Year Built: 2019
Utility Provider: UK Power Networks
░░░░░░░ Interested in this information? Contact us SqFt
Total Building Size
░░░░ Request Dataset MW
Operational Power

Digital Realty’s Crawley Unit 2 is the second building on the Crawley Campus – a purpose-built site for the London market. It is the second building to be built on the 16-acre Crawley campus and offers a variety of solutions to fit all business requirements. Designed to the highest energy efficiency, all power procured is 100% green. 132kV across the campus provides high reliability and a low cost of power for our customers.

The significant power availability (72MVA) provides customers with plenty of room to grow. There are diverse fibre routes available to metro connectivity hubs and long haul European fibre link

Facility

• Total building size 10,140m (109,146ft )
• Net customer space – 5,000m (53,000ft )
• 4x data halls
• High-density capacity
• Maximum floor load capacity 12KNm
• Maximum raised access floor height 800mm
• Raised floor to ceiling height 4m
• Goods lift maximum load 1.6t
• Entrance lobby
• Loading bay
• Secured storage area

Map and Nearby Locations

Unit 2, Connect Way, Manor Royal
Digital Realty Trust Sites
Nearby Facilities

Digital Realty: London LGW16 Power Growth Over Time

+0% since 2022
Operational
Construction
Planned
Prospective
Land Bank
In Doubt
Currently Operational
across NN Request Dataset sites
Under Construction
NN Request Dataset sites currently building
Planned / Prospective
NN Request Dataset sites announced, but haven't started construction

Sites within 15 miles of Digital Realty: London LGW16

Distance Site About
0.02 miles Rackspace London LON5
The Rackspace LON5 data center is located at Unit 1 Power Avenue in Crawley, UK. The facility spans 130,000 sq ft, with 71,106.39 sq ft dedicated to raised floor space for colocation.
0.11 miles Digital Realty: London LGW15
Digital Realty LGW15 is the first data centre on Digital Realty's Crawley campus in the Manor Royal business district near Gatwick, let to Rackspace.
0.25 miles Stellanor: Gatwick
The facility was previously known as the Redcentric Gatwick Data Centre (and before that, 4D Gatwick).
8.23 miles Redhill DC2
The site was previously operated by Digital Realty as LGW11. In 2024, Digital Realty sold its Redhill campus for £64 million ($80m).
8.24 miles Redhill DC1
Redhill DC1 is Building 1 of Galaxy Data Centers' Redhill campus in Foxboro Business Park, Surrey. Established in 2008, it was Digital Realty's LGW10 until the 2024 sale of the campus.
8.24 miles LexisNexis Redhill UK
8.25 miles Redhill DC3
The site was previously operated by Digital Realty as LGW12. In 2024, Digital Realty sold its Redhill campus for £64 million ($80m).
15.71 miles Pulsant: Croydon LN–1
17.28 miles Digital Realty: London (Chessington) LHR13
Digital Realty LHR13 is a purpose-fitted colocation data centre at Fountain Court in Chessington, south-west London, with five data halls inside the M25.
17.77 miles CapitaLand: Croydon Beddington Lane
CapitaLand: Croydon Beddington Lane is a two-storey colocation data centre on the Prologis Park industrial estate in Croydon, south London, owned by CapitaLand Ascendas REIT.
18.90 miles Dare DC: Orpington, UK
Data center consultancy Dare DC is facing fierce local opposition over plans to build a campus across ten hectares of green belt farmland in Bromley, south-east London.
19.01 miles Smallworld: Guildford
19.74 miles Level3 Tunbridge Wells
19.99 miles Stellanor: Byfleet
The Stellanor Byfleet Data Center was acquired by Stellanor Datacenters (backed by DWS) from Redcentric in October 2025.

Digital Realty: London LGW16 Data Center Photos See all

Unit 1 on Power Way is in the background
DRT's Crawley Unit 2 on Connect Way is in the foreground
Source: DRT

Unit 1 on Power Way is in the background

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake
[Goodman Group](https://baxtel.com/data-centers/goodman-group) and [Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) moved to buy up to 9.9% of Australian operator [NEXTDC](htt...

Goodman and Digital Realty Launch A$715M Bid for 9.9% NEXTDC Stake

November 05, 2026 NEXTDC

Goodman Group and Digital Realty moved to buy up to 9.9% of Australian operator NEXTDC at a 45.5% premium to the previous close. The buyers offered A$9.50 a share through an aftermarket bookbuild, a purchase Reuters valued at about A$715 million (US$501 million) after reviewing the term sheet....

Read more
Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Get Quotes
Get Started

Ready to Level Up Your Data Center Strategy?

Tell us what you're looking for. We respond within one business day.