Crusoe: Project Hyper Childress Building 3

Latest Podcast 525 C County Road 23
Under Construction
New facility under construction
Operated by:

Crusoe: Project Hyper Childress Building 3

Year Planned: 2028
Utility Provider: AEP Texas
Ownership: Crusoe does not own the building.
This site is leased from Lancium in the Lancium: Childress Campus building

Building 3 is one of three single-story AI data centers Crusoe is building as Project Hyper on Lancium's Clean Campus in Childress County, Texas, south of US 287. The building covers about 806,000 square feet, with data halls, offices and support space, and HKS designed it. Construction began in October 2026, with completion targeted for May 2028.

Lancium owns the land and provides the power infrastructure, including a 1 GW grid interconnection approved by ERCOT. Bloomberg reported in June 2026 that Meta is the end customer for the campus.

Site History

  • In September 2026, Crusoe registered the three Project Hyper buildings with the Texas Department of Licensing and Regulation.
  • In October 2026, construction of Building 3 began.
  • In July 2026, Crusoe and Lancium announced the campus.

Map and Nearby Locations

525 C County Road 23
Crusoe Sites
Nearby Facilities

Crusoe: Project Hyper Childress Building 3 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Crusoe: Project Hyper Childress Building 3

Distance Site About
0.26 miles Crusoe: Project Hyper Childress Building 2
Building 2 of Crusoe's Project Hyper is a single-story AI data center under construction on Lancium's Clean Campus in Childress County, Texas.
0.39 miles Lancium: Childress Campus
Lancium's Clean Campus in southeast Childress County, Texas, is powered land where Crusoe is building three AI data centers.
0.54 miles Crusoe: Project Hyper Childress Building 1
Building 1 of Crusoe's Project Hyper is a single-story AI data center under construction on Lancium's Clean Campus in Childress County, Texas.
1.60 miles IREN: Childress, TX
IREN's original Childress halls, built for Bitcoin mining, are being converted into air-cooled AI cloud capacity in 15 data halls.
1.61 miles IREN: Horizon 1
Horizon 1 is the first liquid-cooled AI data center on IREN's Childress campus. It serves Microsoft with NVIDIA GB300 systems.
1.64 miles IREN: Horizon 2
Horizon 2 is one of four liquid-cooled AI data centers IREN is building at Childress, Texas, for Microsoft.
1.76 miles IREN: Horizon 6
Horizon 6 is one of two further liquid-cooled AI data centers IREN is building on its Childress campus in Texas.
1.77 miles IREN: Horizon 4
Horizon 4 is one of four liquid-cooled AI data centers IREN is building at Childress, Texas, for Microsoft.
1.78 miles IREN: Horizon 5
Horizon 5 is one of two further liquid-cooled AI data centers IREN is building on its Childress campus in Texas.
1.79 miles IREN: Horizon 3
Horizon 3 is one of four liquid-cooled AI data centers IREN is building at Childress, Texas, for Microsoft.
3.24 miles CampusInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Crusoe: Project Hyper Childress Building 3 Data Center Photos See all

Crusoe’s DFM system converts natural gas into electricity that powers wellsite digital operations
Source: Source: Crusoe Energy Systems

Operating Company

Operated by:

Crusoe is a privately held AI infrastructure developer and GPU cloud provider that builds AI data center campuses and offers GPU cloud services in the United States. The company began as Crusoe Energy Systems, a flare mitigation provider that powered onsite computing from stranded natural gas, with bitcoin mining as an early use case.

Crusoe is developing an AI campus at the Lancium Clean Campus in Abilene, Texas, planned for 1.2 GW, and in May 2025 it secured $11.6 billion in debt and equity to expand the site from two to eight buildings.

For this project, it is reported that Crusoe’s direct customer is Oracle and that OpenAI is Oracle’s customer; the Abilene campus is tied to OpenAI’s Stargate program;

OpenAI later announced an additional 4.5 GW Stargate partnership with Oracle that references the Abilene Stargate I site. Crusoe also expanded in-house manufacturing capability through the acquisition of Easter-Owens Electric in 2022.

