|
0.08 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.21 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.22 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
0.38 miles
|
South StationInterested in this information?Contact us
|
|
|
0.39 miles
|
Campus PrimeInterested in this information?Contact us
|
|
|
0.41 miles
|
East CampusInterested in this information?Contact us
|
|
|
0.45 miles
|
Point UltraInterested in this information?Contact us
|
|
|
4.14 miles
|
North ValleyInterested in this information?Contact us
|
The Second building of Amazon's Hermiston Campus is located at 77954 Cottonwood Bend. The site was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.16 miles
|
PrimeInterested in this information?Contact us
|
The Fourth building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.40 miles
|
Park GammaInterested in this information?Contact us
|
The Third building of Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The campus was built on 117 acres. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
4.40 miles
|
East ValleyInterested in this information?Contact us
|
Amazon's Hermiston Campus is located at 28803 NW Livestock Rd. The site was built on 117 acres with 9 acres for dedicated electrical substations. The campus consists of four buildings: one measuring 217,900 sq ft, and three measuring 250,000 sq ft each.
|
|
5.79 miles
|
ValleyInterested in this information?Contact us
|
|
|
5.85 miles
|
EastInterested in this information?Contact us
|
|
|
5.97 miles
|
South TowerInterested in this information?Contact us
|
|
|
6.01 miles
|
Ridge ProInterested in this information?Contact us
|
|
|
6.78 miles
|
North ValleyInterested in this information?Contact us
|
|
|
6.86 miles
|
Hub UltraInterested in this information?Contact us
|
|
|
6.94 miles
|
Hub AlphaInterested in this information?Contact us
|
|
|
7.02 miles
|
Point ThreeInterested in this information?Contact us
|
|
|
7.30 miles
|
PrimeInterested in this information?Contact us
|
|
|
7.33 miles
|
Point AlphaInterested in this information?Contact us
|
|
|
7.47 miles
|
PointInterested in this information?Contact us
|
The site started construction in 2012.
|
|
7.54 miles
|
Cloud HubInterested in this information?Contact us
|
|
|
7.57 miles
|
Plaza GammaInterested in this information?Contact us
|
|
|
7.90 miles
|
GammaInterested in this information?Contact us
|
|
|
7.93 miles
|
Sabey: SDC Umatilla
|
Sabey Data Centers is building a huge data center campus in Umatilla, Oregon. With two purpose-built buildings, totaling 714,540 square feet, SDC Umatilla campus will offer multiple diverse connectivity solutions.
|
|
8.07 miles
|
Point PrimeInterested in this information?Contact us
|
|
|
8.08 miles
|
Hub ProInterested in this information?Contact us
|
|
|
8.10 miles
|
Tower BetaInterested in this information?Contact us
|
|
|
8.12 miles
|
Park PrimeInterested in this information?Contact us
|
|
|
15.97 miles
|
Point ProInterested in this information?Contact us
|
|
|
16.06 miles
|
Tower AlphaInterested in this information?Contact us
|
|
|
16.14 miles
|
East CenterInterested in this information?Contact us
|
|
|
16.23 miles
|
RidgeInterested in this information?Contact us
|
|
|
16.38 miles
|
PrimeInterested in this information?Contact us
|
The primary load on the PDX109 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.42 miles
|
West CenterInterested in this information?Contact us
|
The primary load on the PDX111 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration
|
|
16.43 miles
|
Cloud HubInterested in this information?Contact us
|
The primary load on the PDX110 project is the data center with 60 MW of backup power generation arranged in a 2N+1 redundant power configuration (A&B path with catcher system).
|
|
16.45 miles
|
HubInterested in this information?Contact us
|
|
|
16.79 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.80 miles
|
Station GammaInterested in this information?Contact us
|
|
|
16.81 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.82 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
16.84 miles
|
Hyperscale Data CenterInterested in this information?Contact us
|
|
|
17.14 miles
|
CloudInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.14 miles
|
RidgeInterested in this information?Contact us
|
The campus is situated on a 127-acre plot west of Bombing Range Road, approximately one mile south of the Highway 730 and Interstate 84 interchange.
|
|
17.24 miles
|
EastInterested in this information?Contact us
|
|
|
17.31 miles
|
Park MaxInterested in this information?Contact us
|
|
|
17.32 miles
|
Station ProInterested in this information?Contact us
|
|
|
17.38 miles
|
Valley BetaInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
17.39 miles
|
PlusInterested in this information?Contact us
|
This data center is a part of Amazon's Bombing Range Campus. The project includes four single-story data center buildings, each measuring an impressive 215,461 square feet (20,000 square meters).
|
|
18.18 miles
|
WestInterested in this information?Contact us
|
|
|
18.33 miles
|
Park PlusInterested in this information?Contact us
|
|
|
18.35 miles
|
Metro RidgeInterested in this information?Contact us
|
|
|
18.51 miles
|
Core HubInterested in this information?Contact us
|
Construction started in 2012.
|
|
19.95 miles
|
Global CampusInterested in this information?Contact us
|
|