TierPoint Omaha Midlands

Latest Podcast 11425 South 84th Street
Operational
Fully operational facility
Operated by:

TierPoint Omaha Midlands

Short Code: MID
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
░░░░░░ Login to view SqFt
Gross Colocation Size

The site was acquired when TierPoint bought Cosentury in January 2016.

Building:


  • Purpose-built data center, single-tenant, single-use structure
  • Outside of 500 year flood plain
  • Dedicated spaces for electrical equipment, mechanical corridors, data halls, carriers/telecom, equipment storage, staging and loading docks
  • 24/7 onsite staff and remote monitoring from geographically disperse Operations Centers
  • LEED Gold Certified, Energy Star Certified
  • Guest office, conference room and break room areas

Power:


  • 20kW per cabinet capacity
  • 2 substations, two 14MW below ground feeds
  • N+1 diesel generators with over 24 hours of runtime
  • N+1 UPS per data suite behind N+1 static switch PDUs
  • Redundant (A+B) power distribution to each cabinet
  • Power metering and utilization reporting by circuit, cabinet and room

HVAC:


  • N+1 continuous precision cooling systems with dual path water system
  • Dual electrical feeds to each air handler
  • N+1 high-efficiency chillers
  • Heat exchanger with cross-flow cooling towers and dedicated pumps
  • Hot/cold aisle alignment with containment options available
  • 3’ raised access floor for cold air supply
  • Ceiling plenum for ducted hot air return
  • Set points maintain ASHRAE standards for data centers
  • CRAC system and environmental monitoring for temperature, humidity, dew point, airflow, smoke and leaks

Map and Nearby Locations

11425 South 84th Street
TierPoint Sites
Nearby Facilities

Sites within 15 miles of TierPoint Omaha Midlands

Distance Site About
1.38 miles Adobe Nebraska
1.88 miles Lightedge Omaha
LightEdge acquired the facility form Cabela's in September 2017
3.17 miles Fidelity Omaha West DC
3.94 miles H5: Omaha, NE
H5 has acquired a 234,500 sq ft (21,785 sqm) facility in La Vista, Omaha, previously owned by Yahoo!.
5.17 miles Campus ProInterested in this information?Contact us
5.46 miles NorthInterested in this information?Contact us
5.59 miles Edge ValleyInterested in this information?Contact us
5.64 miles CoreInterested in this information?Contact us
The original plan called for 900,000 sqft data center space and a 70,000 office space. Facebook has since announced an expansion that will bring the complex to 2.6 million square feet. The first data center comes online in 2019.
5.85 miles Ridge ProInterested in this information?Contact us
This data center is a part of Google's Papillion Campus in Nebraska.
6.09 miles Point ThreeInterested in this information?Contact us
This data center is a part of Google's Papillion Campus in Nebraska.
6.48 miles Connect Data Centers: Papillion, NE
US investment firm Oppidan is planning to build a single-story, 61,550 sqft data center in Papillion, Nebraska. Oppidan lists Connect Data Centers as a subsidiary.
6.66 miles TierPoint Omaha-Bellevue
Nearly 100,000 SqFt of space in a reinforced concrete block and brick building Expansion capable up to 400,000 SqFt
7.63 miles Lumen Omaha
7.63 miles Scott Data Center Omaha
7.86 miles LoCoCoLo Omaha
9.89 miles CyrusOne Council Bluffs
9.99 miles 1623 Farnam: Omaha Carrier Hotel
This is Omaha's interconnect point.
10.14 miles First National Technology Solutions
10.86 miles East CenterInterested in this information?Contact us
12.41 miles PrimeInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
12.58 miles South ValleyInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
12.59 miles Campus OneInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
12.60 miles Tower PlusInterested in this information?Contact us
13.12 miles Prime RidgeInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
13.21 miles MetroInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
13.30 miles ParkInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
14.33 miles Global TowerInterested in this information?Contact us
Google's Omaha data center campus on Blair High Road encompasses approximately four data center buildings, totaling about 1,432,280 gross square feet in floor area.
14.55 miles Hub AlphaInterested in this information?Contact us
This data center is a part of Google's Omaha Campus.
14.61 miles Prime TowerInterested in this information?Contact us
This data center is a part of Google's Omaha Campus.
14.82 miles Edge ParkInterested in this information?Contact us
This data center is a part of Google's Omaha Campus.
16.07 miles Edged Energy: Council 2
The facility will be part of Edged Energy's Council Bluffs Campus In Iowa.
16.30 miles Edged Energy: Council Bluffs Campus
US data center firm Edged has revised its plans for the Council Bluffs, Iowa data center campus, reducing building height and footprint.

TierPoint Omaha Midlands Data Center Photos See all

Satellite View of Midlands Facility in Papillion
Source: Google Maps
circa 2014
Midlands Data Center
Source: Baxtel

circa 2014

Operating Company

Operated by:

TierPoint is a data center and managed services provider that focuses on secondary markets in the United States. Operating as a private-equity backed company, As detailed in the history section below, Tierpoint has actively acquired smaller providers and impressively rolled up a national platform in 20 markets.

