Total Building Size
░░░░ Request Dataset MW
Operational Power

The North Building facility is located within the Manor Royal Business District, the biggest business park of the Gatwick Diamond area, as well as one of the south east's premier mixed activity employment hubs. This site is a 120,000 sq. ft. multitenant facility, housing Turn-Key Flex Datacenters.

Map and Nearby Locations

Unit 1 ( Power Avenue, Manor Royal )
Digital Realty Trust Sites
Nearby Facilities

Sites within 15 miles of Digital Realty: London LGW15

Distance Site About
0.05 miles Rackspace London LON5
The Rackspace LON5 data center is located at Unit 1 Power Avenue in Crawley, UK. The facility spans 130,000 sq ft, with 71,106.39 sq ft dedicated to raised floor space for colocation.
0.12 miles Digital Realty: London LGW16
0.31 miles Stellanor: Gatwick
The facility was previously known as the Redcentric Gatwick Data Centre (and before that, 4D Gatwick).
8.30 miles Redhill DC2
The site was previously operated by Digital Realty as LGW11. In 2024, Digital Realty sold its Redhill campus for £64 million ($80m).
8.30 miles Redhill DC1
Redhill DC1 is Building 1 of Galaxy Data Centers' Redhill campus in Foxboro Business Park, Surrey. Established in 2008, it was Digital Realty's LGW10 until the 2024 sale of the campus.
8.30 miles LexisNexis Redhill UK
8.31 miles Redhill DC3
The site was previously operated by Digital Realty as LGW12. In 2024, Digital Realty sold its Redhill campus for £64 million ($80m).
15.77 miles Pulsant: Croydon LN–1
17.36 miles Digital Realty: London (Chessington) LHR13
The 50,000 sq ft technical Tier III+ rated Chessington facility has five data halls each of about 1,000 sq m and with 1,440kW Uninterruptible Power Supply (UPS) capacity
17.75 miles DRT London (Croydon)
17.83 miles CapitaLand: Croydon
Croydon is a two-storey colocation data centre located 19 km south of Central London on the Prologis industrial estate.
18.95 miles Dare DC: Orpington, UK
Data center consultancy Dare DC is facing fierce local opposition over plans to build a campus across ten hectares of green belt farmland in Bromley, south-east London.
19.03 miles Smallworld: Guildford
19.75 miles Level3 Tunbridge Wells

Operating Company

Operated by:

Digital Realty Trust is a data center public REIT that owns and operates facilities in the United States and Europe. The company provides colocation and interconnection services and develops large multi‑tenant data centers for enterprise and cloud customers.

Its European platform expanded through the combination with Interxion, and through the purchase of European sites divested by Equinix following Equinix’s acquisition of TelecityGroup. The Telx acquisition added a U.S. interconnection and colocation business to Digital Realty’s portfolio.

Digital Realty Trust History:

  • In March 2020 completed the combination with Interxion, expanding its European platform.
  • In September 2017 completed the merger with DuPont Fabros Technology.
  • In July 2016 acquired eight European data centers from Equinix that were divested as part of Equinix’s TelecityGroup acquisition.
  • In October 2015 completed the acquisition of Telx.
  • On October 28, 2004 priced its initial public offering at 12 dollars per share.
0
Facilities
0
Markets
0MW
Megawatts

News See all

Read Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) wants to build its first [Indiana](https://baxtel.com/regions/indiana) data centers in Kokomo, proposing a three-building camp...

Digital Realty Picks Kokomo for 1GW Campus, Its First in Indiana

October 17, 2026 Digital Realty Trust

Digital Realty wants to build its first Indiana data centers in Kokomo, proposing a three-building campus with roughly 1GW of IT capacity on 476 acres of greenfield land. The global REIT published a project page for the development after city officials confirmed its interest earlier this month,...

Read more
Read Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site...

Digital Realty Proposes 1GW Data Center Campus In Kokomo, Indiana

October 16, 2026 Digital Realty Trust

Digital Realty is proposing a three-building data center campus on about 476 acres at Industrial Park North in Kokomo, Indiana, with a site plan that calls for roughly 1GW of IT capacity and completion in 2033. The company published the details on its Kokomo project page, and Kokomo Mayor Tyler...

Read more
Read Digital Realty Completes Structural Topping-Out of Second Seoul Data Center
Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027.

“The topping out isn't just a constr...

Digital Realty Completes Structural Topping-Out of Second Seoul Data Center

October 15, 2026 Digital Realty Trust

Digital Realty has topped out ICN11, its second data center in Seoul, South Korea. The facility is expected to become operational in the second half of 2027. “The topping out isn't just a construction milestone; it's a powerful symbol of what happens when incredible teams come together to build...

Read more
Read Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus
[Digital Realty](https://baxtel.com/data-centers/digital-realty-trust) has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the com...

Digital Realty Starts 24MW KIX15 Data Center At Osaka KIX Campus

October 10, 2026 Digital Realty Trust

Digital Realty has begun construction of KIX15, a 24-megawatt data center at its KIX Campus in Ibaraki City, Osaka Prefecture, Japan, the company announced on Oct. 7. The facility is being developed by MC Digital Realty, the operator's 50/50 joint venture with Mitsubishi Corporation, and is...

Read more
Read Digital Realty Starts Construction of KIX15 Data Center in Japan
Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty...

Digital Realty Starts Construction of KIX15 Data Center in Japan

October 09, 2026 Digital Realty Trust

Digital Realty’s KIX15 data center will add 24MW of capacity to its KIX Campus in Ibaraki City, Osaka Prefecture, Japan. Developed by MC Digital Realty, a 50/50 joint venture between Digital Realty and Mitsubishi Corporation, KIX15 will be the campus’s fifth building. Operations are expected to...

Read more
Read More News

Podcasts See all

Listen to E9 - Building Hyperscale AI Data Centers in Rural America With Wes Cummins
Listen to E8: Inside ERCOT, Black Start, Winter Storm Uri, and AI Data Center Load
Listen to E7:Now we are cooking with Gas! Behind the Meter Solutions with Nick Kruse
See More Podcasts

Documents See all

Ready to Level up Your
Data Center Strategy?