Keppel DC: Johor Sedenak 1

Operational
Fully operational facility
Operated by:

Keppel DC: Johor Sedenak 1

Short Code: Johor 1
Year Built: 2020
░░░ Request Dataset MW
Operational Power
░░░░░░░ Interested in this information? Contact us SqFt
Gross Colocation Size

Keppel DC Johor 1 is a built-to-suit data centre located in an industrial park in Johor, Malaysia, which has been planned to be a data and research hub. The facility was completed in 2020. Microsoft is rumoured to be the customer of the facility.

Map and Nearby Locations

PC37+2F
Keppel Data Center REIT Sites
Nearby Facilities

Keppel DC: Johor Sedenak 1 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Keppel DC: Johor Sedenak 1

Distance Site About
0.13 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
0.19 miles Bridge DC: MY06-3
The third building on Bridge Data Centres' Sedenak MY06 campus, enlarged during construction for anchor tenant ByteDance.
0.24 miles K2: Kulai JHR01-03
K2 Data Centres ("K2") is building a hyperscale data center campus at Sedenak Tech Park in Johor.
0.25 miles Bridge DC: MY06 Expansion
Further buildings that Bridge Data Centres markets for its Sedenak MY06 campus, which Bridge describes as a 15-building campus.
0.28 miles K2: Kulai JHR04
0.29 miles Bridge DC: MY06-2
The second building on Bridge Data Centres' Sedenak MY06 campus and its first phase to use immersion cooling, serving anchor tenant ByteDance.
0.36 miles Bridge DC: MY06-1
The first building on Bridge Data Centres' Sedenak MY06 campus, assembled from close to 400 prefabricated modules made in China and leased to anchor tenant ByteDance.
0.38 miles K2: Kulai Expansion
0.41 miles Bridge DC: MY06-4
A smaller expansion project on Bridge Data Centres' Sedenak MY06 campus, built for anchor tenant ByteDance.
0.58 miles Vantage: JHB11
JHB11 is the first data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.61 miles Vantage: JHB12
JHB12 is the second planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.62 miles Vantage: JHB13
JHB13 is the third planned data center on Vantage's JHB1 campus in Sedenak Tech Park, Johor.
0.65 miles Princeton PDG: JH1 Bldg-2
This facility is part of Princeton PDG's JH1 Campus in Johor.
0.67 miles BrightRay: Johor MY-01
In 2025, Malaysian pre-fab data center specialist BrightRay officially opened its first facility in Johor.
0.70 miles BrightRay: MY-03
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
0.72 miles Princeton PDG: JH1 Bldg-1
Occupying 128,000 m² of land, JH1 is a carrier-neutral site featuring a design PUE of ≤1.4. The campus will consist of four buildings, the first of which successfully came online in July 2024. https://princetondg.com/malaysia/jh1/
0.73 miles Princeton PDG: JH1 Bldg-4
PDG has started construction of the third building of its JH1 campus.
0.74 miles BrightRay: MY-02
This facility will be part of BrightRay's Sedenak Tech Park Campus in Johor.
0.79 miles Princeton PDG: JH1 Bldg-3
PDG successfully topped out the third building of its JH1 campus in late 2025.
0.88 miles GDC SDN: Johor SDK1
Global Data Centre Sdn. Bhd. (GDC) has officially broken ground on GDC-SDK1, a high density AI data center located in Johor’s Sedenak Tech Park.
8.48 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
9.38 miles YTL: JDC3
This facility is a part of YTL's Johor campus in Malaysia.
9.41 miles YTL: JDC6
This facility is a part of YTL's Johor campus in Malaysia.
9.41 miles YTL: JDC1
YTL Green Data Center Park, the region's first solar-powered data center park spanning 275 acres, is located in Johor, Malaysia.
9.44 miles YTL: JDC2
This facility is a part of YTL's Johor campus in Malaysia.
10.42 miles Central RidgeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
13.11 miles GlobalInterested in this information?Contact us
16.17 miles Edge StationInterested in this information?Contact us
16.46 miles Global Switch: Johor
Global Switch plans to build a data center campus in Johor, Malaysia.
16.46 miles CURRENC: Johor
Fintech holding company CURRENC Group is venturing into data center development with a new facility in Johor, Malaysia.
16.46 miles EdgeConneX: Johor
EdgeConneX is building a huge data center campus in Johor, Malaysia.
19.26 miles ZData: Johor
Tropicana Corporation Berhad's subsidiary, Tropicana Firstwide Sdn Bhd, has entered into a land sale agreement with ZData's Malaysian unit, Computility Technology (Malaysia) Sdn Bhd.
19.65 miles Princeton PDG: JH2
PDG's JH2 data center is strategically positioned in Johor's Eco Business Park at Mukim Senai, just 30 km from the company's existing JH1 campus in Sedenak Tech Park.
19.86 miles NTT: Gelang Patah
NTT Data aims to develop a six buildings campus on a 68.5-acre parcel of land in Gelang Patah, Johor Bahru.