Tierpoint Acquisitions and History


TierPoint was formed in 2010 as Cequel Data Centers LLC, however, the company's origins date back to 1995. Through a conglomeration of acquisitions, TierPoint built its data center portfolio. [r1]

2010:

  • Cequel acquired Colo4 (Based in Dallas and originally founded in 2000)

2011

  • Cequel acquired Perimeter Technology (Based in Oklahoma and founded in 2003)

2012

  • Cequel acquired TierPoint (Based in Spokane and founded in 2003). After the acquisition, Cequel was rebranded as Tierpoint
  • 2012 Adhost acquired (Based in Seattle and founded in 1995)
  • 2012 DBSi acquired [r2]

2013

  • Baltimore Technology Park acquired (Based in Baltimore and founded in 2005)

2014

  • TierPoint Management team recapitalized the company
  • Philadelphia Technology Park. Located in the Philadelphia Navy Yard the 25,700 sqft Philadelphia Technology Park first opened in 2010
  • Xand (founded in 1999)

2015

  • Acquired CxP Data Centers that added a 121,000sqft Jacksonville facility [r3]
  • TierPoint Acquires AlteredScale Data Center in Chicago
  • Acquired Windstream for $575 million. The transaction added 20 datacenters, mainly in the East, Midwest, and South, which fit nicely with TierPoint's western-leaning portfolio. Windstream was itself a data center roll-up of sorts. In 2010 Windstream acquired PAETEC and Hosted Solutions in 2010.

2016

  • Cosentury was acquired by Tierpoint in January 2016 for $575 million. Cosentury, was founded in 2001 and was headquartered in Omaha, NE. It provided Colocation, IaaS, and Compliance and Security services. Cosentury was a large company to swallow. It had nine data centers in the Midwest US and 220 emploiyees.

Tierpoint Services

Data center colocation is the prime product, but Tierpoint also offers Cloud, Managed Services, and DIA with DDoS protection.

TierPoint's customer portal allows for self-provisioning of resources (such as VMs and storage) and a dashboard that allows customers to remotely monitor workloads and applications across all locations. The company offers a comprehensive solution portfolio of private, multitenant, hyperscale, and hybrid cloud, plus colocation, disaster recovery, security and other managed IT services.

References:


r1. TierPoint Company Page
r2. Source: Data Center Knowledge
r3. Press Release Archive. July 27, 2015

44
Facilities
23
Markets
129MW
Megawatts

News See all

Read Apollo Global Management is acquiring Argo Infrastructure Partners.
Apollo Global Management is acquiring Argo Infrastructure Partners.

Apollo Global Management is acquiring Argo Infrastructure Partners.

January 20, 2025 TierPoint

Investment giant Apollo Global Management is acquiring Argo Infrastructure Partners in a deal that will add approximately $6 billion of assets to the Apollo infrastructure platform. Argo is the majority owner of US data center firm TierPoint, which operates around 40 facilities across 18 US...

Read more
Read TierPoint aims to raise $925 million through securitized loans
TierPoint aims to raise $925 million through securitized loans

TierPoint aims to raise $925 million through securitized loans

June 29, 2023 TierPoint

TierPoint seeks to raise $925 million by selling A-rated data center revenue notes from Kroll Bond Rating Agency. The exchange is TierPoint's first and is backed by 31 colocation data centers with approximately $397.2 million in annualized monthly frequent revenue and $198.3 million in yearly...

Read more
Read TierPoint announces completion of new data center in St. Louis, Missouri
TierPoint announces completion of new data center in St. Louis, Missouri

TierPoint announces completion of new data center in St. Louis, Missouri

August 05, 2022 TierPoint

TierPoint has announced that its St. Louis data center in Missouri, which was announced back in September 2021, is complete. The facility, spanning 23,000 sqft (2,100 sqm), is a Tier III-quality facility that offers 14,500 sq ft (1,350 sqm) of production or raised floor space. The facility saw an...

Read more
Read Argo Infrastructure Partners Invests $500m in TierPoint
Argo Infrastructure Partners Invests $500m in TierPoint

Argo Infrastructure Partners Invests $500m in TierPoint

March 02, 2022 TierPoint

TierPoint has announced that Argo Infrastructure Partners has invested $500 million into its business. The move sees Argo Infrastructure Partners become the largest single equity investor in the firm. TierPoint will use the net proceeds from the transaction to expand the company and provide...

Read more
Read TierPoint to build new data center in Missouri
TierPoint to build new data center in Missouri

TierPoint to build new data center in Missouri

September 10, 2021 TierPoint

TierPoint has announced that it is expanding in Missouri by investing $20 million into building a 23,000 square feet Tier III data center in the St. Louis region. The data center firm already has three facilities in Missouri; two in St. Louis and one in Kansas City. TierPoint has also secured an...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?