DC Two (D Coin) Collie
A solar-powered crypto-mining data center DC Two proposed in 2018 at a planned solar farm in Collie, Western Australia. It was not built.
Adisyn Ltd is a public company listed on the ASX and based in Henderson, Western Australia. Its main business is 2D Generation, an Israeli subsidiary it bought in January 2025, which develops a low-temperature process to grow graphene on semiconductor wafers for chip interconnects. In August 2026 the company deposited graphene below 300°C on a full 200 mm wafer. A second subsidiary, 2D Radar Absorbers, holds an exclusive licence from Ramot, Tel Aviv University's technology transfer company, for radar-absorbing materials for drones.
Adisyn Services, a non-core unit, sells managed IT, cybersecurity and cloud services to Australian small businesses and places colocation customers in third-party Perth data centers. The company began as DC Two, which ran its own data centers in Osborne Park and Bibra Lake and modular crypto miner hosting sites at a Mid-West wind farm and a Victorian biogas plant. It left the Bibra Lake data center in October 2024 and sold the hosting assets to Metacorp Developments in 2025.
A solar-powered crypto-mining data center DC Two proposed in 2018 at a planned solar farm in Collie, Western Australia. It was not built.
DC Two's original Osborne Park data center in Perth, which the company replaced with its Bibra Lake facility in 2021.
A former colocation and cloud data center in Bibra Lake, in Perth's southern suburbs, that DC Two opened in 2021. It closed in October 2024 when the company, by then renamed Adisyn, surrendered the lease.
October 24, 2022 Perth
Further information has emerged about GreenSquare's data center plans. The company, which describes itself as an ‘emerging sustainability-oriented data center provider,’ has obtained planning permission for a new 96MW data center in Perth, Australia, after its application was approved by...
Read more
October 12, 2022 Perth
Urbis Pty Ltd, a design and planning firm, is reportedly applying to build an AU$600 million (US$379m) data center campus in the Belmont area of Perth, Australia, at 37 Abernethy Road. The application lists the client as GreenSquareDC, an “emerging sustainability-oriented data center provider’....