DC Two: Bibra Lake

Latest Podcast 27 Aspiration Circuit
Decommissioned
Facility permanently shut down and decommissioned
Operated by: Adisyn

DC Two: Bibra Lake

Year Built: 2024
Utility Provider: Western Power
░░░░░░ Interested in this information? Contact us SqFt
Total Building Size

DC Two took over a nearly finished data center that an earlier tenant had left before completing its fit-out. The building became the company's main Perth site for colocation and VMware cloud services and replaced its smaller Osborne Park facility. Stage 2 was designed to run independently of Stage 1.

The data center closed in October 2024. Adisyn, as DC Two was renamed in 2023, gave up the lease to cut costs and fund its move into semiconductor technology. It sold the site's plant and equipment and moved its remaining customers to other Perth data centers.

Site History

  • In October 2024, Adisyn left the building, decommissioned the data center and sold its plant and equipment.
  • In September 2024, Adisyn agreed with the landlord to surrender the lease.
  • In June 2022, DC Two announced that the facility had received Uptime Institute Tier III Design Certification.
  • In June 2021, DC Two signed its first colocation customers at the site and began moving customers from its Osborne Park data center.
  • In May 2021, Stage 1 became fully operational.
  • In November 2020, DC Two's lease on the building began.
  • In 2013, the building was first designed and built as a data center.

Map and Nearby Locations

27 Aspiration Circuit
Adisyn Sites
Nearby Facilities

DC Two: Bibra Lake Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of DC Two: Bibra Lake

Distance Site About
6.54 miles Pier DC
8.23 miles Vocus: Bentley PER02
Vocus expanded Western Australian presence with acquisition of the Bentley Data Centre in 2014.
9.80 miles Equinix: Perth PE2
Equinix PE2 Perth Data Center is situated at Lemnos St, Shenton Park WA 6008, Australia. PE2 is one of two Perth-based data centres that Equinix inherited from the Metronode acquisition.
9.83 miles Equinix: Perth PE3
In 2021, Equinix launched its PE3 data center in Perth, Australia. The facility is the company’s third IBX facility in the city. The first phase offers capacity for around 700 cabinets across 1,830 sqm (38,600 sq tf). Equinix said it invested US$54 million (A$71.7 million) for phase one.
10.08 miles Vocus Perth
The facility was previously operated by Perth iX. Vocus Communications (ASX: VOC) acquired the long-established Perth data center operator Perth iX for $6.275m in 2011.
10.39 miles PureColo Perth
Retail colocation facility in Perth, Western Australia, operated by PureColo, the operating arm of Carrier Connect Data Solutions. N+1 power and cooling with raised floor and in-row containment for standard and high-density cabinets.
10.66 miles NextDC: P2 Perth
NextDC Perth P2 data center is located at 11 Newcastle Street, Perth WA 6000. The facility provides 12,000m2 of technical space with a target PUE of 1.15.
10.85 miles Equinix: Perth PE1
Equinix PE1 Perth Data Center is situated at 3 Tully Road, Perth WA 6004, Australia. PE1 is one of two Perth-based data centres that Equinix inherited from the Metronode acquisition. The facility spans 7,113 sq ft, with 4,811 sq ft of raised floor space available for colocation.
12.01 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.03 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.06 miles GreenSquareDC WAi1
12.09 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.11 miles Carrier-Neutral Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
12.91 miles DC Two Osborne Park
16.79 miles NEXTDC: P1 Perth
Located in Malaga, 13 km from the Perth CBD, P1 Perth is a Tier III certified data centre designed to keep Western Australian workloads close to critical network, power and submarine cable infrastructure.
17.08 miles Fujitsu Malaga
Fujitsu has agreed to sell that operating business to Next Capital by end-2026, but Centuria remains the landlord.
17.08 miles Centuria: Malaga
Centuria Industrial REIT acquired the Fujitsu-occupied data centre at 16 Mulgul Road, Malaga, Perth, in July 2024 for A$39 million.
17.10 miles Real Estate Data CenterInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us

Operating Company

Operated by: Adisyn

Adisyn Ltd is a public company listed on the ASX and based in Henderson, Western Australia. Its main business is 2D Generation, an Israeli subsidiary it bought in January 2025, which develops a low-temperature process to grow graphene on semiconductor wafers for chip interconnects. In August 2026 the company deposited graphene below 300°C on a full 200 mm wafer. A second subsidiary, 2D Radar Absorbers, holds an exclusive licence from Ramot, Tel Aviv University's technology transfer company, for radar-absorbing materials for drones.

Adisyn Services, a non-core unit, sells managed IT, cybersecurity and cloud services to Australian small businesses and places colocation customers in third-party Perth data centers. The company began as DC Two, which ran its own data centers in Osborne Park and Bibra Lake and modular crypto miner hosting sites at a Mid-West wind farm and a Victorian biogas plant. It left the Bibra Lake data center in October 2024 and sold the hosting assets to Metacorp Developments in 2025.

Adisyn History:

  • In April 2026, Adisyn raised A$14 million in a placement led by Regal and Meitav.
  • In January 2025, Adisyn completed its purchase of 2D Generation and agreed to sell its Miner Hosting assets to Metacorp Developments.
  • In October 2024, Adisyn surrendered the lease on its Bibra Lake data center and decommissioned the site.
  • In May 2024, Adisyn sold its VMware cloud platform to Zettagrid.
  • In October 2023, DC Two changed its name to Adisyn Ltd.
  • In May 2021, DC Two brought its Bibra Lake data center online.
  • In November 2020, DC Two listed on the ASX.
  • Founded in 2012 in Perth.
0
Facilities
0
Markets

News See all

Read Further details emerge about GreenSquareDC's plans for Perth data center
Further details emerge about GreenSquareDC's plans for Perth data center

Further details emerge about GreenSquareDC's plans for Perth data center

October 24, 2022 Perth

Further information has emerged about GreenSquare's data center plans. The company, which describes itself as an ‘emerging sustainability-oriented data center provider,’ has obtained planning permission for a new 96MW data center in Perth, Australia, after its application was approved by...

Read more
Read New company plans 96MW data center site in Perth, Australia
New company plans 96MW data center site in Perth, Australia

New company plans 96MW data center site in Perth, Australia

October 12, 2022 Perth

Urbis Pty Ltd, a design and planning firm, is reportedly applying to build an AU$600 million (US$379m) data center campus in the Belmont area of Perth, Australia, at 37 Abernethy Road. The application lists the client as GreenSquareDC, an “emerging sustainability-oriented data center provider’....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts
Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.