Data Center Campus

EdgeCore: Reno Campus

EdgeCore's three-building hyperscale campus in the Tahoe-Reno Industrial Center, about 250 miles from Silicon Valley. Each building serves a single cloud or AI tenant, powered by a dedicated on-site substation.

3 sites Reno
Under ConstructionPlanned
Multi-phase construction project
Developed by:

Campus at a Glance

3 data centers on this campus
First built in 2026 with expansions through 2028
Coordinates: 39.52622, -119.48002
░░░ Request Dataset MW
Operational
░░░░ Request Dataset MW
Under Construction
░░░░░ Request Dataset MW
Planned

EdgeCore Digital Infrastructure is developing a three-building hyperscale campus at 3000 USA Parkway in the Tahoe-Reno Industrial Center, about 250 miles and three milliseconds from Silicon Valley. EdgeCore builds each building for a single cloud or AI tenant. A dedicated on-site substation lets EdgeCore buy power on NV Energy's transmission rate schedule rather than a retail tariff, and each building takes dual feeds.

The cooling design pairs an air-cooled, closed-loop chilled water system with support for direct-to-chip liquid cooling. EdgeCore rates its water usage effectiveness below 0.01 L/kWh. EdgeCore also laid its own 564-count fiber route from the campus to Reno's main interconnection point at 200 South Virginia Street.

Campus History

  • October 2026: Construction on the first building was still under way (Reuters).
  • 2026: EdgeCore intervened in NV Energy's integrated resource plan case. It said it had executed Rule 9 agreements with NV Energy and requested a large-load electric service agreement (Las Vegas Review-Journal).
  • January 2026: The Nevada Division of Environmental Protection proposed an air permit for the campus's 126 backup diesel generators.
  • July 2024: EdgeCore revised the plan to three buildings totaling about 1 million sq ft.
  • October 2023: Grading and rock blasting were under way. Vertical construction had not started.
  • August 2023: EdgeCore announced the campus with an on-site substation and two buildings totaling 1.5 million sq ft, targeting completion as early as late 2025.

Buildings

Sites on this Campus

Site Operator Status Operational Building Size Built
EdgeCore: Reno RN01 EdgeCore Internet Real Estate, LLC
Under Construction
— — 2026
EdgeCore: Reno RN02 EdgeCore Internet Real Estate, LLC
Planned
— — 2027
EdgeCore: Reno RN03 EdgeCore Internet Real Estate, LLC
Planned
— — 2028

Map and Nearby Locations

EdgeCore: Reno Campus Power Growth Over Time

Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Developer

Developed by:

Edgecore is headquartered in Denver, Colorado. It operates under the EdgeCore Digital Infrastructure brand and focuses on large, high-density campuses for hyperscale customers. Partners Group acquired the platform in November 2022 and later completed an additional equity investment in 2024. Current and planned development includes Mesa in Greater Phoenix, Santa Clara in Silicon Valley, the Tahoe-Reno Industrial Center near Reno, and multiple sites in Virginia including Ashburn, Culpeper, and Louisa County.

History:

  • 2025 Jun: Announced plans to invest $17B+ in a Louisa County, Virginia
  • 2024 Jul: Announced a new hyperscale campus in Culpeper, Virginia.
  • Edgecore
  • 2024 Sep: Partners Group completed a USD 1.9 billion equity investment in EdgeCore Digital Infrastructure.
  • 2023 Oct: Introduced a new brand identity as EdgeCore Digital Infrastructure.
  • 2023 Jan: Broke ground on a data center campus in Santa Clara, California.
  • 2022 Nov: Acquired by Partners Group.
  • 2017 company founded
0
Facilities
0
Markets

Documents

Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.