EdgeCore: Reno RN01

Latest Podcast 3000 USA Parkway
Under Construction
New facility under construction
Operated by:

EdgeCore: Reno RN01

Short Code: RN01
Site planned for 2026 and has expansions through 2027
PUE: 1.3
Utility Provider: NV Energy
Ownership: EdgeCore Internet Real Estate, LLC owns the building.
Lot Size: 56 acres

RN01 is building 1 of 3 on EdgeCore Digital Infrastructure's Reno campus in the Tahoe-Reno Industrial Center, about 250 miles and three milliseconds from Silicon Valley. EdgeCore builds each Reno building for a single hyperscale tenant, with dual power feeds from a dedicated on-site substation. The cooling design pairs an air-cooled, closed-loop chilled water system with support for direct-to-chip liquid cooling. EdgeCore rates its water usage effectiveness below 0.01 L/kWh.

EdgeCore laid its own 564-count fiber route from the campus to Reno's main interconnection point at 200 South Virginia Street. The company first targeted late 2025 for completion. That date slipped into 2026, and construction on RN01 was still under way in October 2026.

Site History

  • October 2026: Construction on RN01 was still under way (Reuters).
  • 2026: EdgeCore intervened in NV Energy's integrated resource plan case. It said it had executed Rule 9 agreements with NV Energy and requested a large-load electric service agreement (Las Vegas Review-Journal).
  • January 2026: The Nevada Division of Environmental Protection proposed an air permit for the campus's 126 backup diesel generators.
  • July 2024: EdgeCore revised the plan to three buildings totaling about 1 million sq ft.
  • October 2023: Grading and rock blasting were under way. Vertical construction had not started.
  • August 2023: EdgeCore announced the campus with an on-site substation and two buildings totaling 1.5 million sq ft, targeting completion as early as late 2025.

Map and Nearby Locations

3000 USA Parkway
EdgeCore Internet Real Estate, LLC Sites
Nearby Facilities

EdgeCore: Reno RN01 Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of EdgeCore: Reno RN01

Distance Site About
0.10 miles EdgeCore: Reno RN02
EdgeCore's RN02 is the second of three hyperscale data centers planned on its Reno campus in the Tahoe-Reno Industrial Center. Like the rest of the campus, it is designed for a single cloud or AI tenant.
0.13 miles EdgeCore: Reno RN03
EdgeCore's RN03 is the third of three hyperscale data centers planned on its Reno campus in the Tahoe-Reno Industrial Center. Like the rest of the campus, it is designed for a single cloud or AI tenant.
0.40 miles NOVVA Tahoe Reno
The facility includes six data halls across 300,000 sq ft (28,870 sqm) and a dedicated on-site 100MW N+1 substation from NV Energy.
0.48 miles Colovore: Reno, NV
Colovore's liquid-cooled colocation data center is located in Reno, Nevada.
0.71 miles Fleet: Peru Shelf Tech Park
Fleet Data Centers has officially broken ground on its maiden project, a facility situated on 256 acres within Tract’s Peru Shelf Technology Park inside the Tahoe-Reno Industrial Center (TRIC) in Storey County, Nevada.
0.77 miles Switch: Tahoe Reno 2
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
0.82 miles Switch: Tahoe Reno 1
0.92 miles Switch: Tahoe Reno 3
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
0.95 miles Tract: Peru Shelf Technology Park
Tract, a developer of data center parks, has commenced construction on its Peru Shelf Technology Park project in Storey County.
1.04 miles Switch: Tahoe Reno 4
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
1.16 miles Switch: Tahoe Reno 5
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
1.42 miles Switch: Tahoe Reno 6
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
1.68 miles Tract: Peru Ridge
Tract acquires an additional 517 acres in Reno, Nevada next to its existing project, Peru Shelf Technology Park.
1.81 miles Switch: Tahoe Reno 7
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
1.83 miles Vantage: NV13
1.84 miles Vantage: NV12
Vantage Data Centers is expanding its footprint with a new campus development near Reno, Nevada.
1.97 miles Switch: Tahoe Reno 8
This facility is part of Switch's The Citadel Campus in Tahoe-Reno.
1.98 miles Vantage: NV11
Vantage Data Centers is expanding its footprint with a new campus development near Reno, Nevada.
1.98 miles Vantage: NV14
2.39 miles PowerHouse: Reno 1
PowerHouse Data Centers operates a premier data center campus situated outside Reno, Nevada.
2.47 miles PowerHouse: Reno 3
This facility is a part of PowerHouse Reno Campus in Nevada.
2.56 miles PowerHouse: Reno 2
This facility is a part of PowerHouse Reno Campus in Nevada.
3.36 miles Metro ParkInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.11 miles Campus UltraInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.29 miles PrimeInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.42 miles Center BetaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.54 miles SouthInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
4.56 miles Center ProInterested in this information?Contact us
4.76 miles Prime PlazaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
5.24 miles Tract: Virginia Highlands 1
Virginia Highlands 1 is the first development phase of Tract's Virginia Highlands Technology Park, on the former TRW test-site parcel at 1 TRW Way in southern Storey County, Nevada.
5.87 miles Tract: South Valley Technology Park
Tract’s South Valley Technology Park, located seven miles southeast along USA Parkway, is a planned 1,500-acre project and can potentially support up to seven individual campuses.
6.49 miles Tract: Virginia Highlands Expansion
14.30 miles Tract: Silver Springs
Tract grew its Nevada footprint by acquiring roughly 1,060 acres near Silver Springs in Lyon County after securing a rezoning and development agreement.
15.20 miles ProInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
16.88 miles Ridge GammaInterested in this information?Contact us Data center facility details are available on request.Interested in this information?Contact us
17.56 miles CENTRA: 200 S Virginia (RNO01)
18.37 miles Centra: Reno 2
Centra is expanding its Reno campus with the development of RNO2, a new data center designed to support growing demand for cloud, AI, and high-density computing infrastructure in northern Nevada.
18.40 miles Lumen: Reno 1

Operating Company

Operated by:

Edgecore is headquartered in Denver, Colorado. It operates under the EdgeCore Digital Infrastructure brand and focuses on large, high-density campuses for hyperscale customers. Partners Group acquired the platform in November 2022 and later completed an additional equity investment in 2024. Current and planned development includes Mesa in Greater Phoenix, Santa Clara in Silicon Valley, the Tahoe-Reno Industrial Center near Reno, and multiple sites in Virginia including Ashburn, Culpeper, and Louisa County.

History:

  • 2025 Jun: Announced plans to invest $17B+ in a Louisa County, Virginia
  • 2024 Jul: Announced a new hyperscale campus in Culpeper, Virginia.
  • Edgecore
  • 2024 Sep: Partners Group completed a USD 1.9 billion equity investment in EdgeCore Digital Infrastructure.
  • 2023 Oct: Introduced a new brand identity as EdgeCore Digital Infrastructure.
  • 2023 Jan: Broke ground on a data center campus in Santa Clara, California.
  • 2022 Nov: Acquired by Partners Group.
  • 2017 company founded
0
Facilities
0
Markets

News See all

Read Centra Completes Structural Topping out of Reno Data Center
Centra Completes Structural Topping out of Reno Data Center

Centra Completes Structural Topping out of Reno Data Center

May 04, 2026 Reno

US data center firm Centra has topped out a new facility in Reno, Nevada. "We've officially topped out RNO2, our second Reno facility and the region's first carrier-neutral interconnection data center,” the company said on LinkedIn. “This moment represents our significant progress...

Read more
Read EdgeCore Lands $1.5bn Funding for Virginia Data Center Expansion
EdgeCore Lands $1.5bn Funding for Virginia Data Center Expansion

EdgeCore Lands $1.5bn Funding for Virginia Data Center Expansion

April 21, 2026 EdgeCore Internet Real Estate, LLC

US data center firm EdgeCore has secured new financing to support its build-out in Virginia. The company this week announced the completion of two financial transactions totaling $1.5 billion to fund the construction of two single-tenant hyperscale data centers in Northern Virginia, AS01 and...

Read more
Read Lumen data center in Reno gets operating license 26 years after launching
Lumen data center in Reno gets operating license 26 years after launching

Lumen data center in Reno gets operating license 26 years after launching

September 23, 2025 Reno

An existing data center in Reno, Nevada, was granted a new business license to operate after going without one for nearly 20 years. The 5,925 sq ft (550 sqm) building, on a 0.28-acre site at 220 Gardner Street, was set up in 1999 by Williams Telecommunications as a telecommunications facility....

Read more
Read EdgeConneX to Build Data Centers in Chicago and Atlanta
EdgeConneX to Build Data Centers in Chicago and Atlanta

EdgeConneX to Build Data Centers in Chicago and Atlanta

August 20, 2025 EdgeCore Internet Real Estate, LLC

Build-to-suit data center company EdgeConneX will set up data centers in Chicago and Atlanta for neocloud Lambda to support hybrid cooling with liquid-to-the-chip direct cooling and air cooling, and join two existing air-cooled facilities across both cities. "Our partnership with Lambda...

Read more
Read Edgecore completes $440 million debt financing deal
Edgecore completes $440 million debt financing deal

Edgecore completes $440 million debt financing deal

March 14, 2024 EdgeCore Internet Real Estate, LLC

EdgeCore Digital Infrastructure has completely secured a $440 million debt financing deal for its Silicon Valley data center buildout. This deal along with a $1.9 billion deal secured in January, were both structured as Green Loans, with ING Capital LLC as the sole Green Loan Structuring Agent....

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.