Switch Plans New Data Center Campus Near Pittsburgh
May 01, 2026
Switch
Switch is planning a data center campus at the former Pitt Race property in Big Beaver Borough, Beaver County. The site, located at 201 Penndale Road near Wampum, was sold in March 2026 and spans roughly 382 acres. Switch has announced the project, but local officials said no formal development application had been submitted as of early June 2026. The campus is expected to use Switch’s closed-loop cooling design and benefit from the site’s position near major fiber routes in the greater Pittsburgh region.
| Distance | Site | About |
|---|---|---|
| 0.00 miles | Provident: Pittsburgh, Pennsylvania |
The proposed redevelopment of the former Pitt International Race Complex in Wampum, Pennsylvania, represents a massive 400-acre land banking play by Texas-based developer Provident Data Centers.
|
| 15.30 miles | Aligned: Shippingport Industrial Park |
Aligned Data Centers’ Project Phoenix is a massive $10 billion redevelopment of the former Bruce Mansfield coal plant in Shippingport, Pennsylvania.
|
| 15.90 miles | Big Digital Energy: Bellefonte, PA |
The Bellefonte, Pennsylvania facility operated by Big Digital Energy (formerly Mawson Infrastructure Group) is a modular data center site primarily used for digital asset mining and emerging GPU/HPC workloads.
|
| 15.90 miles | Big Digital Energy: Midland, PA |
Mawson Infrastructure Group Inc has deployed its Modular Data Centre (MDC) bitcoin mining solution to the Midland site. The Midland site now has a total capacity of 120 MW.
|
| 16.23 miles | Standard Power: Beaver Valley |
Standard Power, a blockchain company, has partnered with Vistra Corp. to construct a large-scale, carbon-free data center adjacent to the Beaver Valley nuclear power plant in Shippingport, Pennsylvania.
|
Switch, the technology infrastructure corporation headquartered in Las Vegas, Nevada is built on the intelligent and sustainable growth of the internet. Switch founder and CEO Rob Roy has developed more than 500 issued and pending patent claims covering data center designs that have manifested into the company’s world-renowned data centers.
Switch has PRIME campuses located in Las Vegas and Tahoe Reno, Nevada; Grand Rapids, Michigan; and Atlanta, Georgia.
May 01, 2026
Switch
March 16, 2026
Switch
September 01, 2023
Switch
June 01, 2023
Pittsburgh
January 02, 2023
Switch
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas