Site: Flexential Tampa 3
Company: Flexential
Metro: Tampa
State: Flordia
Country: United States
Region: North America
Region: Americas
Address: Gross SqFt: 60,000
Usable SqFt: 35,400
Total Power: 2.6 Megawatts
Flexential's Tampa 3 site is former Peak 10. Flexential was created after Peak10 acquired ViaWest for $1.67 billion in August 2017. The rebranding from Peak10 to Flexential was announced in January 2018.
Datacenter
- 23,600SF of office and support space
- On-site, 24/7/365 technical assistance center (TAC)
Building:
- Building will support Category 5 three-second wind gusts
- Reinforced steel and precast skin – increased wind rating 150 mph
- 14” concrete tilt wall construction with Reinforced steel infrastructure
- EPDM mechanically fastened roof for key loading efficiency
- Supports N+1 or 2N on all facility infrastructure components
- 24" Raised Floor
Power:
- Two diverse power feeds from TECO
- 2.6 MW of continuous utility power
- Power whips and LV cabling routed under raised floor and cable tray for low voltage cabling
- Two 2.5 MW Caterpillar backup generators
- 72 hour generator fuel supply, indefinite runtime with refueling
Compliance:
- SSAE-16 type II
- (SOC1, 2, 3) audited
- ISAE 3402 audited
- PCI DSS certified
- HIPAA/HITECH compliant
- Self certified for Safe Harbor