Sharon AI Signs 50MW Data Center Lease with NextDC
November 03, 2025
NEXTDC
NextDC Perth P2 data center is located at 11 Newcastle Street, Perth WA 6000. The facility provides 12,000m2 of technical space with a target PUE of 1.15.
| Distance | Site | About |
|---|---|---|
| 0.53 miles | Equinix: Perth PE1 |
Equinix PE1 Perth Data Center is situated at 3 Tully Road, Perth WA 6004, Australia. PE1 is one of two Perth-based data centres that Equinix inherited from the Metronode acquisition. The facility spans 7,113 sq ft, with 4,811 sq ft of raised floor space available for colocation.
|
| 0.84 miles | Vocus Perth |
The facility was previously operated by Perth iX. Vocus Communications (ASX: VOC) acquired the long-established Perth data center operator Perth iX for $6.275m in 2011.
|
| 3.16 miles | GreenSquareDC WAi1 | |
| 3.41 miles | Vocus: Bentley PER02 |
Vocus expanded Western Australian presence with acquisition of the Bentley Data Centre in 2014.
|
| 4.13 miles | Equinix: Perth PE3 |
In 2021, Equinix launched its PE3 data center in Perth, Australia. The facility is the company’s third IBX facility in the city. The first phase offers capacity for around 700 cabinets across 1,830 sqm (38,600 sq tf). Equinix said it invested US$54 million (A$71.7 million) for phase one.
|
| 4.13 miles | DC Two Osborne Park | |
| 4.13 miles | Equinix: Perth PE2 |
Equinix PE2 Perth Data Center is situated at Lemnos St, Shenton Park WA 6008, Australia. PE2 is one of two Perth-based data centres that Equinix inherited from the Metronode acquisition.
|
| 6.13 miles | NEXTDC Perth P1 |
|
| 6.42 miles | Fujitsu Malaga | |
| 8.08 miles | Pier DC | |
| 9.79 miles | Carrier-Neutral Data Center Request Dataset |
This facility is part of the Canberra Data Centres (CDC) Maddington Campus in Perth, Australia.
|
| 9.86 miles | Carrier-Neutral Data Center Request Dataset |
This facility is part of the Canberra Data Centres (CDC) Maddington Campus in Perth, Australia.
|
| 9.90 miles | Carrier-Neutral Data Center Request Dataset |
CDC Data Centres has received the green light to proceed with a major AU$415 million ($270.2 million USD) project in Maddington, Perth.
|
| 9.92 miles | Carrier-Neutral Data Center Request Dataset |
This facility is part of the Canberra Data Centres (CDC) Maddington Campus in Perth, Australia.
|
| 10.91 miles | Stack: PER01B |
Stack Infrastructure is planning to develop a data center campus in Wangara, a light industrial suburb of Perth. The proposed campus is set to include two buildings, tentatively named PER01A and PER01B. At full build-out, the campus will span across ~220k sqft (~20.5k sqm) of area.
|
| 10.93 miles | Stack: Perth PER01 |
Stack Infrastructure is planning to develop a data center campus in Wangara, a light industrial suburb of Perth. The proposed campus is set to include two buildings, tentatively named PER01A and PER01B.
|
NEXTDC is an ASX200-listed technology company enabling business transformation through innovative data centre outsourcing solutions and connectivity services.
As Australia’s leading independent data centre operator, the company is one of the largest providers in Australia.
November 03, 2025
NEXTDC
August 15, 2025
NEXTDC
June 14, 2025
NEXTDC
August 16, 2024
NEXTDC
August 07, 2024
NEXTDC
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas