Texas Critical: Odessa 6

Latest Podcast S Jbs Pkwy
Prospective Expansion
Prospective future expansion capacity
Operated by:

Texas Critical: Odessa 6

Short Code: Building 6
Year Planned: 2031

This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.

Map and Nearby Locations

S Jbs Pkwy
New Era Energy & Digital Sites
Nearby Facilities

Texas Critical: Odessa 6 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Texas Critical: Odessa 6

Distance Site About
0.04 miles Texas Critical: Odessa 7
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
0.04 miles Texas Critical: Odessa 5
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
0.08 miles Texas Critical: Odessa 8
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
0.09 miles Texas Critical: Odessa 4
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
0.13 miles Texas Critical: Odessa 9
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
0.13 miles Texas Critical: Odessa 3
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
0.18 miles Texas Critical: Odessa 2
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
0.23 miles Texas Critical: Odessa 1
Texas Critical Data Centers (TCDC) is New Era Energy & Digital's flagship behind-the-meter AI/HPC data center campus on 438 acres in Ector County, near Odessa in the Permian Basin. Originally a 50/50 joint venture with Sharon AI, the project is now wholly owned by New Era Energy & Digital (Nasdaq: NUAI). It is being developed as a multi-phase, natural gas-powered hyperscale campus with partners Stream Data Centers and Primary Digital Infrastructure.
1.29 miles Cipher Digital: Odessa
Cipher mining's Odessa data center (the Odessa Facility), which is its wholly owned 207 megawatts (MW) facility is located in Odessa, Texas.
3.86 miles Onmine: Adrian Project
The Adrian Project is a hydro-cooled high-density data center developed by ONMINE in Texas.
4.18 miles Neocloud Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.20 miles AT&T: Odessa (W 7th St)
4.88 miles AT&T: Odessa (Dawn Ave)
6.18 miles Skybox HODL Ranch
Skybox HODL Ranch was a 174-acre bitcoin mining campus in West Texas near Midland. Its first phase went live in March 2019 with a private substation.
8.40 miles BBT Midland 1
14.14 miles Verizon: Midland (Warehouse Rd)
14.50 miles AT&T: Midland (N Midland Dr)
16.11 miles AT&T: Midland (W Francis Ave)
17.21 miles AT&T: Midland (Missouri Ave)
AT&T's Midland Mutual central office on West Missouri Avenue in downtown Midland, Texas, is the main telephone exchange for the Midland area and houses AT&T's tandem switches for West Texas.

Operating Company

Operated by:

New Era Energy & Digital, Inc. (Nasdaq: NUAI) is a developer and operator of next generation digital infrastructure and integrated power assets. With a growing portfolio of strategically located, vertically integrated resources including powered land and powered shells, we deliver turnkey solutions that enable hyperscale, enterprise, and edge operators to accelerate data center deployment and optimize total cost of ownership while future-proofing their infrastructure investments.

0
Facilities
0
Markets

News See all

Read New Era Signs 20-Year Gas PPA With Vistra Subsidiary For 250MW Texas Data Center
Texas data center developer New Era Energy & Digital has signed a 20-year PPA with Vistra subsidiary Luminant for at least 207MW to power the first phase of its Texas Critical Data Center project i...

New Era Signs 20-Year Gas PPA With Vistra Subsidiary For 250MW Texas Data Center

September 23, 2026 New Era Energy & Digital

Texas data center developer New Era Energy & Digital has signed a 20-year PPA with Vistra subsidiary Luminant for at least 207MW to power the first phase of its Texas Critical Data Center project in Ector County. Power will come directly from Vistra’s 1.1GW natural gas plant in Odessa,...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.