0.03 miles
|
Equinix: Perth PE3
|
In 2021, Equinix launched its PE3 data center in Perth, Australia. The facility is the company’s third IBX facility in the city. The first phase offers capacity for around 700 cabinets across 1,830 sqm (38,600 sq tf). Equinix said it invested US$54 million (A$71.7 million) for phase one.
|
|
3.32 miles
|
DC Two Osborne Park
|
|
|
3.36 miles
|
Vocus Perth
|
The facility was previously operated by Perth iX. Vocus Communications (ASX: VOC) acquired the long-established Perth data center operator Perth iX for $6.275m in 2011.
|
|
3.71 miles
|
PureColo Perth
|
Retail colocation facility in Perth, Western Australia, operated by PureColo, the operating arm of Carrier Connect Data Solutions. N+1 power and cooling with raised floor and in-row containment for standard and high-density cabinets.
|
|
4.13 miles
|
NextDC: P2 Perth
|
NextDC Perth P2 data center is located at 11 Newcastle Street, Perth WA 6000. The facility provides 12,000m2 of technical space with a target PUE of 1.15.
|
|
4.66 miles
|
Equinix: Perth PE1
|
Equinix PE1 Perth Data Center is situated at 3 Tully Road, Perth WA 6004, Australia. PE1 is one of two Perth-based data centres that Equinix inherited from the Metronode acquisition. The facility spans 7,113 sq ft, with 4,811 sq ft of raised floor space available for colocation.
|
|
5.98 miles
|
Vocus: Bentley PER02
|
Vocus expanded Western Australian presence with acquisition of the Bentley Data Centre in 2014.
|
|
7.29 miles
|
GreenSquareDC WAi1
|
|
|
8.54 miles
|
NEXTDC: P1 Perth
|
Located in Malaga, 13 km from the Perth CBD, P1 Perth is a Tier III certified data centre designed to keep Western Australian workloads close to critical network, power and submarine cable infrastructure.
|
|
8.76 miles
|
Centuria: Malaga
|
Centuria Industrial REIT acquired the Fujitsu-occupied data centre at 16 Mulgul Road, Malaga, Perth, in July 2024 for A$39 million.
|
|
8.76 miles
|
Fujitsu Malaga
|
Fujitsu has agreed to sell that operating business to Next Capital by end-2026, but Centuria remains the landlord.
|
|
9.96 miles
|
Pier DC
|
|
|
11.13 miles
|
Stack: PER01B
|
Stack Infrastructure is planning to develop a data center campus in Wangara, a light industrial suburb of Perth. The proposed campus is set to include two buildings, tentatively named PER01A and PER01B. At full build-out, the campus will span across ~220k sqft (~20.5k sqm) of area.
|
|
11.15 miles
|
Stack: Perth PER01
|
Stack Infrastructure is planning to develop a data center campus in Wangara, a light industrial suburb of Perth. The proposed campus is set to include two buildings, tentatively named PER01A and PER01B.
|
|
12.76 miles
|
Real Estate Data CenterInterested in this information?Contact us
|
Hazelmere is an existing CIP industrial holding in Perth’s east, a six hectare manufacturing site leased until late 2027. CIP has submitted a power application and the land sits about two kilometres from Guildford Terminal Station.
|
|
13.18 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the Carrier-Neutral Operator Maddington Campus in Perth, Australia.
|
|
13.26 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the Carrier-Neutral Operator Maddington Campus in Perth, Australia.
|
|
13.27 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
CDC Data Centres has received the green light to proceed with a major AU$415 million ($270.2 million USD) project in Maddington, Perth.
|
|
13.31 miles
|
Carrier-Neutral Data CenterInterested in this information?Contact us
|
This facility is part of the Carrier-Neutral Operator Maddington Campus in Perth, Australia.
|