Lumen Columbia 1

Latest Podcast 3201 Falling Leaf Ct.
Operational
Fully operational facility
Operated by:

Lumen Columbia 1

░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Total Power

Map and Nearby Locations

3201 Falling Leaf Ct.
Lumen Technologies Sites
Nearby Facilities

Sites within 15 miles of Lumen Columbia 1

Distance Site About
15.75 miles Crusoe: Callaway County
Crusoe is considering a hyperscale AI data center campus on rural land northwest of Kingdom City in Callaway County. The project remains in preliminary development, with land acquisition, utility agreements and county tax incentives still unresolved.

Operating Company

Operated by:

The combined company of CenturyLink and Level(3) has one of the largest networks in the world.

The combined company of CenturyLink and Level 3 is a patchwork of data centers that span over Europe, North America, and Latin America. The data centers came through acquisitions that include Global Crossing (2011) and TW Telecom (2014).

A Timeline of Level 3 Acquisitions

  • 2020: CenturyLink rebrands as Lumen Technologies
  • 2017: CenturyLink acquired Level 3's data centers and network for $34 billion
  • 2015: Black Lotus (for Level3's DDoS mitigation product)
  • 2014 Level 3 acquired TW Telecom for $5.7 billion
  • 2012 Level 3 acquired Voxility
  • 2011 Level 3 acquired Global Crossing (GX) for $2.0 Billion
  • 2007: Level(3) acquired Broadwing for $1.4 billion
  • 2006: Level(3) acquired Progress Telecom for $137 million
  • 2006: Level3 acquired Looking Glass Networks for $96 million
  • 2006: Level3 acquired Telcove (Adelphia Business Solutions) for $1.2 billion
  • 2006: Level3 acquired ICG Communications for $163 million
  • 2005: Level 3 acquired WilTel for $680 million
  • 2002: Level3 acquired Genuity for $242 million
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Beltline Energy Pulls Data Center Proposal in Pacific
Renewable energy company Beltline Energy has withdrawn its proposal to rezone a parcel of land in Pacific, Missouri, for a planned data center. Pacific Mayor Debbie Kelley confirmed the withdrawal ...

Beltline Energy Pulls Data Center Proposal in Pacific

August 12, 2026 Missouri

Renewable energy company Beltline Energy has withdrawn its proposal to rezone a parcel of land in Pacific, Missouri, for a planned data center. Pacific Mayor Debbie Kelley confirmed the withdrawal in a statement posted on Friday, August 7, 2026. The application was submitted by BLE Landholdings,...

Read more
Read Developer Withdraws Data Center Proposal in St. Joseph, Missouri
An application to rezone and annex land for a proposed data center in St. Joseph, Missouri, has been withdrawn. Capstone Technology Campus, owned by local businessman Steve Craig, had sought approv...

Developer Withdraws Data Center Proposal in St. Joseph, Missouri

June 30, 2026 Missouri

An application to rezone and annex land for a proposed data center in St. Joseph, Missouri, has been withdrawn. Capstone Technology Campus, owned by local businessman Steve Craig, had sought approval for a 130-acre development across sites at 6321 and 5701 Pickett Road. The City of St. Joseph...

Read more
Read 340,000-Square-Foot Data Center and Office Property Listed for Sale in Downtown St. Louis
340,000-Square-Foot Data Center and Office Property Listed for Sale in Downtown St. Louis

340,000-Square-Foot Data Center and Office Property Listed for Sale in Downtown St. Louis

June 02, 2026 Missouri

A 340,000-square-foot (31,587 sqm) property combining data center and office space has been listed for sale in downtown St. Louis, Missouri. Situated at 1831 Chestnut Condominium, the six-story building occupies a 4.24-acre site and includes approximately 53,000 square feet (4,923 sqm) dedicated...

Read more
Read Lumen Appoints Jim Fowler as CTO
Lumen Appoints Jim Fowler as CTO

Lumen Appoints Jim Fowler as CTO

December 11, 2025 Lumen Technologies

Lumen Technologies has appointed Jim Fowler as its executive vice president and chief technology and product officer. The new CTO is to succeed Dave Ward, who is leaving Lumen to become president and chief architect at Salesforce. Starting from January 6, Fowler will manage global technology and...

Read more
Read TierPoint to expand data center footprint in St. Louis, Missouri
TierPoint to expand data center footprint in St. Louis, Missouri

TierPoint to expand data center footprint in St. Louis, Missouri

August 16, 2024 Missouri

US operator TierPoint this week announced that it has acquired a building in downtown St. Louis which it plans to retrofit into an enterprise-grade data center. ver the next year, the first phase of investment will build out 22,600 square feet of data center production space and 5MW of utility...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?