Edinburgh University to use waste heat from data center to warm up buildings
April 30, 2024
Edinburgh
Located in Scotland’s central belt, the Asanti Livingston Data Centre is a premier Tier III-compliant facility designed for high-density colocation and maximum resilience. Spanning approximately 12,000 square feet across two independent data halls, the site is one of the few in Scotland to offer fully independent dual-fed power supplies (2N+1 infrastructure) to every rack.
The facility is owned and operated by Atos Group, but since 2022 (and extended in 2025), a significant portion of its capacity is leased and marketed by Asanti.
| Distance | Site | About |
|---|---|---|
| 0.06 miles | ATOS: Livingston |
The facility is owned and operated by Atos Group, but since 2022 (and extended in 2025), a significant portion of its capacity is leased and marketed by Asanti.
|
| 6.35 miles | Pulsant: Edinburgh SC-3 |
|
| 8.78 miles | Apatura: Wester 3 | |
| 8.94 miles | Apatura: Wester 2 |
This facility is part of Apatura's Wester Hermiston AI Data Centre Campus in Scotland.
|
| 9.06 miles | Apatura: Wester Hermiston AI DC |
Apatura is moving forward with plans to develop the Wester Hermiston AI Data Centre Campus, a high-performance facility in Edinburgh designed to support hyperscale AI and cloud workloads.
|
| 10.12 miles | Shelborn: Edinburgh Green Campus |
Plans for a massive new data center at Edinburgh Park have been unanimously rejected by the City of Edinburgh Council.
|
| 10.42 miles | Pulsant: Edinburgh SC-2 |
Pulsant acquired this data centre as part of its purchase of Onyx in 2016.
|
| 10.63 miles | Pulsant: Edinburgh South Gyle SC-1 |
|
| 14.30 miles | ILI Group: Aurelius Expansion | |
| 14.49 miles | ILI Group: Aurelius Campus |
Renewable energy firm ILI Group is planning a new, state-of-the-art AI-focused data center campus, the Aurelius facility, in Newarthill, North Lanarkshire.
|
| 14.90 miles | Apatura: Larbert Expansion | |
| 14.95 miles | Apatura: Larbert AI DC |
A new AI data center campus is planned for Plean, Scotland, by UK renewables developer Apatura. The project is expected to deliver more than £2 billion of investment and create over 2,000 jobs.
|
| 14.96 miles | Carrier-Neutral Data Center Request Dataset |
Deep Green is building a data center in Edinburgh, UK.
|
| 15.78 miles | DataVita: Lanarkshire DV1 |
DV1, opened in 2016, stands as Scotland's premier, Uptime Institute-certified purpose-built co-location data centre, strategically located in the heart of the country.
|
| 17.13 miles | Apatura: Wishaw, Motherwell |
Apatura plans a significant £3.9 billion ($5.34bn) investment to develop a data center campus and battery energy storage system (BESS) at the former Ravenscraig Steelworks in Motherwell, North Lanarkshire.
|
| 18.56 miles | ILI Group: Cato Expansion | |
| 18.76 miles | ILI Group: Cato Campus |
Renewable energy firm ILI Group is planning the Cato data center campus in Auchtertool, Fife.
|
Asanti is a specialized colocation data centre provider led by a leadership team with extensive experience in the design, deployment, and management of mission-critical infrastructure. The company operates six strategically located data centres across the UK, selected for their superior network coverage and high power availability. By utilizing paired locations, Asanti provides robust business-live and disaster recovery options for critical IT workloads, all backed by a 99.99% uptime SLA and powered by 100% certified green energy.
April 30, 2024
Edinburgh
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas