Kyndryl: Edmonton (Acheson)

Latest Podcast 9672 279 St
OperationalProspective Expansion
Fully operational facility with prospective expansion planned
Operated by:

Kyndryl: Edmonton (Acheson)

Year Built: 2014
Utility Provider: FortisAlberta
Ownership: Kyndryl owns. the building.
Lot Size: 8 acres
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░ Request Dataset MW
Operational Power
░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Kyndryl's Edmonton data centre (site code CA1) is a standalone colocation and managed-hosting facility in the Acheson Industrial Area, just west of Edmonton. IBM Canada built it as its Western Leadership Data Centre. The building covers about 66,250 sq ft, with about 15,000 sq ft of configured white space.

Site History

  • November 2021: Kyndryl spins off from IBM and takes over the facility.
  • 2014: IBM Canada opens the Western Leadership Data Centre in Acheson.

Project Profile

  • Design: Kyndryl Design Level 3, built to Tier III; LEED Silver
  • Power: dual utility feeds, N+1 UPS and standby generators
  • Cooling: air-cooled halls served by water-cooled chillers
  • Connectivity: TELUS, Bell, Rogers (Shaw) and Zayo (Allstream)
  • Certifications: ISO 27001, PCI DSS and SOC 1 Type II

Map and Nearby Locations

9672 279 St
Kyndryl Sites
Nearby Facilities

Kyndryl: Edmonton (Acheson) Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Kyndryl: Edmonton (Acheson)

Distance Site About
1.60 miles Beacon Hary Smith AI Hub
Beacon AI Centers proposed the Harry Smith AI Hub on rezoned land at Acheson in Parkland County, west of Edmonton. The project has seen no development permit or power plant application since its 2025 rezoning.
7.26 miles Qu DC: West Edmonton EDM2
Qu Data Centres' EDM2 is a colocation data centre in a converted industrial building in west Edmonton's Armstrong Industrial area. It was one of nine Rogers data centres sold to InfraRed Capital Partners in 2025.
9.38 miles 4WEB: Edmonton
4WEB runs a small colocation data centre in Nexus Business Park in northwest Edmonton, offering rack space, private lockers and per-U colocation.
12.04 miles Qu DC: Edmonton City Centre EDM1
Qu Data Centres' EDM1 is a colocation data centre on the third floor of Edmonton City Centre West in downtown Edmonton. It was one of nine Rogers data centres sold to InfraRed Capital Partners in 2025.
12.10 miles ThinkTel Communications Edmonton
ThinkTel, an Edmonton-founded business phone and internet carrier, ran a colocation room in HSBC Place in downtown Edmonton. ThinkTel now lists three colocation sites, none in Edmonton.
12.15 miles Wolfpaw Edmonton
Wolfpaw's EDM1 is a carrier-neutral data centre on the third floor of Rice Howard Place in downtown Edmonton's financial core. It hosts the YEGIX internet exchange and Hurricane Electric's Edmonton node.
13.43 miles The Internet Centre
The Internet Centre runs a 3,000 sq ft colocation data centre in Strathcona Industrial Park on Edmonton's south side. The Edmonton internet provider opened colocation at the site in 2003.
19.37 miles Five Nine
Five Nine Data Center marketed a 28,000 sq ft data centre on Alexander First Nation land northwest of Edmonton. The building opened in 2007 as the Alexander Internet Technologies data centre, which closed in 2009.

Operating Company

Operated by:

IBM Cloud history

  • June 2013 - IBM acquired SoftLayer, a public cloud platform, to serve as the foundation for its IaaS offering
  • July 2014 - IBM introduced the Bluemix Platform-as-a-Service (PaaS)
  • October 2016 - IBM rolled the SoftLayer brand under its Bluemix brand of PaaS offerings
  • October 2017 - IBM unified its entire cloud portfolio as IBM Cloud
0
Facilities
0
Markets

News See all

Read Groq and IBM Partner on Agentic AI Capabilities
Groq and IBM Partner on Agentic AI Capabilities

Groq and IBM Partner on Agentic AI Capabilities

October 20, 2025 Kyndryl

AI chip startup Groq has partnered with IBM to provide agentic AI capabilities via GroqCloud on IBM watsonx Orchestrate. Under the terms of the agreement, the partners will also integrate Red Hat’s open source vLLM technology with Groq’s LPU chips, with plans to support IBM Granite models on...

Read more
Read IBM and GlobalFoundries end legal dispute
IBM and GlobalFoundries end legal dispute

IBM and GlobalFoundries end legal dispute

January 07, 2025 Kyndryl

IBM and GlobalFoundries (GF) have reached a settlement in their long-running legal dispute which saw both companies claim breach of contract and misuse of trade secrets and intellectual property. The two companies said the undisclosed settlement resolves “all litigation matters” and would allow...

Read more
Read IBM to make AMD Instinct MI300X GPUs available via IBM Cloud
IBM to make AMD Instinct MI300X GPUs available via IBM Cloud

IBM to make AMD Instinct MI300X GPUs available via IBM Cloud

November 20, 2024 Kyndryl

IBM is planning to make AMD Instinct MI300X GPUs available as a service via IBM Cloud. The GPUs will be rolled out on the platform in the first half of 2025, with the aim of improving the performance and power efficiency of generative AI models and high-performance computing applications.“As...

Read more
Read IBM unveils quantum data center in Germany
IBM unveils quantum data center in Germany

IBM unveils quantum data center in Germany

October 01, 2024 Kyndryl

IBM this week announced the launch of the facility, at IBM's campus in Ehningen near Stuttgart, in a ceremony attended by German Chancellor Olaf Scholz. It is IBM's second quantum data center, featuring three systems - one based on IBM's Heron processor, alongside two other new...

Read more
Read Riken to deploy IBM quantum computer
 Riken to deploy IBM quantum computer

Riken to deploy IBM quantum computer

May 01, 2024 Kyndryl

Japanese research institute Riken is set to deploy an IBM quantum computer at its facilities in Kobe. The quantum system – to be powered by a 133-qubit Heron processor – will be colocated and integrated with the organization’s existing Fugaku supercomputer. “Riken is committed to developing...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.