Crusoe History:

  • In July 2025 announced a 1.8 GW AI data center campus with Tallgrass near Cheyenne, Wyoming.
  • In May, 2025, secured $11.6 billion in debt and equity to expand the Abilene, Texas campus to eight buildings, with Crusoe noting Oracle as the direct customer and OpenAI as Oracle’s customer for the site.
  • In March 2025 began construction on the second phase of the Abilene, Texas campus to bring total planned capacity to 1.2 GW.
  • In April 2022 raised Series C financing that included plans to launch the CrusoeCloud platform for high performance computing.
  • In June 2022 acquired Easter-Owens Electric to vertically integrate modular data center manufacturing.
  • Founded in 2018 as Crusoe Energy Systems to mitigate gas flaring by powering onsite computing, including bitcoin mining.
0
Facilities
0
Markets

News See all

Read Crusoe Signs 106MW Paraguay AI Cloud Partnership With Araico
[Crusoe](https://baxtel.com/data-centers/crusoe) signed a [strategic partnership](https://markets.businessinsider.com/news/stocks/crusoe-partners-with-araico-to-deploy-ai-cloud-infrastructure-in-pa...

Crusoe Signs 106MW Paraguay AI Cloud Partnership With Araico

October 23, 2026 Crusoe

Crusoe signed a strategic partnership with Araico, a Paraguayan energy and infrastructure developer, to build AI compute infrastructure powered by the Itaipú Hydroelectric Dam. The first deployment is planned for mid-2027, with a path to 106 MW of IT capacity. Under the partnership, Araico leads...

Read more
Read Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus
[Crusoe](https://baxtel.com/data-centers/crusoe) will take a second, larger building at [Polar Data Centers](https://baxtel.com/data-centers/polar-dc)' Tørdal campus in Norway. Polar announced the ...

Crusoe Takes 40MW Second Phase At Polar's Hydro-Powered Norway Campus

October 22, 2026 Crusoe

Crusoe will take a second, larger building at Polar Data Centers' Tørdal campus in Norway. Polar announced the expansion on Oct. 21 (announcement). The new building, DRA02, will add 40MW of liquid-cooled critical IT capacity on hydroelectric power and is due online in late 2027. Crusoe plans...

Read more
Read Crusoe Files For $4.8B Data Center Campus In Jayton, Texas
Crusoe has filed plans with the [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/tabs/search) for a two-building data center campus in Jayton, in rural Kent County, Texas, ...

Crusoe Files For $4.8B Data Center Campus In Jayton, Texas

October 02, 2026 Crusoe

Crusoe has filed plans with the Texas Department of Licensing and Regulation for a two-building data center campus in Jayton, in rural Kent County, Texas, carrying an estimated investment of $4.8 billion. The filings, first reported by Data Center Dynamics, place the site along County Road 233...

Read more
Read Crusoe Plans $4.8bn Data Center Campus in Jayton, Texas
Crusoe has filed plans for two data center buildings in Jayton, Texas.
According to filings with the Texas Department of Licensing and Regulation, both facilities will be located along Country Roa...

Crusoe Plans $4.8bn Data Center Campus in Jayton, Texas

October 02, 2026 Crusoe

Crusoe has filed plans for two data center buildings in Jayton, Texas. According to filings with the Texas Department of Licensing and Regulation, both facilities will be located along Country Road 233 and P2390 at an unspecified address in Jayton, Kent County. Each data center will span 759,260...

Read more
Read Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link
Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company [said on Sept. 28](https://www.crusoe.ai/resources/newsroom/crusoe-developing-d...

Crusoe Confirms Google AI Campus In Texas With 531MW Wind Link

October 01, 2026 Crusoe

Crusoe is the developer behind Google's data center campus under construction in Armstrong County, Texas, the company said on Sept. 28. The site sits outside Amarillo, and it pairs with 531 megawatts of adjacent West Texas wind, a design that puts generation rather than land at the center of...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.