Latest Podcast
322 E. Archer St.
Operational
Fully operational facility
Operated by:

TierPoint Tulsa

Short Code: TUL
░░░░░░ Login to view SqFt
Total Building Size
░░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

Power:


  • Grid Power—6000 amps—electronic switching gear
  • UPS: N+1 540kw capacity
  • Generators – (2) 1000 kW
  • 4,000 gallon extended life fuel tank
  • DC Power Plant

Network Providers:


  • AT&T
  • Bolt Fiber Optics
  • BTC
  • Century Link (Qwest)
  • Chickasaw Telecom
  • Cogent
  • Cox
  • Earthlink
  • Fidelity Communications
  • K-Powernet
  • Level (3)
  • Logix
  • MBO
  • NewNet66
  • OneNet
  • TW Telecom
  • Verizon
  • Vyve Broadband
  • Windstream

Map and Nearby Locations:

322 E. Archer St.
TierPoint Sites
Nearby Facilities

Sites within 15 miles of TierPoint Tulsa

Distance Site About
0.24 miles Lumen Tulsa 1
0.37 miles OCOSA 321 S Boston
0.37 miles TulsaConnect DC1
All access to the facility is via TulsaConnect escort Cross-connects for analog phone service (POTS), T-1, DS-3, etc available to every rack at no additional charge SSAE 16 audited facilities
0.37 miles OneNet OSC
0.70 miles Prescott Realty Group-110 West 7th
0.71 miles TulsaConnect DC2
SSAE 16 audited facility Biometric access control system at facility entrances DC1 is on a different power grid than DC2
8.46 miles HP Cherokee Data Center (Tulsa)
In 2009, EDS expanded the data center to 404,000 square feet with four data halls that each have 40,000 sqft of floor space.
8.69 miles Hyperscale Data Center Request Dataset
8.85 miles Project Clydesdale Expansion
9.00 miles Project Clydesdale
Blue Owl-backed data center developer Beale Infrastructure has broken ground on a new campus outside Tulsa, Oklahoma.
9.01 miles Hyperscale Data Center Request Dataset
This facility is part of Google's "Project Spring" near downtown Tulsa.
9.32 miles Hyperscale Data Center Request Dataset
In February 2026, the Sand Springs City Council approved the rezoning for "Project Spring," a Google-backed data center campus located just eight miles west of downtown Tulsa.
9.36 miles TierPoint Tulsa-State Farm
9.36 miles Compass Tulsa
9.37 miles TulsaConnect DC3
Campus has true dual-substation electrical feeds with automatic switchgear to switch between substations True "A" and "B" UPS configuration via reliable Eaton 9395 and Powerware 9315 systems with fully independent output feeds to customer equipment with no common/shared points of failure
14.04 miles Project Anthem
A 340-acre data center project known as Project Anthem at the intersection of 11th Street and the west side of the Creek Turnpike is being proposed in Tulsa, Oklahoma. Construction on the $800 million site is set to take three years.

TierPoint Tulsa Data Center Photos (See all)

Tulsa Ribbon Cutting Ceremony in March 2018
Source: TierPoint Twitter
The data center constructed by Compass and launched in March 2018
Rendering of TierPoint's Tulsa Site
Source: TierPoint

The data center constructed by Compass and launched in March 2018

Operating Company

Operated by:

TierPoint is a data center and managed services provider that focuses on secondary markets in the United States. Operating as a private-equity backed company, As detailed in the history section below, Tierpoint has actively acquired smaller providers and impressively rolled up a national platform in 20 markets.

Tierpoint Acquisitions and History


TierPoint was formed in 2010 as Cequel Data Centers LLC, however, the company's origins date back to 1995. Through a conglomeration of acquisitions, TierPoint built its data center portfolio. [r1]

2010:

  • Cequel acquired Colo4 (Based in Dallas and originally founded in 2000)

2011

  • Cequel acquired Perimeter Technology (Based in Oklahoma and founded in 2003)

2012

  • Cequel acquired TierPoint (Based in Spokane and founded in 2003). After the acquisition, Cequel was rebranded as Tierpoint
  • 2012 Adhost acquired (Based in Seattle and founded in 1995)
  • 2012 DBSi acquired [r2]

2013

  • Baltimore Technology Park acquired (Based in Baltimore and founded in 2005)

2014

  • TierPoint Management team recapitalized the company
  • Philadelphia Technology Park. Located in the Philadelphia Navy Yard the 25,700 sqft Philadelphia Technology Park first opened in 2010
  • Xand (founded in 1999)

2015

  • Acquired CxP Data Centers that added a 121,000sqft Jacksonville facility [r3]
  • TierPoint Acquires AlteredScale Data Center in Chicago
  • Acquired Windstream for $575 million. The transaction added 20 datacenters, mainly in the East, Midwest, and South, which fit nicely with TierPoint's western-leaning portfolio. Windstream was itself a data center roll-up of sorts. In 2010 Windstream acquired PAETEC and Hosted Solutions in 2010.

2016

  • Cosentury was acquired by Tierpoint in January 2016 for $575 million. Cosentury, was founded in 2001 and was headquartered in Omaha, NE. It provided Colocation, IaaS, and Compliance and Security services. Cosentury was a large company to swallow. It had nine data centers in the Midwest US and 220 emploiyees.

Tierpoint Services

Data center colocation is the prime product, but Tierpoint also offers Cloud, Managed Services, and DIA with DDoS protection.

TierPoint's customer portal allows for self-provisioning of resources (such as VMs and storage) and a dashboard that allows customers to remotely monitor workloads and applications across all locations. The company offers a comprehensive solution portfolio of private, multitenant, hyperscale, and hybrid cloud, plus colocation, disaster recovery, security and other managed IT services.

References:


r1. TierPoint Company Page
r2. Source: Data Center Knowledge
r3. Press Release Archive. July 27, 2015

44
Facilities
18
Markets
129MW
Megawatts

News (See all)

Read More News

Podcasts (See all)

See More Podcasts

Documents (See all)

Ready to Level up Your
Data Center Strategy?