Year Built: 2026
░░░░ Request Dataset MW
Operational Power

The Adrian Project is a hydro-cooled high-density data center developed by ONMINE, a Dallas-based power-first digital infrastructure company. Construction started in April 2026, and ONMINE reported the site fully energized in August 2026. It houses about 1,800 compute units.

Map and Nearby Locations

Onmine Sites
Nearby Facilities

Onmine: Adrian Project Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Onmine: Adrian Project

Distance Site About
0.36 miles AT&T: Odessa (W 7th St)
2.60 miles Cipher Digital: Odessa
Cipher mining's Odessa data center (the Odessa Facility), which is its wholly owned 207 megawatts (MW) facility is located in Odessa, Texas.
2.91 miles AT&T: Odessa (Dawn Ave)
3.19 miles Neocloud Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
3.76 miles Texas Critical: Odessa 1
Texas Critical Data Centers (TCDC) is New Era Energy & Digital's flagship behind-the-meter AI/HPC data center campus on 438 acres in Ector County, near Odessa in the Permian Basin. Originally a 50/50 joint venture with Sharon AI, the project is now wholly owned by New Era Energy & Digital (Nasdaq: NUAI). It is being developed as a multi-phase, natural gas-powered hyperscale campus with partners Stream Data Centers and Primary Digital Infrastructure.
3.79 miles Texas Critical: Odessa 2
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
3.80 miles Texas Critical: Odessa 3
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
3.82 miles Texas Critical: Odessa 4
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
3.84 miles Texas Critical: Odessa 5
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
3.86 miles Texas Critical: Odessa 6
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
3.88 miles Texas Critical: Odessa 7
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
3.90 miles Texas Critical: Odessa 8
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
3.93 miles Texas Critical: Odessa 9
This facility is part of Texas Critical Data Centers' (TCDC) Odessa Campus in West Texas.
8.22 miles Skybox HODL Ranch
Skybox HODL Ranch was a 174-acre bitcoin mining campus in West Texas near Midland. Its first phase went live in March 2019 with a private substation.
10.79 miles BBT Midland 1
16.89 miles Verizon: Midland (Warehouse Rd)
16.93 miles AT&T: Midland (N Midland Dr)
18.92 miles AT&T: Midland (W Francis Ave)
19.90 miles AT&T: Midland (Missouri Ave)
AT&T's Midland Mutual central office on West Missouri Avenue in downtown Midland, Texas, is the main telephone exchange for the Midland area and houses AT&T's tandem switches for West Texas.

Operating Company

Operated by:
0
Facilities
0
Markets

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.