Fidelity Omaha West DC

Latest Podcast 11050 Cornhusker Rd
Operational
Fully operational facility
Operated by:

Fidelity Omaha West DC

Year Built: 2014
PUE: 1.3
░░░░░░ Login to view SqFt
Total Building Size
░░░ Request Dataset MW
Total Power
  • The new LEED Gold facility is located on a greenfield site.
  • Both conventional and prefabricated construction techniques were employed to provide flexibility.
  • IT capacity can be added in 1.0MW increments, with a total capacity of 8MW in a 2N configuration.
  • The modular design ensures that future expansions will not disrupt ongoing operations.
  • A low-profile mass set into the natural terrain topped with a vegetated roof blends into the landscape meeting the client’s goal for a secure, private facility.
  • By leveraging a local aquifer to cool water-cooled IT equipment and base building HVAC system over 24,000 gallons of potable water is saved each year.
  • Gray water was saved and used for irrigation of the vegetated roof and toilets.
  • The sum of all energy-efficient strategies saves 92,108 MMBtu annually— the equivalent energy to power 2,400 typical US homes for a full year.
  • The data center is designed to operate at an efficient annual PUE of less than 1.3.
  • The generators are EPA Tier 4 using best available emissions controls to minimize the impact on the environment.

Map and Nearby Locations

11050 Cornhusker Rd
Fidelity Investments Sites
Nearby Facilities

Fidelity Omaha West DC Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
In Doubt
Withdrawn
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Fidelity Omaha West DC

Distance Site About
1.06 miles H5: Omaha, NE
H5 has acquired a 234,500 sq ft (21,785 sqm) facility in La Vista, Omaha, previously owned by Yahoo!.
2.33 miles Adobe Nebraska
3.10 miles Lightedge Omaha
LightEdge acquired the facility form Cabela's in September 2017
3.17 miles TierPoint Omaha Midlands
The site was acquired when TierPoint bought Cosentury in January 2016.
3.71 miles Center GammaInterested in this information?Contact us
3.93 miles TwoInterested in this information?Contact us
This data center is a part of Google's Papillion Campus in Nebraska.
4.02 miles Edge ParkInterested in this information?Contact us
4.26 miles Point ProInterested in this information?Contact us
This data center is a part of Google's Papillion Campus in Nebraska.
4.32 miles Hub BetaInterested in this information?Contact us
The original plan called for 900,000 sqft data center space and a 70,000 office space. Facebook has since announced an expansion that will bring the complex to 2.6 million square feet. The first data center comes online in 2019.
4.52 miles Connect Data Centers: Papillion, NE
US investment firm Oppidan is planning to build a single-story, 61,550 sqft data center in Papillion, Nebraska. Oppidan lists Connect Data Centers as a subsidiary.
4.63 miles Campus GammaInterested in this information?Contact us
6.44 miles LoCoCoLo Omaha
6.50 miles Lumen Omaha
6.50 miles Scott Data Center Omaha
8.37 miles TierPoint Omaha-Bellevue
Nearly 100,000 SqFt of space in a reinforced concrete block and brick building Expansion capable up to 400,000 SqFt
9.96 miles 1623 Farnam: Omaha Carrier Hotel
This is Omaha's interconnect point.
10.08 miles First National Technology Solutions
11.18 miles CyrusOne Council Bluffs
12.04 miles Ridge UltraInterested in this information?Contact us
Google's Omaha data center campus on Blair High Road encompasses approximately four data center buildings, totaling about 1,432,280 gross square feet in floor area.
12.08 miles Campus UltraInterested in this information?Contact us
12.23 miles EastInterested in this information?Contact us
This data center is a part of Google's Omaha Campus.
12.25 miles OneInterested in this information?Contact us
This data center is a part of Google's Omaha Campus.
12.46 miles Prime CampusInterested in this information?Contact us
This data center is a part of Google's Omaha Campus.
14.51 miles CoreInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
14.66 miles ParkInterested in this information?Contact us
14.66 miles OneInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
14.69 miles Campus AlphaInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
15.23 miles West ValleyInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
15.36 miles Valley OneInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
15.41 miles Station PrimeInterested in this information?Contact us
This data center is a part of Google's Council Bluffs Southlands Campus.
16.99 miles Edged Energy: Council 2
The facility will be part of Edged Energy's Council Bluffs Campus In Iowa.
17.20 miles Edged Energy: Council Bluffs Campus
US data center firm Edged has revised its plans for the Council Bluffs, Iowa data center campus, reducing building height and footprint.

Fidelity Omaha West DC Data Center Photos See all

Operating Company

Operated by:
1
Facilities
1
Markets
8MW
Megawatts

News See all

Read Mitsui and Fidelity Investments form joint venture to build hyperscale data centers in Japan
Mitsui and Fidelity Investments form joint venture to build hyperscale data centers in Japan

Mitsui and Fidelity Investments form joint venture to build hyperscale data centers in Japan

July 25, 2021 Fidelity Investments

Fidelity Investments and Mitsui, a Japanese conglomerate, have formed a joint venture to build hyperscale data centers in Japan. The two companies will have an equal share in the joint venture. However, Colt Data Centre Services, a subsidiary of Fidelity Investments, will manage the data centers....

Read more
Read Another data center in the works for Sarpy County
Baxtel

Another data center in the works for Sarpy County

December 31, 2018 Omaha

PAPILLION — Another company data center is in the works for Sarpy County in eastern Nebraska — a project that's raised questions about data center saturation. The identity of the company is being kept a secret until the land transaction on the west side of Papillion is ensured and utility...

Read more
Read More News

Podcasts See all

See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?