Keppel DC: Johor Sedenak 1 Data Center Photos See all

Exterior gate
Source: Baxtel

Operating Company

Operated by:

Keppel Data Centres is the manager and operator of premier data centres across Asia-Pacific and Europe. Keppel DC REIT's parent company is Keppel Telecommunications & Transportation Ltd.

0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Malaysia Requires Data Centers To Source 30% Renewable Energy
Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan ...

Malaysia Requires Data Centers To Source 30% Renewable Energy

October 29, 2026 Malaysia

Malaysia's government has approved a requirement for data centers to source at least 30 percent of their power from renewable energy. Deputy Prime Minister Datuk Seri Fadillah Yusof told the Dewan Rakyat on October 27 that the rule applies to a data center's total capacity or its energy...

Read more
Read DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion
A seven-bank consortium has added RM15 billion, about US$3.67 billion, to [DayOne](https://baxtel.com/data-centers/dayone)'s Johor data center financing, lifting the Singapore-headquartered operato...

DayOne Adds $3.67 Billion Johor Financing, Bank Platform Hits $7.3 Billion

October 14, 2026 DayOne

A seven-bank consortium has added RM15 billion, about US$3.67 billion, to DayOne's Johor data center financing, lifting the Singapore-headquartered operator's debt platform in Malaysia's southern state to RM30 billion, or roughly US$7.3 billion. The lenders set out the upsizing in a joint...

Read more
Read Keppel Plans 60MW Data Center in Seoul as It Expands Into South Korea
Singapore-based real estate investor Keppel will develop a 60MW greenfield data center in Ansan, near Seoul, marking its entry into South Korea’s data center market. The project will be developed t...

Keppel Plans 60MW Data Center in Seoul as It Expands Into South Korea

June 09, 2026 Keppel Data Center REIT

Singapore-based real estate investor Keppel will develop a 60MW greenfield data center in Ansan, near Seoul, marking its entry into South Korea’s data center market. The project will be developed through Keppel Data Centre Fund III (KDCF III), which has acquired a majority stake in the vehicle...

Read more
Read Keppel secures rights to 720MW data center campus outside Melbourne, Australia
Keppel secures rights to 720MW data center campus outside Melbourne, Australia

Keppel secures rights to 720MW data center campus outside Melbourne, Australia

January 16, 2026 Keppel Data Center REIT

Keppel this week said its Connectivity Division has secured the rights to lease a 123-hectare contiguous site near Morwell, Victoria, with a gross power capacity of up to 720MW, from Australian energy and infrastructure landowner Lightwood Group.Manjot Singh Mann, CEO of Connectivity, Keppel,...

Read more
Read Keppel Secures 10-year Land Lease Extension for Singapore
Keppel Secures 10-year Land Lease Extension for Singapore

Keppel Secures 10-year Land Lease Extension for Singapore

January 08, 2026 Keppel Data Center REIT

Keppel has secured a land lease extension for a data center campus in Singapore. The company last year announced that the relevant authorities had granted conditional approval for a 10-year land tenure lease extension for the Keppel Data Centre Campus at Genting Lane in Singapore.Keppel said the...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Ready to Level up Your
Data Center Strategy?