Data Center Campus

IREN: Childress Campus

IREN's 576-acre Childress campus is moving from Bitcoin mining to AI cloud services. It hosts liquid-cooled Horizon buildings for Microsoft and air-cooled halls converted for NVIDIA.

7 sites Childress
Under ConstructionOperationalPlanned
Operational facility with ongoing expansion and future phases planned
Developed by:

Campus at a Glance

7 data centers on this campus
First built in 2025 with expansions through 2027
Coordinates: 34.38909, -100.04541
░░░░░ Request Dataset MW
Operational
░░░░░ Request Dataset MW
Under Construction
░░░░ Request Dataset MW
Planned

IREN owns a 576-acre freehold campus on US 287 east of Childress, Texas. The campus connects to the ERCOT grid at the Salvare 345 kV switchyard, owned by Electric Transmission Texas. AEP Texas is the transmission provider, and IREN owns the on-site 345 kV bulk substation.

IREN built the campus for Bitcoin mining from 2022 to 2025. It now builds liquid-cooled Horizon AI data centers for Microsoft and converts its air-cooled mining halls to AI cloud capacity. IREN plans to wind down Bitcoin mining at the campus by the end of 2026.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
IREN: Childress, TX IREN
Under ConstructionOperationalPlanned
░░░░ Request Dataset MW — 2025
IREN: Horizon 1 IREN
Operational
░░░░ Request Dataset MW — 2026
IREN: Horizon 2 IREN
Under Construction
— — 2027
IREN: Horizon 3 IREN
Under Construction
— — 2027
IREN: Horizon 4 IREN
Under Construction
— — 2027
IREN: Horizon 5 IREN
Under Construction
— — 2027
IREN: Horizon 6 IREN
Under Construction
— — 2027

Map and Nearby Locations

IREN: Childress Campus Power Growth Over Time

+100% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Campus Photos

Developer

Developed by:

IREN was founded in November 2018 by brothers Daniel and Will Roberts as Iris Energy, with a thesis that vertically integrating land, renewable power, substations, buildings, and hardware would produce the lowest-cost, fastest-to-power compute platform.

British Columbia (2019 to 2021): hydro-powered foundation. IREN's first site, Canal Flats, BC (30 MW), came online in 2019 on 10 acres of freehold land repurposed from a closed lumber mill, powered by 100% hydroelectricity. Mackenzie, BC (80 MW, 11 acres acquired from the District of Mackenzie) and Prince George, BC (50 MW, 12-acre freehold site) followed, bringing BC capacity to 160 MW. All three campuses run on roughly 98% direct hydro and ~2% RECs.

Nasdaq IPO (November 2021). IREN listed on the Nasdaq Global Select Market on November 19, 2021, raising $232 million in a deal led by J.P. Morgan, Canaccord Genuity, and Citigroup.

Texas entry (2022). IREN moved into ERCOT in 2022, acquiring 420 acres of freehold land in Childress, TX with a direct 345 kV grid connection, and 500 acres in Sweetwater, TX with a 600 MW grid-connection agreement. Childress reached 750 MW operational and is now the company's largest campus.

Rebrand to IREN (November 2024). Iris Energy formally rebranded to IREN in November 2024, signaling a strategic pivot from a Bitcoin-mining-first identity to a broader next-generation data center and AI Cloud platform.

Pivot to AI Cloud / HPC (2024 to 2026). In Q4 2025, IREN energized Horizon 1, a 50 MW IT (75 MW gross) direct-to-chip liquid-cooled AI deployment at Childress, marking the company's first purpose-built AI data center. Sweetwater 1 (1.4 GW) was energized in April 2026; Sweetwater 2 (600 MW, ~28 miles away) is targeted for late 2027, and the two will be linked by a direct fiber loop to form a single 2 GW Sweetwater hub.

Oklahoma land bank. IREN's Woods County, Oklahoma site adds approximately 2,000 acres of land bank with up to 1.6 GW of development pipeline.

May 2026 acquisitions. On May 5, 2026, IREN announced the acquisition of Mirantis for approximately $625 million in stock, adding cloud infrastructure, Kubernetes orchestration, and enterprise support capabilities to accelerate AI Cloud deployment, operations, and customer support. On May 7, 2026, IREN announced the acquisition of Nostrum Group (Ingenostrum, S.L.), a next-generation data center developer in Spain, adding ~490 MW of secured grid-connected power and bringing IREN's total power portfolio to 5 GW. The Nostrum deal marks IREN's first European footprint for its AI Cloud platform.

Financials. IREN reported FY2025 revenue of $501.0 million (+168% YoY) and net income of $86.9 million. Q3 FY26 results were released alongside the Nostrum deal on May 7, 2026.