Located in the previous regional headquarters for the GPU (later Met-Ed) electrical utility. 110,000 sq. ft. of raised floor data center space (most located below ground level).
Facility is located 100 miles from major Mid-Atlantic metropolitan areas but in separate power grids, geologic, and climate zones
A highly redundant configuration supports high-density environments.
We provide both locking cabinets and private cages to support enterprise and high density applications.
The facility is network neutral with multiple carriers in place and a redundant fiber ring that connects to 401 North Broad Street in Philadelphia, providing connections to all major carriers and public cloud on-ramps.
| Distance | Site | About |
|---|---|---|
| 0.07 miles | Directlink Reading PA | |
| 1.83 miles | Contegix Wyomissing, PA | |
| 3.02 miles | Omega Systems: Reading, PA |
The Omega Systems Reading data center is the company's headquarters and its original flagship facility. It is a privately owned, purpose-built site designed for high-security managed services.
|
DāSTOR provides enterprise data center solutions that leverage foundational infrastructure and interconnectivity to drive scalable and reliable digital services. With DāSTOR, customers seamlessly connect to partners and clients to drive better digital outcomes.
December 20, 2024
Philadelphia
July 07, 2023
Philadelphia
September 16, 2021
DāSTOR
Mar 12, 2026
Eric Bell
World
Feb 05, 2026
Eric Bell
World
Jan 15, 2026
Eric Bell
Applied Digital
Jan 05, 2026
Eric Bell
Dallas
Sep 04, 2025
Eric Bell
Texas